11 April 2008 12th UN/CEFACT FORUM - Mexico 1 International Trade and Business Processes Group Chair: Jean-Luc Champion Vice Chair: Pat Toufar Welcome to the 12 th UN/CEFACT Forum in Mexico 7-11 April 2008
Jan 16, 2016
11 April 2008 12th UN/CEFACT FORUM - Mexico
1
International Trade and Business Processes Group
International Trade and Business Processes Group
Chair: Jean-Luc Champion
Vice Chair: Pat Toufar
Welcome to the 12th UN/CEFACT Forum in Mexico7-11 April 2008
11 April 2008 12th UN/CEFACT FORUM - Mexico
2
11 April 2008 12th UN/CEFACT FORUM - Mexico
3
TBG Working GroupsTBG Working Groups
Cross Domain
Buy – Ship – Pay
Independent Domain
11 April 2008 12th UN/CEFACT FORUM - Mexico
4
TBG Working GroupsTBG Working Groups
Only 4 minutes !!
11 April 2008 12th UN/CEFACT FORUM - Mexico
5
Cross DomainsCross Domains
Working Groups within Cross Domains
TGB17 - HarmonizationTBG14 - Business Process AnalysisTBG16 - Entry point and Website
TBG17 HarmonizationTBG17 Harmonization
Mary Kay Blantz, ChairMarion Royal, Vice Chair
Hisanao Sugamata, Vice ChairDelta Pelgrim, SecretariatSue Probert, Lead Editor
Andreas Schultz, QA Lead
11 April 2008 12th UN/CEFACT FORUM - Mexico
7
TBG17TBG17
• Approved Submission Guidelines & Procedures
• Approved single spreadsheet• For submissions and publication
• Approved TBG12 Accounting Entry submission• For CCL 08B
• CCL 08A in Audit (ICG)
11 April 2008 12th UN/CEFACT FORUM - Mexico
8
TBG17 - Next F2F Meetings
TBG17 - Next F2F Meetings
Interim Meetings
• 19 – 23 May: Seoul
• 11 - 15 August: Copenhagen
• 22 – 26 September: Geneva
11 April 2008 12th UN/CEFACT FORUM - Mexico
9
TBG 14 Business Process Analysis TBG 14 Business Process Analysis
Mexico Forum April 2008
Chair- Ian Watt
Vice Chair- Niki Sahling
11 April 2008 12th UN/CEFACT FORUM - Mexico
10
TBG 14 Accomplishments Mexico
TBG 14 Accomplishments Mexico
• MRI Sunday• 14 Key People• Refer Report & Attached Presentations
• Framework building CBP -> ODP5• Feedback sought• Doc with TBG steering
• Partnering – TBG17 & TBG14• Lunch and Learn
• Standing Room only ~40 Participants• Presentation on TGB14 homepage
• BuyShipPay model• Released to TBG
• TBG14 moved from R&D to Operational
UMM CCTS
Framework for Building Common
Business Processes
UN/CEFACT’s Registry & Repository
„Executeable“ Code
XML Schemata
Reference ModelsReference Models
Re-Useable Harmonised Process & Data Definition
Message Assembly
TGB’n Models
.XLSCCL
Core Components Submission Guidelines
BSP CCBP
Current-
Future-
Achievements
TGBn BRS/RSM
TBG14 Process Harmonization
TBG17 CC Harmonization
XML Schemata
TBG16 Entry Point & Web SiteTBG16 Entry Point & Web Site
Chair : Alain Dechamps
11 April 2008 12th UN/CEFACT FORUM - Mexico
12
TBG16 Entry pointTBG16 Entry point
• New TBG users (TBG1 & TBG17)• Will submit shortly to TBG steering a first draft of the Change Request procedure on XML « documents »• Most of the UN/EDIFACT DMRs were approved/ mended in accordance with the submitters.
