Introduction of Asset Management, Belgrade’s expirience Vladimir Taušanović Ms Sc Civ.Eng Belgrade Waterworks & Sewerage
43
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Introduction of Asset Management, Belgrades expirience

    Vladimir Tauanovi Ms Sc Civ.Eng Belgrade Waterworks & Sewerage

  • Danube river basin

  • Belgrade Waterworks FACTS

    CUSTOMERS 1.5 MIL consumers PRODUCTION 100 wells and pumping units 5 water treatment plants DISTRIBUTION 3.500 km distribution network length 200.000 customer units 22.000 valves etc.

  • WATER BALANCE 200 MIL m3 annual water intake 32% Unaccounted for Water (UfW) ENERGY CONSUMPTION 168 MIL kWh/YEAR (0.88 kWh/m3) ENVIRONMENT 0.15 MIL t CO2 carbon footprint

    Belgrade Waterworks FACTS (Contnd)

  • BWS STATUS QUO at the beginning of new millennium

    Aging & Deterioration of infrastructure assets Unadjusted strategic & tactical planning Required huge budget for Capital Maintenance Low price for service (potable w & ww collection) Lack of coordination between numerous departments Urgent needs for: SHORT TERM PLAN remedial measures LONG TERM PLAN WLC approach

  • WATER UTILITIES capital intensive companies Managing the infrastructure is the core business

    What do you have and where is it? What is it worth? What is its condition and expected remaining service life? What is the level of service expectation, what has to be done? When do you need to do it? How much will it cost and what is the acceptable level of risk? How do you ensure long-term affordability? HOW TO DEAL WITH CAPITAL OF SUCH SCALE ? Only systematic approach could yield results!

  • Asset Management

    The way how to keep your system in good health

    Management, engineering, financial, economic, and other practices applied to physical assets

    Providing the required level of service at acceptable level of risk and in the most cost-effective manner

    AM the art and science of making the right decisions

  • Asset Management

    Step by step approach

    State of the assets, inventory of assets Condition assessment, life cycle Assets valuation Level of service target Risk assessment and analysis Determine best technical / financial options ASSET MANAGEMENT PLAN building (long term funding plan)

  • Belgrade Waterworks (BWS) Way

    Design of AM concept Implementing ICT infrastructure Creation of GIS & AM Departments Education and training of STAKEHOLDERS Implementing AM procedures

  • Introduction of ICT infrastructure Progress, SQL server

    database Sybase IQ data warehouse 30 servers 1000 + PC units in network Optic cable local network

    (through sewerage mains) 300 locations covered

    - Technical IS (SCADA and remote control system,..)

    - Management IS (E-business, data management,

    . )

  • ACHIEVED Top management commitment IT Infrastructure implemented Improved organisation (GIS & AM Dept.) Assets inventory built GIS database in use in the whole company

    - after initial support by consultants IN-HOUSE know-how

  • Data integration (network, O&M, commercial, etc.)

    Integration of data:

    GIS based (centered) 70 workstations input

    data To all users available

  • FIELD SURVEY

    Pipe Atributes

  • ASSETS INVENTORY

    Elements - 120.000 items (pipes, valves, hydrants, ...) Atributes - more than 1 MIL (material, construction year, DN, ..

  • PIPES REGISTER

    Pipe Atributes

  • Distribution system potable water

    GIS network Water distribution, age based

  • PIPE STATISTICS

    E Total network length 3.500 km

  • VALVES REGISTER

    Valves by DN

  • BULK METERS REGISTER & LOGS

    Bulk Meters introduced, Accurate water balance

  • BUILDING REGISTER

    Plants, Wells, Pump. Stations, Office Buildings, etc.

  • VALUE OF BWS ASSETS

    Book keeping value (before) 300 Mil EUR

    Fair value (assessed) 1 Bill EUR Replacement value 2.5 Bill EUR

    Depreciation rate 1-2% /year

  • Asset Management: long term plan draft

    Looking foreward concept

  • Pipe Replacement 2002-2012

  • BENEFITS

    Improved knowledge of own system Data integration (network, O&M, commercial, etc.) Better internal coordination within the company Established sound technical tool for decision making

    support Improved effectives / efficiency Level of service Roadmap towards sustainability

    Specific starting results:

  • SPECIFIC STARTING RESULTS

    Asset registers available to all stakeholers (under permission)

    Recognized additional 1000 km of distribution network (mostly illegal)!!!

