Page 1: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

11

www.eurocontrol.int/projects/eatmp/link2000www.eurocontrol.int/projects/eatmp/link2000

Page 2: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

22

LINK2000+ Lifecycle ContextLINK2000+ Lifecycle Context

Time

TowardsImplementation

StandardisationValidation

Trials

Standards validated

Pre-operationalPhase Completed

First phase EuropeanImplementation Completed

1996

Pre-operational Developments

Pilot Implementations

PETAL IIATIF/PROATN

EOLIA

2000 2005 2007/8

Towards Full

Regional

Implementation

First Phase European Implementation

and Operation

LINK2000+

Page 3: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

33

Objective of LINK 2000+Objective of LINK 2000+

To co-ordinate the implementation of selected air ground data link services for

ATC, at a number of ACCs/airports, with benefit driven equipage by airlines, based on ATN and VDL Mode 2 (ATC+AOC) from 2000 to 2007/8

to reduce controller workload…

with a safety benefit

Page 4: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

44

LINK2000+ HeadlinesLINK2000+ Headlines OPERATION DRIVEN, TECHNOLOGY ENABLED (not just

a COM project) European Implementation 2005-2008 (earlier for

PIONEERS) – globally compatible, validated, air ground data link services for ATC

– Infrastructure support for AOC Voluntary Benefit driven equipage to start followed by

Mandate (2008 timeframe) Comms. Based on ATN and VDL Mode 2 Strong link to FAA Program Build 1/1A

Page 5: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

55

LINK 2000 CharacteristicsLINK 2000 Characteristics

NO NEW CONCEPTS– Proof of operational concept (ODIAC, PETAL,

EOLIA, national trials)– Proof of technology (PETAL IIe, ProATN, EOLIA,

ATN trials infrastructure) NO NEW STANDARDS

– RTCA 189/Eurocae 53 (service inter-op)– ATN SARPS (ICAO doc. 9705)– AEEC Specs. 631, 637

Page 6: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

66

Benefits Benefits

Capacity Gain, Delay savings en-route– real-time and fast-time simulations– workload saving converted into capacity– capacity converted into delay savings

Cost of delay: defined by airlines/IATA

R/T workload workload capacity delay

Page 7: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

77

Operational BenefitsOperational Benefits

Equipage Capacity ATFM Delay

25% +3.4% -10%

50% +8% -31%

75% +11% -44%

+ a non-quantifiable safety benefit

Page 8: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

88

Current Implementation PlansCurrent Implementation Plans

Page 9: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

99

Current ATS/ATN Plans at ACCsCurrent ATS/ATN Plans at ACCs

01 02 03 04 05 06

ACCs

Objective: harmonised service deployment

MASP IIe Maastricht

ACM+AMC+ACL+FLIPCY+CAP

Spain

FLIPCY+ACL

Switzerland

ACM+AMC+FLIPCY ACL+DSC

Germany

ACM+AMC+ACL

Austria

ACLACM+AMC FLIPCY

ACM+AMC+DSC

France

ACL+AMCACM+FLIPCY

Page 10: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

1010

Commitment to ImplementCommitment to Implement

LINK 2000+ PSG set the following schedule:

06/01 "Key site identification” (Maastricht, Paris, Reims, Karlsruhe, Vienna, Zurich, Geneva, Madrid)

10/01 "Pioneer airline identification" 11/01 "Letters of commitment” 01/02 "Announcement of concrete

plans"

Page 11: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

1111

ConclusionConclusion

The Benefits are Real– R/T workload savings– Less room for error– Efficiency (more time to do the job)

With Commitment the Benefits can be obtained Soon

Page 12: 11 . 22 LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.

1212

QUESTIONS