Only two TBG 4 DMRs were postponed (no representives of Customs)
11 April 2008 12th UN/CEFACT FORUM - Mexico
13
Buy – Ship - PayBuy – Ship - Pay
• TBG01-Supply Chain• TBG02-UNeDocs and Digital Paper• TBG03-Transportation• TBG04-Customs• TBG05-Finance• TBG08-Insurance• TBG15-International Trade Procedures• TBG18-Agriculture• TBG19-eGovernment
TBG1 Supply ChainTBG1 Supply Chain
Chair: Coen Janssen
Vice chairs: Mounir El-Khoury, Dr. Kim Yong Jae
Secretary: Gilles Brandel
11 April 2008 12th UN/CEFACT FORUM - Mexico
15
Stakeholders / supporters of TBG1 work
Stakeholders / supporters of TBG1 work
Stakeholders / active contributors to the TBG1 work: • Swedish public sector (local authorities and county counsils) • Danish public sector• EDIFrance• CEN/EEG1 workshop• CEN/BII workshop • BoostAero• GS1 • Odette • AIAG• JAI• OASIS/UBL• Rosettanet • US Government• LMI / Defense Logistics Agency • Korea Polytechnic University
11 April 2008 12th UN/CEFACT FORUM - Mexico
16
Project statusProject status
PROJECT LEAD STATUS READY(*) CCL• eCatalogue Karina Duvinger BRS Jun 08 09A• Scheduling Samy Scemama BRS+RSM May 08 08B• Ordering Martin Forsberg BRS+RSM May 08 08B• Despatch / Rec. Jörg Walther BRS+RSM May 08 08B• Invoice Klaus Förderer BRS+RSM May 08 08B• Simple Invoice Gilles Brandel BRS+RSM Jun 08 08B• Remittance Advice Mounir El-Khoury BRS+RSM May 08 08B• eMarket research Helge Simonsen BRS ready 09A• Material Safety Data Delta Pelgrim Schemas Almost 08A
available• Quotation Gilles Brandel Proposal in progress Jun 08 09A• Trade Data for CustomsEdmund Gray Proposal in progress Jun 08 09A• Order Status Report Thomas Lyons BRS+RSM Dec 08 09A
RSM / CCL EDITING TEAM Pat Toufar, Coen Janssen, Martin Forsberg, Gilles Brandel, Thomas Lyons
• 08A Submission finalised• 08B submission May 08
11 April 2008 12th UN/CEFACT FORUM - Mexico
17
Meeting highlightsMeeting highlights
- Deadline for 08B submission agreed with TBG17: End of May 2008
- Contributed to standards maintenance proposal submitted to TBG Steering
- Joint use case submission to TMG regarding UCM from TBG1, TBG2, TBG6
- Harmonisation with US Government submission- Ordering, Forecasting, Inventory Adjustment, Order
Status Report - Joint meetings with TBG5, 6 regarding Invoice
requirements
TBG 2 Digital PaperTBG 2 Digital Paper
Chair: Michael Dill
Vice-Chairs: Sue Bravery,
Conor O’Riordan,
Eva Chan
11 April 2008 12th UN/CEFACT FORUM - Mexico
19
Forum Results - UNeDocsForum Results - UNeDocs
• TBG1 + TBG3 – Agreed to a joint group on methodology alignment with a link to TMG
• TBG3 – Agree to BIM’s concept & forward plan• TBG6 – Worked on Standards Maintenance Project• TBG15 – TBG2 contributing to the development of UNECE Rec
34• Trade Facilitation Seminar presentation
TBG3 Transport TBG3 Transport
Chair : Dominique Vankemmel (France)Vice-Chairs : Yoshi Kito(Japan), Simon Spoormaker (Nederland)
Secretary : Henk Van Maaren (Nederland)
Liaisons : ISO/TCs 104,154,204 & 8, ANSI X12I, WCO
11 April 2008 12th UN/CEFACT FORUM - Mexico
21
Achievements 7-11 April 2008Achievements 7-11 April 2008
Press release for the 20th anniversary of the Transport group (launch April 1988 in Washington)
BRS IFTM for International Forwarding & Transport endorsed and released by TBG 3 for review