    Recognized 89 PMA (pressure managed area) as a supplement of traditional 5 altitudinal zones

    Decreased pressure level (1 bar) in part of system with high buildings (7% of network)

    Recognized 33 DMA (distict metered areas) enabling water balance brakedown

    Decreased energy consumption (up to 10%) with pumps frequency control supplement

    Established GIS based failure database (last 3 years)

  • 23 PI groups - activity based approach Data quality (17 PI) Water Balance (6 PI) Commercial losses breakdown (4 PI) Network Operation & Maintenance (5 PI) Flow metering (3 PI) DMAs (5 PI) Consumers (5 PI) Water quality (5 PI) PMAs (2 PI) O&M sections level (3 PU)

    MANAGEMENT REPORTING Performance Indicators based

  • DMA Balance Brakedown for Zone SLANCI

    INFLOW

    LEGEND:

    CONSUMPTION

    WATER LOSS

    Assumption: illegal double service lines due to extensive vegetable production

    DEMAND MANAGEMENT

  • DEMAND MANAGEMENT

    Billing Consumer Consumption

    Analysis based on w/m readings

    Regular DMA audits

  • DMAs scheme

    DEMAND MANAGEMENT

    Water balance control Irregular events monitoring

  • Pipe Failures in 2012 (City)

    Main

    Mains failure

    1 Number of failures

    LEGEND:

    OPERATION & MAINTENANCE

    Pipe failure track record annual reports rehabilitation plans

  • OPERATION & MAINTENANCE

    Valve Closing Scheme, Automatic Generation

    Pipe Burst

    Faster burst isolation Decreased customer

    minutes lost (CML) Link with valve

    condition assessment (valve failures)

  • Engaged resources overview in maintenance activities

    OPERATION & MAINTENANCE

  • Maintenance activities cost overview

    OPERATION & MAINTENANCE

  • Maintenance activities, cost structure

    OPERATION & MAINTENANCE

  • WATER QUALITY

    Water Quality Sampling Points

  • MANAGEMENT REPORTING Performance Indicators based

    23 PI groups - activity based approach Data quality (17 PI) Water Balance (6 PI) Commercial losses breakdown (4 PI) Network Operation & Maintenance (5 PI) Flow metering (3 PI) DMAs (5 PI) Consumers (5 PI) Water quality (5 PI) PMAs (2 PI) O&M sections level (3 PU)

  • UTILITY ANNUAL REPORTS

    ASSETS INVENTORY Mngmnt - NAM Report DEMAND Management - CDA Report

    OM Management - OM Report

    PRESSURE Management - PMA Report

    WATER LOSS Management - DMA Report QUALITY Management - WQ Report

    REHABILITATION Mngmnt - in progres

    ComercialDataAnalysis

    AssetsStockAnalysis

    Resources&Costs and FailureRatesAnalysis

    PressureZonesAnalysis

    UfW&NRW Analysys

    WaterQuality

    50/20/5 YearPlans

  • PERFORMANCE INDICATORS (PI)

    PI group 'Commercial losses (example) Operating (activity based) indicators: number of water meters older than 10 years, number of water meters with PAADC greater than 5 m3/day, number of oversized water meters larger than DN 50, number of water meters without consumption that are not

    categorized as hydrants or seasonal consumers. Required actions: Changing watermeters, Installing C class watermeters, Installing smaller watermeters, Checking consumer (watermeter stucked or broken?)

  • NEXT BWS STEPS

    Enhancing business processes on missing data collection and raising data quality (asset hierarchy, rehabilitation and replacement values, condition assessment rating, etc.)

    Business risk exposure and risk assessment for the both potable water and sewerage systems to be continued (part of AM plan)

    Implementation of 'look forward' concept instead of look backwards, prediction models, priorities, technical solutions, long term planning and future scenarios

    Financial sustainability, cash flow models for future scenarios, tariff settings, external funding and budgeting

    Long term Asset Management plan Continuous work on capacity building in BWS on further

    integration of AM practices within the company

  • WB-IAWD Program Cooperation on implementation of AM

    IN SMALL AND MEDIUM SIZE WATER UTILITIES

    IT solutions: Implementation of IT systems, Network Asset Management, Maintenance Management.

    Infrastructure AM model: establishment of an accurate network database, implementation business procedures

    Data Quality: Field survey, Evaluation and validation processes, Data quality control and improvement

    Planning and budgeting procedures Institutional Strengthening: Problem Analysis, Priorities

    for Change, Business Processes, Education and training

  • GIS & AM dep.

  • Thanks for your attention