1 G53SRP: Feasibility analysis Chris Greenhalgh Chris Greenhalgh School of Computer School of Computer Science Science
28

11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

Jan 19, 2018

Download

Documents

Lawrence Bryan

3 Introduction Feasibility = whether a set of processes, if scheduled correctly, will meet their deadlines – –RTSJ: all active RealtimeThread s and AsyncEventHandler s (i.e. Schedulable s) Also known as “Schedulability” Can be determined analytically given enough information about the system…
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

11

G53SRP: Feasibility analysis

Chris GreenhalghChris GreenhalghSchool of Computer ScienceSchool of Computer Science

Page 2: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

22

Contents• IntroductionIntroduction• Process and scheduling model• Utilisation tests• Response time analysis• Run-time feasibility testing in RTSJ• SummarySummary

• Book: Wellings Ch. 10 (part), Burns & Wellings Book: Wellings Ch. 10 (part), Burns & Wellings 12.5-12.6; 13.1-13.5, 13.7, 13.9, 13.10 (part)

Page 3: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

3

Introduction• Feasibility

= whether a set of processes, if scheduled correctly, will meet their deadlines

– RTSJ: all active RealtimeThreads and AsyncEventHandlers (i.e. Schedulables)

• Also known as “Schedulability”• Can be determined analytically given

enough information about the system…

Page 4: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

4

(Simple) Process and scheduling model

• Fixed set of processes• Known worst-case execution times• Independent processes

– See later notes for some information on dealing with competition between threads

• Periodic; known deadlines• Zero time context switch• Correctness = meet deadlines• Priority-based scheduling

– Pre-emptive– No timeslicing

Page 5: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

5

Process parameters:• D = deadline (time period)

– RTSJ: ReleaseParameters deadline• T = period of periodic process

– RTSJ: PeriodicParameters period– Sporadic process minimum interarrival time– RTSJ: SporadicParameters minimumInterarrival

– Feasibility analysis not possible for aperiodic processes, i.e. no process set with an aperiodic process is feasible

• C = worst case execution time– RTSJ: ReleaseParameters cost

Page 6: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

6

Scheduling approach• Fixed Priority Scheduling (FPS)

– RTSJ: PriorityScheduler– Single fixed priority allocated in advance for each

process– Runnable processes executed in order of priority

• Deadline Monotonic Priority Order (DMPO)– Allocate highest priority to shortest deadline– Provably optimal for FPS– RTSJ: Priorities specified by programmer via SchedulerParameters (PriorityParameters)

Page 7: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

7

Schedulability (1): Utilisation tests

• Is there enough CPU capacity?– Sum(Ci/Ti) <= 1

• But:– Necessary (not sufficient)– D=T only

Fraction of CPUused by process

Total CPU(no. of CPUs)

Page 8: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

8

For example:• Process set

– Proc. T C– 1 5

2– 2 4

2• Utilization = 2/5+2/4

= 0.85– Might be schedulable

:-/

• Process set– Proc. T C– 1 5

3– 2 4

2• Utilization = 3/5+2/4

= 1.10– Definitely not

schedulable

Page 9: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

9

Example time-line (first case)

2/2 2/2

0 1 2 3 4 5 6

Time

Process

1

2

2/2

Process Release Time

Process Completion TimeDeadline MetProcess Completion TimeDeadline Missed

Executing

Preempted

(consider P1 cost=2.01=> U = 0.852!)

Page 10: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

10

Example time-line (second case)

2/2 2/2

0 1 2 3 4 5 6

Time

Process

1

2

2/3

Process Release Time

Process Completion TimeDeadline MetProcess Completion TimeDeadline Missed

Executing

Preempted

Page 11: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

11

Schedulability (2): Utilisation bound test (Liu & Leyland)

• Is there enough CPU capacity?– Sum(Ci/Ti) <= N(2(1/N)-1)

• But:– Sufficient (not necessary)– D=T only– 1 CPU

N N(2(1/N)-1)

1 1.0

2 0.828

3 0.780

4 0.757

10 0.718

0.69

Jolly clever formula worked out by Liu & Leylard (see Burns & Wellings)

Page 12: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

12

For example:• Process set

– Proc. T C– 1 5 2– 2 4 1

• Utilization = 2/5+1/4 = 0.65– Bound 2 processes = 0.828– Schedulable!

