Page1.1
Facilities Master PlanCollege of Engineering | UW-Madison
1.0
Executive Summary
1.1
1.2 Master Plan Goals and Guiding Principles
1.2.1 Goals
Executive Summary continuedPage 1.2
1.2.2 Principles
Page1.3
1.3 Challenges and Opportunities
Executive Summary continuedPage 1.4
Page1.5
1.4 Relationship to CoE Strategic Plan
2
Vision: To be a world-class College of Engineering recognized for strengths in basic and applied research, educational innovation, technology transfer, and service to society.
Research Enterprise:
Educational Enterprise:
Research Infrastructure:
2 Strategic Plan (Internal) 2015-2020
Executive Summary continuedPage 1.6
1.5 Relationship to Campus Master Plan
1.6 Summarized Analysis of Existing Conditions
Figure 1A on page 1.7
Figure 1B on page 1.7
Page1.7
CoE Building Assessed:Fair/Poor Condition
42
#
11
9
CoE Building Assessed:Unsatisfactory Condition # CoE Building Assessed:
Good Condition#
7
6
1
1 –Engineering Hall ConditionsAssessment Recommendation:Renovate east & west wings forongoing use
2 – Engineering Research BuildingAssessment Recommendation:Replace with new construction
3 – Engineering Centers Building; Newfacility - not assessed.
4 – 1410 Engineering DriveAssessment Recommendation:Replace with new construction
1Excludes Water Science and Engineering Laboratory260% efficiency used for calculation of replacement space3Includes demolition, new construction and site utility relocation. Does not include relocation costs
Undergrad / Ratio T/TT Target ASF Target GSF Actual ASF Actual GSF