Jan 13, 2016
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear.
Right to acquire the adjoining Obuom concession from Golden Star Resources.
Four gold zones already identified with some significant widths and grades (ie: 32 m of 3.62 g/t Au, 18 m of 4.48 g/t Au).
NI43-101 122,000 oz gold resource calculated in 2006. 2007/08 drill program increased NI43-101 resource to
327,621 oz. Project adjoins the Konongo Mine and is approx: 20 km
northwest of Newmont’s Akyem deposit (+8 m oz) and 30 km Northeast of Anglo/Ashanti Obuasi mine (+41 m oz).
Large land position at right address with multi million ounce potential.
AMI “A jewel amongst the majors”
North Ashanti Gold Project Location Map
North Ashanti Gold Project
• Located 200 km NE of the capital of Accra via paved/dirt road.
• 2 contiguous concessions (Beposo & Anuoro) covering 161 sq km.
• Right to acquire 100% of adjacent Obuom concession. • Fully equipped camp with electric & generator power.• 25 km NW of Newmont’s Akyem Mine: 8+ million oz
gold.• Borders the Konongo Mine to the north: 1+ million oz
gold.
Au Grades
0.5 – 1.0 ppm Green
1.0 – 3.0 ppm Red
>3 ppm Purple
Ore Block Model for (169,658 ounce gold) Beposo Main Zone
1500 metres strike length
ORE Block Model
Topographic Surface (green)
150–200metres depth
Base of Oxidation (BOX)
Section 719075N Beposo Main Zone
Au Grades
0.5 – 1.0 ppm Green
1.0 – 3.0 ppm Red
>3 ppm Purple
ORE Block Model
Base of Oxidation (BOX)
Topographic Surface (green)
50m
fro
m tr
ace
of h
ole
Topographic Surface (green)
Base of Oxidation (BOX)
ORE Block Model
Section 718715N Beposo Main Zone
50m
fro
m tr
ace
of h
oleAu Grades
0.5 – 1.0 ppm Green
1.0 – 3.0 ppm Red
>3 ppm Purple
Section 718575N Beposo Main Zone Topographic Surface (green)
ORE Block Model
Base of Oxidation (BOX)
Au Grades0.01 – 0.3 ppm Grey
0.3 – 0.5 ppm Blue
0.5 – 1.0 ppm Green
1.0 – 3.0 ppm Red
>3 ppm Purple
50m
fro
m tr
ace
of h
ole
Au Grades
0.5 – 1.0 ppm Green
1.0 – 3.0 ppm Red
>3 ppm Purple
Ore Block Model for Beposo (60,277 ounce gold) South East Zone
250 metres strike length
125 metres depth
ORE Block Model
Topographic Surface
(97,686 ounce gold) Anuoro North Zone Section 729680
Infrastructure
• Fully equipped camp (AMI owns the land & buildings).
- Living quarters, geological office, maintenance area, core storage, 3 new vehicles etc.
• Skilled local workers, with a full time foreman.• Security 24/7 – 365 days a year.• Electricity direct to the camp.• Good road access and foot paths throughout the
concessions.• Assay labs located within a one hour drive.
AMI Africa Adumasa Camp Facilities
Management Team & Board of Directors
• Dustin A. Elford – President, C.E.O. & Director- 26 years experience funding junior resource companies.
• William C. Pettigrew – C.F.O. & Director- 25 years experience in the funding and administration of juniors companies.
• Jay Sujir – Corporate Counsel & Independent Director- Senior partner with Anfield Sujir Kennedy & Durno
• Ryan Cheung – Consultant & Independent Director- Certified General Accountant.
• Simon Meadows Smith – Consulting Geologist in Ghana- President of SEMS Exploration Services Ltd. 14 years experience in Ghana. Last
discovery was sold to Ashanti Goldfields.
Corporate Information
• Listed on TSX-Venture Exchange• Trading Symbol – AMU• Issued shares – 37,202,036• Options – 3,750,000• Warrants - 5,740,000• 2008 year high and low - $0.42 to $0.01• Share price June 22nd 2009 $0.055• Current Market Cap $2,042,042
Contact Information
AMI Resources Inc.Suite 888 – 609 West Hastings StreetVancouver, B.C. Canada, V6B 4W4P: (604) 669-2901 F: (604) 669-8922Toll free: (888) 669-2901Website: www.amiresources.com
• William Pettigrew [email protected]