through the UN/CEFACT procedure
Core Components Transport joint submission TBG2/3 harmonized by TBG17 ready for
publishing in CCL O8.A
Define approach to develop transport subsets from SHIP BIM (UNeDocs) and joint work with
TBG2 to define BIM methodology
Established next BRS development priority: Transport Instructions, Status Reporting
Prepare the next release V3 of the ITIGG worldwide implementation guidelines for EDIFACT
and XML (General recommendations, Principles and Rules, business processes and message
sets)
TBG3 Transport
11 April 2008 12th UN/CEFACT FORUM - Mexico
22
Achievements 7-11 April 2008Achievements 7-11 April 2008
Endorsed detailed TBG3 Work Plan for the year 2008
Planned 2 additional TBG3/ITIGG Interim meetings: 7- 11 July in Brussels and 6-10 October in
Paris (total 4 full week meetings in 2008) and conference calls
Joint meetings with other groups: TBG1 (joint project “Logistics Services”), TBG2 ( UneDocs
and BIMs), TBG6 (Security project),TBG14 (UMM Supply Chain Model harmonisation), TBG18
(Fish tracking/tracing)
GS1: initiated joint work to harmonize their BRAD Business model with the TBG3 BRS
Forwarding/Transport within the LIM initiative (Logistics Interoperability Model - eCOM
Standards Working Group)
Information on the latest ISO standards developments (TC104, TC204 and TC8)
Presentation of current implementations and projects: GS1, Australia BAHS, France GESFIM,
ShortseaXML, TOPAS….
TBG3 Transport
TBG8 - InsuranceTBG8 - Insurance
Chair: Andreas Schultz (DKV)
Vice-Chair: Beth Grossman (ACORD)
Secretary: Jan Vrijenhoek (SIVI)
Liaison(s) : ACORD, CSIO, TBG8 Europe/eEG7
11 April 2008 12th UN/CEFACT FORUM - Mexico
24
TBG8 - InsuranceTBG8 - Insurance
Worked on general issues:• Organisation• Country reports• Lunch & learn sessions
We had discussions with:• SWIFT• HR-XML• Automotive Industry• TBG17
11 April 2008 12th UN/CEFACT FORUM - Mexico
25
TBG8 - InsuranceTBG8 - Insurance
Worked on P6 project: Insurance Core Components Library
• Maintenance issues• Observation CCTS 3.0
• Submissions of changes/new CC’s
• Tools• Publication• Workplan
• Finalize submission III by June, Norwich meeting• Finalize submission IV by August, Hamburg meeting• Start Motor Claims data by end of 2008, New York meeting
11 April 2008 12th UN/CEFACT FORUM - Mexico
26
TBG8 - Insurance TBG8 - Insurance
best regards
TBG 15 – International Trade ProceduresTBG 15 – International Trade Procedures
Gordon Cragge – Chair
Jari Salo – Vice Chair
11 April 2008 12th UN/CEFACT FORUM - Mexico
28
Trade Facilitation Implementation GuideTrade Facilitation Implementation Guide• Very successful Face to Face meeting with Very successful Face to Face meeting with
ContractorContractor• Approved Project Implementation Plan and Approved Project Implementation Plan and
outline of Guideoutline of Guide
• Agreed Project communication and reporting Agreed Project communication and reporting proceduresprocedures
• Confirmed the participation and role of the Confirmed the participation and role of the Institutional and Country Reference GroupsInstitutional and Country Reference Groups
• NOW THE WORK CAN BEGIN ON PRODUCING NOW THE WORK CAN BEGIN ON PRODUCING THE GUIDETHE GUIDE
TBG 15 International Trade
Procedures
TBG 15 International Trade
Procedures
