1 - INTRODUCTION• Not a long time ago- Towers were not “pretty” nor “ugly”- Just essential
• Big changes mainly after the 60’s:- Thousands of OHL kms constructed- Electricity: from “ privilege” to “citizen
acquired right”, an obligation of the governments.- Presence of OH Lines in urban/rural areas.- Difficulty in obtaining new corridors- Growth in environmental conscience.
SC B2 Reykjavík Tutorial
Slide 02 of 48
SC B2, Iceland Meeting July 3-7th, 2011
2 - EVOLUTION ON THE SOLUTIONS
2.1 – First Aesthetic Studies
H. Dreyfuss & Associates, 1968
SC B2 Reykjavík Tutorial
Slide 03 of 48
SC B2, Iceland Meeting July 3-7th, 2011
H.Dreyfuss’ Pictorial Index – 47 Proposals
SC B2 Reykjavík Tutorial
Slide 04 of 48
SC B2, Iceland Meeting July 3-7th, 2011
H.Dreyfuss ’ Proposal H.Dreyfuss ’ Proposal
SC B2 Reykjavík Tutorial
Slide 05 of 48
SC B2, Iceland Meeting July 3-7th, 2011
2.2 – Cigré Studies
• 1986 Technical Brochure SC22 WG02: “The Environmental Impacts of High-Voltage Overhead Transmission Lines”.
• 1988 – Da Silva’s Research in ArchitectureSchool.- Federal University of Minas Gerais, Brazil:
Architecture School
- Year of survey: 1988
- 40 students splitted in 8 groups
SC B2 Reykjavík Tutorial
Slide 06 of 48
SC B2, Iceland Meeting July 3-7th, 2011
- Investigation: Visual impact of OHL crossing the city of Belo Horizonte
- Focus on aesthetic of the towers
- Eight reports produced.
• 1999 – SC22 WG14 Technical Brochure: “HighVoltage Overhead Lines Environmental Concerns, Procedures, Impacts and Mitigations”.
SC B2 Reykjavík Tutorial
Slide 07 of 48
SC B2, Iceland Meeting July 3-7th, 2011
2.3 – First Initiatives
• Compact as much as possible• Reduced number of elements• Transparent, invisible or camouflaged
Monopole Support Brazil
Portal GuyedSweden
Invisible Cross rope Argentina
SC B2 Reykjavík Tutorial
Slide 08 of 48
SC B2, Iceland Meeting July 3-7th, 2011
3 – THE MONOPOLE SUPPORTThe most used aesthetic solution
Why ?Simplicity, elegance, beauty, slenderness, low visual impact, reduced area for settlement.
Pole Characteristics/Details
Overlapping Flanged
SQUARE HEXAGONAL OCTAGONAL DODECAGONAL CIRCULAR
Cross-Sections & Joints
SC B2 Reykjavík Tutorial
Slide 09 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Pole Characteristics/Details
FLANGED BASE PLATE
Anchor bolt templates
Typical Foundation DetailsDIRECTLY EMBEDMENT WITH DENSED SAND BOX
Nuts for adjusting
SC B2 Reykjavík Tutorial
Slide 10 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Structural Characteristics- Very flexible structures- Non linear structural analyses required
Pole deflections during Tests
- Pole top deformations:• At EDS: 1.5 to 2% H (height)• Ultimate stage: 4 to 5% H
SC B2 Reykjavík Tutorial
Slide 11 of 48
SC B2, Iceland Meeting July 3-7th, 2011
4 – THE NEW CIGRE STUDIES
• New Working Group SC B2.08: Transmission Line Structures
•Task Force: TF3.1 – Innovative Solution for OverheadLine Supports
• Period: 1996 – 2009
Convenor: João BGF Silva – BR
Secretary: David Hughes/UK; F.Legeron / Canadá
• Questionnaire: Aesthetic solutions around the world.
