Golden Gate University 11.12.12 SF Remodel Project - Phase 7: Master Planning & Programming Objective 4 - Library Planning
Golden Gate University
11.12.12SF Remodel Project - Phase 7: Master Planning & ProgrammingObjective 4 - Library Planning
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
November 12th MeetingSteering Committee
2
I. Emerging Themes and Opportunities (review)
II. Objective 4 Space Planning
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Conceptual Organizational Model: Proposed
Instruction
InteractionDining (Café)
HUB
WellnessRelaxation
Law Faculty
Bookstore
SBA Lounge
University Concierge
SGA Lounge
Mini-break
AdjunctFaculty
Faculty
Faculty
Lawyering Skills
Program
Instruction
Learning Support
Staff
Instruction
Mini-break Seminar/
StudyMini-break
LAWSCHOOL
SCHOOL OF ACCT.
AGENOSCHOOL OF BUS.
U.G. PRGMS
PLUS
BRADEN SCHOOL OF TAX.
Faculty Support
Faculty Support
Faculty Support
Faculty Support
Faculty Support
Study
Study
Study
Study
Law Student Services
Business Student Services
Seminar/Study
Seminar/Study
Informal“Drop-In” Meeting
University Administration
Staff Lounge
Faculty Lounge
Formal “Scheduled”
Meetings
Book Storage
Law Book Browsing
Law Library Staff
LAW & BUSINESS LIBRARIES
3
Learning Support Services
Business Library
Technical Staff
Casual Study (loud, informal)
LEARNING COMMONS
Quiet/Scheduled
Study
Business Library
Research Staff
Business Book
Browsing
Law Quiet/Scheduled
Study
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Physical PlanningOne-block Radius
536 Mission
40Jessie
Mission S
treet
2nd Street
Golden Gate University
Ecker Place
Market
Street
1st Street
BART
BART
Main
Entry
Transbay Terminal
4
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Physical PlanningEcker Place Orientation
536 Mission
40Jessie
Mission S
treet
Golden Gate
University
1st Street
Ecker Place Pedestrian Walkway
5
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Physical Planning
Study Space
Learning Support Services
HUBService Point
Café
Urban Design employs social spaces to connect campus
6
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Buildings in section show planned organization; highlight focuses attention on Libraries
Physical Planning
7
40 Jessie
Quiet / No Food
536 Mission East WingWest Wing
B
P
1
2
3
4
5
6 Administration
CAFÉ
Administration
HUB
Study / Group Study
Classrooms
M
Staff
Interaction
Interactive Collaboration
Law School
Law School
Schools of Business
Schools of Business
Louder / Food Permitted
Book Storage
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Existing Planned
Law Library
BasementBasement
Law Library
Group Study Seats: 16 Rooms: 4Individual Seats: 126 Group tables: 76 Carrels: 51
_____________________________Total Basement Seats: 142
Group Study Seats: 8 Rooms: 2Individual Seats: 56 Group tables: 28 Carrels: 28
____________________________Total Basement Seats: 64
Law Library PlazaPlazaLaw LibraryGroup Study Seats: 12 (excl. ELJ) Rooms: 3Individual Seats: 228 Group tables: 116 Carrels:102
_____________________________Total Plaza Seats: 240
Unused Shelving: 388 LF
Group Study Seats: 12 (excl. ELJ) Rooms: 3Individual Seats: 228 Group tables: 116 Carrels:102
_____________________________Total Plaza Seats: 240
Unused Shelving: 388 LF
Law Library
497 Law Library seats 419 Law Library seats
University Library 169 University Library seats 300 University Library seats
GGU Total 666 total seats 759 total seats
Physical Planning: Seat Counts
8
40 Group Study room seats floors 2 - 5
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Basement
Physical Planning: Objective 4, Library
9
Summary:• Add 1,200 SF of
compact shelving• Add open shelving• Remove 78 seats; retain
64 seats• Retain Microfiche Room,
Computer Lab, and Law Review spaces
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Plaza
Physical Planning: Objective 4, Library
10
Summary:• Retain majority of floor
and spaces as they are• Possible re-allocation of
484 SF of space from Law Library offices (2) and shelving to Business Library Tech Services offices (2) and open offices (3)
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
1st Floor
Physical Planning: Objective 4, Library
11
Summary:• Law Library side
remains as-is• Wall behind current
lobby opens up into new Hub + Event Space
• New Library entry onto Ecker place enables Urban Planning / Design strategy to be realized
• Learning Support Services, collaborative interaction space, group study rooms, circulation and reference service point, and quiet study form the foundation of the new Learning Commons
MKTHINKGolden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
proprietary and confidential
Mezzanine
Physical Planning: Objective 4, Library
12
Summary:• Additional Group Study
rooms, quiet study space, and collaborative interaction space enliven the Mezzanine
• Student-serving (reference) Library staff plus the Director, a staff break room, storage space, and a shared work area fill the remainder of the floor