TBG 15 at 12th UN CEFACT Forum – MexicoTBG 15 at 12th UN CEFACT Forum – Mexico
11 April 2008 12th UN/CEFACT FORUM - Mexico
29
TBG 15 International Trade Procedures
TBG 15 International Trade Procedures
Recommendation 6• Move to ODP 5 – Public review
Recommendation 11• Move to ODP 7 – Publication
Single Transport Contract Code • Project needs stakeholder clarification
Recommendation 34• Move to ODP 4 – Forum review
Recommendation 35• Move to ODP 4 – Forum review
Supply Chain Project – scoping requirements with TBG14
TBG 15 at 12th UN CEFACT Forum – MexicoTBG 15 at 12th UN CEFACT Forum – Mexico
11 April 2008 12th UN/CEFACT FORUM - Mexico
30
TBG 15 International Trade Procedures
TBG 15 International Trade Procedures
Thank you Mexico and …Thank you Mexico and …
Hasta la vista, baby Hasta la vista, baby BUT…BUT…
11 April 2008 12th UN/CEFACT FORUM - Mexico
31
TBG 15 International Trade Procedures
TBG 15 International Trade Procedures
I’ll be backI’ll be back So see you in SenegalSo see you in Senegal
TBG18 AgricultureTBG18 Agriculture
Chair : Bruno PREPIN
Vice-Chair : Frans VAN DIEPEN
11 April 2008 12th UN/CEFACT FORUM - Mexico
33
Done this weekDone this week
• 5 project proposals submission validated by TBG 18 • Livestock Life Record Project• Electronic Data Exchange Proxy • Electronic Data Interchange of laboratory analysis in agriculture
and in the field of agri-food• Tracking and Tracing Fish • Cattle registration and movement data exchange and animal
passport
• Joint Project Proposal with TBG 12• P075 - Accounting Reporting – Joint Project Amendment
11 April 2008 12th UN/CEFACT FORUM - Mexico
34
Done this weekDone this week
• Ecert : RSM has been submitted to ICG.• eDAPLOS : RSM has been submitted to ICG.
• Demonstration of Ecert• Report of CEN EEG14/TBG18 in cattle data harmonization and
spatial information in agriculture.
• Development of BRS for all the 5 new projects• Preparation of a portfolio of TBG 18 work:
• Develop a long- term strategic vision for the TBG 18• Summary of all projects already done and under
development
11 April 2008 12th UN/CEFACT FORUM - Mexico
35
Next MeetingsNext Meetings
• CEN EEG14/TBG18 Meeting 12-15 May, Prague, Czech
• TBG 18 - F2F Meeting in September, Lyon France
• Ecert Phyto Implementation Meeting, November, Ottawa, Canada
TBG 19 eGovernmentTBG 19 eGovernment
Chair: J-P Henninot
Vice-chair: David Dowling
Secretary: Sylvie Colas
11 April 2008 12th UN/CEFACT FORUM - Mexico
37
TBG 19 activitiesTBG 19 activities
• Projects
• eArchiving status • Draft BRS under internal review (confirmed in June)
• Joint project ePP (Public Procurement)• Steering Committee held• Call for participation to be sent by Secretariat on next Monday
• And inclusion in the Forum press release
• Main first task• Collecting existing deliverables from different sources• Mapping them and and identify gaps towards « Public » needs
• Roadmap, method and timing updated and adopted
11 April 2008 12th UN/CEFACT FORUM - Mexico
38
TBG 19 activitiesTBG 19 activities
• Other items• Follow up of ad-hoc team reflexion regarding eGov modelling
activities• Initiated in Stockholm• Conclusion of the team: « seek guidance from Bureau »
• Is CEFACT the right venue for « higher level » topics (GSRM-Like)?• If something is to be addressed, how and with whom?