SC B2 Reykjavík Tutorial
Slide 12 of 48
SC B2, Iceland Meeting July 3-7th, 2011
4 – THE CIGRE SC B2.08 – TF3.1 Questionnaire
17 Country ResponsesCigré SC B2.08 data bank
•Australia•Brazil•Canada•Denmark•Finland•France
•Iceland•Italy •Japan•Norway•Romania•South Africa
•Spain•Sweden•Switzerland•United Kingdom•United States
SC B2 Reykjavík Tutorial
Slide 13 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Electra Magazine nr. 250 - June 2010;Cigré Technical Brochure 416 and 416A
SC B2 Reykjavík Tutorial
Slide 14 of 48
SC B2, Iceland Meeting July 3-7th, 2011
5 – ADVANCED AESTHETIC SOLUTIONS
From the data bank:
• Unique solutions / For specific places
• Solution for a single line / or segment
• Standard aesthetic solutions
5.1 – Solutions for Specific Places: Fingrid first landscape towers: early 90’s
SC B2 Reykjavík Tutorial
Slide 15 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Finnish Solutions
SC B2 Reykjavík Tutorial
1994: Hiversaloon, Turku. Antti Nurmesniemi 1995: "Sinikurjet", Espoo.Studio Nurmesniemi.
Slide 16 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Finnish Solutions
SC B2 Reykjavík Tutorial
1995: Virkkala. B. Selenius 1996: Tuusula. IVO Power Engineering.
Slide 17 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Finnish Solutions
SC B2 Reykjavík Tutorial
1998: Jyvaskylan, Jorma Valkama
Slide 18 of 48
SC B2, Iceland Meeting July 3-7th, 2011
5.2 – Solution for a Line / Segment of Line400kV OHL Aarhus / Aalborg-DenmarkEltra competition: 48 proposals
The Wining entry – Erik Bystrup
SC B2 Reykjavík Tutorial
Slide 19 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
Danish Aesthetic Line
Suspention V-string Angle tower
Slide 20 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
Danish Aesthetic Line
Transition from Donau- todesign-towers
Shafts in the landscape
Slide 21 of 48
SC B2, Iceland Meeting July 3-7th, 2011
5.2 – Solution for a Line / Segment of LineThe 110kV Salmisaari-Meilahti TL, Helsinki.
SC B2 Reykjavík Tutorial
Designed by Prof. Antti Nurmesniemi
Slide 22 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
The Salmisaari Meilahti OHL
CAD drawings The Result
Slide 23 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
The Salmisaari Meilahti OHL
Finishing
Manufacturing
Slide 24 of 48
SC B2, Iceland Meeting July 3-7th, 2011
5.3 – Standard Aesthetic Solutions: French Experience
EDF / RTE Competitions:- 1994 Architects/Designers- 2004/2005 Manufacturers
5.3.1 - The 1994 competition:- 121 proposals for 400kV OHL supports- As much freedom as possible for creativity- Just electrical clearances, phase arrangements
SC B2 Reykjavík Tutorial
Slide 25 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Marc MIMRAM I. Ritchie, K. Gustafson
The “ROSEAU” Tower
The “FOUGERE” Tower
SC B2 Reykjavík Tutorial
The winners
Slide 26 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
French Experience
Perrault, Ove Arup Team
Card Game Swan-Neck
Euro RSCG Design, Tallon, Bet Jean Muller International Team
Slide 27 of 48
SC B2, Iceland Meeting July 3-7th, 2011
SC B2 Reykjavík Tutorial
French Experience
The Heron Aesthetics
Giugiaro Design Team
Haute-Couture
Starck,Meda, Arsene-Henry and Triaud, de Miranda Team
Slide 28 of 48
SC B2, Iceland Meeting July 3-7th, 2011
3.5.2 - The 2004/2005 Manufacturers competition:
- Functional specifications defining:
• Position of phases• Number of circuits• Silhouette suggestion• Materials to be used
The winner: Transel, Linuhonnun
SC B2 Reykjavík Tutorial
The “ARVERNE” Tower
Slide 29 of 48
SC B2, Iceland Meeting July 3-7th, 2011
6 – OH LINE TOWERS INTO ARTWORKS
• Aesthetic towers very successful in terms of publicacceptance.
• Towers evolving from OHL Supports to “urbanelectrical sculptures”.