Page 13: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

13

Example time-line

1/1 1/1

0 1 2 3 4 5 6

Time

Process

1

2

2/2

Process Release Time

Process Completion TimeDeadline MetProcess Completion TimeDeadline Missed

Executing

Preempted

Page 14: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

14

Process Period ComputationTime Priority Utilization T C P U

a 50 12 1 0.24 b 40 10 2 0.25 c 30 10 3 0.33

Another example Process Set

• The combined utilization is 0.82 (or 82%)• This is above the threshold for three processes

(0.78) and, hence, this process set fails the utilization test

Page 15: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

15

Example time-line

10 2

10

10 10

0 10 20 30 40 50 60

Time

Process

a

b

c

10

Process Release Time

Process Completion TimeDeadline MetProcess Completion TimeDeadline Missed

Executing

Preempted

Page 16: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

16

Example Gantt Chart

c b a c b

0 10 20 30 40 50

Time

Page 17: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

17

Schedulability (3): Response time analysis

• Consider a worst-case scenario:– Every process is released at the same moment– Will they all meet their deadlines?– i.e. is the worst-case response time (completion

time) for each process <= its deadline?

Page 18: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

18

Release of process (nominal start time)

Time

Deadline

a

b

Interference from higher priority

processes, Iii

Units of execution

End of process execution

-> response time, Rii=Cii+Iii

c

execution time Cii = a + b +c

With preemptivefixed priority scheduling the onlyreason we aren’t actually running(given assumptions)

Page 19: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

19

Response time analysis (1)• Necessary and sufficient

– D <= T• (i) Ri = Ci+Ii

– Ri = response time– Ci = worst case execution time– Ii = interference

• (ii) Ri = Ci+SUMj (ceil(Ri/Tj)*Cj)– where j : Pj>Pi

– ceil(Ri/Tj) = max. number of times that process j released in time during i

Page 20: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

20

Response time analysis (2)• Solve by:

– wi(0) = Ci

– wi(n+1) = Ci +SUM j (ceil(wi

(n)/Tj ) *Cj)• where j : Pj >Pi

• From highest priority to lowest– until converges

• Schedulable iff– Ri <= Di

Page 21: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

21

For example:• Process set

– Proc. T C D P– 1 5 2 3 1– 2 4 1 2 2

• Process 2:– w2

(0) = C2 = 1

– R2 = w2(0) = 1

Page 22: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

22

R2 < D2 !• Process 1:

– w1(0) = C1 = 2

– w1(1) = C1+ceil(w1

(0)/T2)*C2 = 3

– w1(2) = C1+ceil(w1

(1)/T2)*C2 = 3

– R1 = w1(2) = 3

– R1 < D1 !

• Schedulable!

Page 23: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

23

Past paper questions• 2004 Q2, 2003 Q2, 2002 Q3, 2001 Q4,

2000 Q2.

Page 24: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

24

Run-time feasibility testing in RTSJ

• RTSJ Scheduler may implement run-time feasibility checking– Default PriorityScheduler just assumes any

process set without aperiodic processes is feasible• Scheduler manages a “feasibility set” of Schedulables – i.e. RealtimeThreads and AsyncEventHandlers

– To which any schedulability analysis is applied• Scheduler abstract class and Schedulable

interface include various methods for checking feasibility and conditionally changing parameters…

Page 25: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

25

Scheduler class (part)package javax.realtime;public abstract class Scheduler {` … protected boolean addToFeasibility(Schedulable s); protected boolean removeFromFeasibility(Schedulable s); public boolean isFeasible(); public boolean setIfFeasible(Schedulable s, ReleaseParameter r, MemoryParameters m, ProcessingGroupParameters g); …}

Now feasible?

Page 26: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

26

Schedulable class (part)package javax.realtime;public interface Schedulable extends Runnable { … public boolean addIfFeasible(); public boolean addToFeasibility(); public boolean removeFromFeasibility(); public boolean setIfFeasible( SchedulableParameters s, ReleaseParameter r, MemoryParameters m, ProcessingGroupParameters g); public boolean setSchedulingParametersIfFeasible( SchedulableParameters s); …}

Page 27: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

27

Summary (1)• Feasibility = schedulability, i.e. whether a

set of processes should meet its deadlines• Typically requires simplifying assumptions

– E.g. zero time context switch• Simple tests based on CPU utilisation

– Total CPU requirements– Liu & Leyland’s utilisation bound – => necessary or sufficient but not both

Page 28: 11 G53SRP: Feasibility analysis Chris Greenhalgh School of Computer Science.

28

Summary (2)• Response time analysis

– Models worst case simultaneous release of all processes– Simple case models pre-emption by higher priority

processes only– Can be extended to consider process conflict (e.g.

resource sharing)• RTSJ provides an API for run-time feasibility RTSJ provides an API for run-time feasibility

testingtesting– In In Scheduler Scheduler & & SchedulableSchedulable – SchedulerScheduler maintains feasibility set maintains feasibility set – ““Process” = Process” = SchedulableSchedulable, i.e. , i.e. RealtimeThreadRealtimeThread

or or AsyncEventHandlerAsyncEventHandler