• This action initiated between team convenor and the Chair of CEFACT• Common concerns
• UBL convergence and eBII activities• Involvment in contacts/discussions under CEFACT chair initiative
• Harmonisation and interoperability• Consistent use of CCs between TBGs
• A case with « Party » and « organisation » • Is being addressed by involved actors• But also needs a broader view
• Agreed with TG1-TBG6 to make a note to TBG 17
11 April 2008 12th UN/CEFACT FORUM - Mexico
39
Independent DomainsIndependent Domains
TBG06-Architecture, Engineering and Construction
TBG09-Travel, Tourism and LeisureTBG10-HealthcareTBG12-Accounting and AuditTBG13-Environmental
TBG6 Architecture – Engineering - ConstructionTBG6 Architecture – Engineering - Construction
Chair: Bernard LonghiVice-Chair: Jun-Ichi Yamashita
Vice-Chair: Chris Hassler
11 April 2008 12th UN/CEFACT FORUM - Mexico
41
5 TBG6/TBG1 PROJECTS ON GOING
• eCatalog Project, hosted by TBG1• eTendering Project (Public and private Procurement)• Project Schedule and Cost Performance Management• Contract Financial Execution Management• Security for documents and messages, hosted by TBG6, but intersectorial project for all TBGs
TBG6 attendees in Mexico:
10 participants coming from France, India, Japan, United States…
TBG6 (AEC Gp)Architecture – Engineering - Construction
11 April 2008 12th UN/CEFACT FORUM - Mexico
42
Life cycle of public procurement Life cycle of public procurement
Desig
n /
Estim
ation
Desig
n /
Estim
ation
Ten
derin
gT
end
ering
Pro
ject M
anag
em
ent
Pro
ject M
anag
em
ent
Main
tenan
ceM
ainten
ance
Pro
curem
ent /
Strateg
y
Co
ntract
Co
ntract
eTenderingeTendering CFEMCFEM PSCPMPSCPM
• Design and Estimation ・・・ Not Yet.
• Tendering ・・・ e-Tendering ebXML Standards for BoQs/Princing doc exchanges
• Contract and Finance ・・・ Contract Financial Execution Management:
Initial Contract documents and Invoices
• Project Mgt ・・・ Project Schedule and Cost Performance Management Project: not yet
• Maintenance ・・・ Not Yet.
Not Yet!Not Yet! Not Yet!Not Yet!
11 April 2008 12th UN/CEFACT FORUM - Mexico
43
TBG6 Standards ProgressTBG6 Standards ProgressB
RS
RS
MS
CH
EM
AS
eTendering PSCPM CFEM Security
Candidate Release
Full UN/Cefact Standard (D07A): Monday 17 March 2008
11 April 2008 12th UN/CEFACT FORUM - Mexico
44
TBG1-TBG6 joint projects
Public and private Procurements projects For a global set of ebXML standards to meet user requirements
eTendering
Project Schedule and Cost Performance Management
Contract Financial Execution Management
Quotation
Catalogues
Ordering Delivering
InvoicingPayment Process
Supply chain – Trade messages – TBG1
Contract and Project Management – TBG6
Scheduling
Security
11 April 2008 12th UN/CEFACT FORUM - Mexico
45
eTendering Project (Public and private Procurement)and
Project Schedule and Cost Performance Management
TBG6 (AEC Gp)Architecture – Engineering - Construction
• entering maintenance phase• 2 “bundles” have been prepared for the 2 standards (BRS, RSM, XML Schemas, Code Lists) and will be posted on TBG6 Web • e-Flyers being drafted to “explain and promote” the standards• TBG6 Collaborative Web Site launched…in a few weeks
11 April 2008 12th UN/CEFACT FORUM - Mexico
46
TBG6 (AEC Gp)Architecture – Engineering -
Construction
Contract Financial Execution Management
• Requirements Model produced through the recent working group will be made available as a futher version of the working document on the TBG6 website.
• Other stakeholder’s groups have been invited to contribute, such as TBG 5 for payment process and TBG 19 for specific public issues. Invitations were open until mid June 2007……?!
• Contact will be maintained with TBG 14 and MRI to ensure compliance with the UMM and to assist the improvement of the production process.
11 April 2008 12th UN/CEFACT FORUM - Mexico
47
TBG6 (AEC Gp)Architecture – Engineering -
Construction
Security for documents and messages
• Use cases will be produced to start efficient production of the updated BRS:• Bid submission (Sujeet Bhatt / TBG6)• Invoice (Klaus and Richard / TBG1)• Contract notification (DCMA), with confidentiality management• A use case from Transportation group / TBG3 ?