• Finnish SculpturesFingrid landscape towers
SC B2 Reykjavík Tutorial
Slide 30 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Finnish SculpturesSC B2 Reykjavík Tutorial
Lempaala. Jorma ValkamaVihti, Nummela. Jorma Valkama
Slide 31 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Finnish SculpturesSC B2 Reykjavík Tutorial
Vaasa, Palosaari. Jorma Valkama
Slide 32 of 48
SC B2, Iceland Meeting July 3-7th, 2011
• ICELANDIC Studies
2008 Landsnet competition (98 proposals).
SC B2 Reykjavík Tutorial
Slide 33 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Icelandic Studies
SC B2 Reykjavík Tutorial
SuperstringYong-ho Shin
Walking Giants –The WinnerSebastian Krehn
Slide 34 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Icelandic Studies
SC B2 Reykjavík Tutorial
Slide 35 of 48
SC B2, Iceland Meeting July 3-7th, 2011
• New RTE Technique for Improving OHL Appearance
- “Art Installations” over existing OH Lines.- “Power Networks into Artworks” by Elena Paroucheva
SC B2 Reykjavík Tutorial
Slide 36 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Networks into Artworks SC B2 Reykjavík Tutorial
Art Installations on Overhead Line Supports
Towers Sculptures
Slide 37 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Networks into Artworks SC B2 Reykjavík Tutorial
Art Installations on Overhead Line Supports
Aesthetic Works on Amnéville-Mortois OHL
Slide 38 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Networks into Artworks
”Source Water” – Pylône nº 11 ”Source Energy” – Pylône nº 12
SC B2 Reykjavík Tutorial
Slide 39 of 48
SC B2, Iceland Meeting July 3-7th, 2011
7 - ANALYSIS OF THE SOLUTIONS• Increasing environmental concern:
- Short lines, long lines- Urban, rural landscapes
• For long / rural lines, cost absolutely relevant issue:- Invisibility- Transparence- Slenderness- Compaction- Camouflaged structures
SC B2 Reykjavík Tutorial
Slide 40 of 48
SC B2, Iceland Meeting July 3-7th, 2011
All together driven by cost!
Solutions for long OHL Towers
SC B2 Reykjavík Tutorial
± 600kV DC Line FURNAS 230kV Line ELETRONORTE500kV HSIL Line FURNAS
Slide 41 of 48
SC B2, Iceland Meeting July 3-7th, 2011
• For short / urban lines, aesthetic towers more and more used as attractive solutions:
1992 Seville Expo Tower - SpainVaasa, Palosaari. Jorma Valkama
SC B2 Reykjavík Tutorial
Nummela, Vihti. Konehuone/J. Valkama
Slide 42 of 48
SC B2, Iceland Meeting July 3-7th, 2011
• “Symbolic links” with “icones” of the societies:
- Architeture- History- Culture- Traditional symbols- Folklore- habits
SC B2 Reykjavík Tutorial
Slide 43 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Symbolism on Aesthetic Towers
SC B2 Reykjavík Tutorial
The Mouse Head TowerThe McDonald’s towers
Slide 44 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Symbolism on Aesthetic Towers
SC B2 Reykjavík Tutorial
Hameenlinna Landscape Tower
Slide 45 of 48
SC B2, Iceland Meeting July 3-7th, 2011
Symbolism on Aesthetic Towers
SC B2 Reykjavík Tutorial
”Haute Couture pour Pylône de Haute Tension”
Slide 46 of 48
SC B2, Iceland Meeting July 3-7th, 2011
8 – CONCLUSIONS
- Great growth on electricity demand will continue.
- Different challenges for utilities around the world to supply more power.
- Long, very long lines (up to 2500km) under construction in the world→ Aesthetic solutions driven by cost.
SC B2 Reykjavík Tutorial
Slide 47 of 48
SC B2, Iceland Meeting July 3-7th, 2011
- Other regions of the world, environmental is “the real issue”.
→ Alternative solutions, visually attractive “landscape towers”.
→ Camouflaged lines, underground cables, or lines with “more aesthetic”, “more beautiful” towers!