• Finalise relevant standards identification and analysis• Enrich draft BRS with
• New functional analysis framework• Additional use cases (for 1st week of June 2008)
• Structure deliverables• Practice recommandations• Existing standards maintenance• New standard development
• Project leader is Sujeet Bhatt (India) and project editor Peter Borresen (DK)
11 April 2008 12th UN/CEFACT FORUM - Mexico
48
TBG6 (AEC Gp)Architecture – Engineering -
Construction
Coordination and cross participations results
• UN/CEFACT Standards Maintenance Project: new CR Form and log system (unique Entry point / TBG16) + unified maintenance process to allocate TBG responsibility and update existing standards
• Steering Committee for Joint project on ePP (TBG 1, 6 and 19): decision to contribute with TBG6 Public Procurement cycle
• Joint Meeting with TBG1: new Binary File ABIE (D08B), Multiple language Text.., Party and Organisation, UCM Use Cases implementation rules
TBG9 – Travel, Tourism and Leisure TBG9 – Travel, Tourism and Leisure
Chair: Paula Heilig
Vice-Chair: Akio Suzuki
11 April 2008 12th UN/CEFACT FORUM - Mexico
50
TBG9 – Travel, Tourism and Leisure
TBG9 – Travel, Tourism and Leisure
• Regional reports• Reports on other travel industry standards groups• Maintenance items• Review of new core components for next phase of small
scaled lodging• Review of new project proposals• Administrative items
TBG10 HealthcareTBG10 Healthcare
Chair: Frans van Bommel
11 April 2008 12th UN/CEFACT FORUM - Mexico
52
Main results of TBG10Main results of TBG10
• E-Business Task Force ISO TC215 (healthcare) will meet in Göteborg on 31 May 2008 (Result of MoU Management Group)
• There is now a concept liaison between UN/cefact Forum and ISO TC215 (healthcare)
• Frans van Bommel will retire at the end of 2008• TBG10 will search for a new active chairman
TBG12 – Accounting & AuditTBG12 – Accounting & Audit
Robert Lemense – Chair
Michel Lesourd – Vice-Chair
11 April 2008 12th UN/CEFACT FORUM - Mexico
54
TBG12 Closing 7-11 April 2008
TBG12 Closing 7-11 April 2008
• Meeting XBRL GL• XBRL Membership restoration• Effective in Dakar ?
• DMRs• 4 approved
• Meeting TBG18• Joint project financial statements Agriculture sector
• TBG17• ABIEs, BBIEs, ASBIEs• Finalise Accounting Entry
TBG13 Environmental Management and SafetyTBG13 Environmental Management and Safety
Chair : David Schwarz
Vice-Chair(s) : Glenn Miller
Vice-Chair(s) : Allan Adair
11 April 2008 12th UN/CEFACT FORUM - Mexico
56
Goals realized this WeekGoals realized this Week
• BRS has been accepted• TBG17 submission is in progress and will be forwarded upon
completion
• Move the Waste Notification Project forward• Resolution – TBG13 has agreed that the Austrian Submission
for the Notification processes for the Transboundary Movement of Waste will serve as one of the foundation documents for the ongoing project
• Resolution – The Domain Model for the characterization of waste will be included within the project framework for the Notification of Waste project
11 April 2008 12th UN/CEFACT FORUM - Mexico
57
Meeting results:Meeting results:
• For the Notification Project, UMM 2.0 will be used at the Methodology
• The Material Safety Data Sheet would be best positioned within the Waste Movement and/or Notification Message Domains• As part of “Characterization”, it will be included for
Notification, amended to Movement at a later point
11 April 2008 12th UN/CEFACT FORUM - Mexico
58
And finally
11 April 2008 12th UN/CEFACT FORUM - Mexico
59
Meeting results:Meeting results:
11 April 2008 12th UN/CEFACT FORUM - Mexico
60
Meeting results:Meeting results:
11 April 2008 12th UN/CEFACT FORUM - Mexico
61
UN/CEFACTSIMPLE, TRANSPARENT AND EFFECTIVE PROCESSES
FOR GLOBAL BUSINESS.