1 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
State Plan and Application February 28, 2011
2011 Orientation for State WAP Directors and Staff
Michael Peterson, Warren Cunningham, Jean Diggs, Trev Hall, Erica Burrin, & Ryan Middleton
2 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why? – 10 CFR 440.14– WPN 06-3, Revised WAP Application, Instructions and Forms– Formerly two “Files”
“Annual File” – application components that changed annually “Master File” – application components that were generally
unchanged from previous year
What is DOE looking for?– States no longer required to submit a Master File every year
Must maintain current information consistent with Program guidance “On-File” at the Grantee Office
Will be monitored by DOE staff during routine monitoring
WAP State Plan Instructions and Forms
3 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
State Plan Annual File Format
II.1 Grant Application – Standard Form 424, Version 02
II.2 Budget – SF 424 A
II.2.3 Budget Justification – PMC 140.2 or equivalent
II.3 Subgrantees - DOE F 540.5
II.4 Production Schedule
II.5 Energy Savings
II.6 Training, Technical Assistance and Monitoring Activities
Annual FileInstructions and Forms
4 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
State Plan Annual File Format (cont’d)
II.7 DOE-Funded Leveraging Activities
II.8 Policy Advisory Council
II.9 Hearings and Transcripts
II.10 Adjustments to “On-File” Information
II.11 Miscellaneous
II.12 Certification regarding Lobbying (SF-LLL) only if applicable
Annual FileInstructions and Forms
5 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Grant Application Standard Form 424 (SF-424)
– SF-424, Version 2, dated 10/05
– Required of each agency applying to DOE’s Weatherization Program for grants
– Also, required for subsequent funding changes (federal and non-federal)
Annual FileSection II.1 – Grant Application
6 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget Information (SF-424A)Section A – Budget Summary
– Lines 1 – 5, Columns a – g
– Line 1, enter new, or unexpended (e.g. carry-over) DOEand/or grantee funds.
– Use separate lines for each “other” funding source
Annual FileSection II.2 – Budget Information
7 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget Information (SF-424A)Section B – Program, Function or Activity (Columns)– Grantee Administration– Subgrantee Administration– Grantee T&TA– Subgrantee T&TA– Program Operations– Health and Safety– Vehicles and Equipment– Liability Insurance– Leveraging– Financial Audits
Annual FileSection II.2 – Budget Information
8 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget Information (SF-424A)Section B – Object Class Categories (Rows)– Personnel– Fringe Benefits– Travel– Equipment– Supplies– Contractual– Construction– Other– Total Direct Charges– Indirect Charges– Object Class Totals
Annual FileSection II.2 – Budget Information
9 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget Information (SF-424A)Section B
– The “Total” Column on page 1 should reflect the sum of all three pages
– Section B total should equal Section A total
– In Section B, subgrantee budgeted expenditures should all be reported in the contractual category (row f)
Annual FileSection II.2 – Budget Information
10 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget Information (SF-424A)Section B
– Health & Safety Exclusion: Budgeted expenditures under Health and Safety are not included in the calculation of the average cost per unit.
– Liability Insurance: Pollution Occurrence Insurance should be budgeted under this activity
– Financial Audits: Grantees should not budget financial expenditures for subgrantees expending less than $500,000 in federal funds (OMB Circular A-133)
Annual FileSection II.2 – Budget Information
11 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Budget JustificationGO-PF20A
– Required annually and with subsequent amendments
– Budget detail corresponding to Object Class Categories(rows a – j) from Section B of SF-424A
– Totals for each category must add up to the amount reportedin Section B
Annual FileSection II.2 – Budget Information
12 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Subgrantees
– List of subgrantees including the name, tentative allocation, number of units to be weatherized,
– Subgrantee contact information including name, address, contact information, labor source, Congressional district(s), and counties served.
Annual FileSection II.3 – Subgrantees
13 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Production Schedule
– Total number of planned weatherized and reweatherized units under the program rule and with grant funds
– Vehicles and Equipment ($5,000 or more) Average Cost per Dwelling Unit calculation – for those states that plan to amortize the cost of vehicles and equipment
– Average Cost per Dwelling Unit – calculation of expected average cost including vehicles and equipment
Annual FileSection II.4 – Production Schedule
14 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Energy Savings
– Provide estimate of expected energy savings (440.14(c)(4))
– Include the methodology used to calculate savings including the information sources for energy savings/unit
– If no methodology has been developed by the grantee, use DOE-provided formula (estimated homes to be weatherized x 30.5 MBTU)
This may skew state-level energy savings estimates – DOE is revisiting the approach used to estimate energy savings
Annual FileSection II.5 – Energy Savings
15 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Training, Technical Assistance, and Monitoring Activities
– Indicate method used to ensure quality of work and financial management at the local level
– Include description of activities to be undertaken during the program year with funds budgeted under T&TA or Admin for training and technical assistance and/or monitoring
– Establish milestones and estimate due dates
Annual FileSection II.6 – T&TA and Monitoring
16 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
DOE – Funded Leveraging Activities– Explain how DOE funds (as indicated on SF-424A) will be used
to increase the amount of assistance provided to eligible clients– Leveraging = obtaining additional program-targeted non-federal
cash or in-kind contributions as a result of Weatherization Program-funded activities
– Explanation of (1) how funds will be used to obtain non-federal resources, (2) how funds leveraged will support the DOE Weatherization Program, (3) the leveraging effect of those funds, and (4) rationale for the amount of funds used
– DOE funds must be used to obtain non-federal resources to: Increase the number of homes weatherized and/or Increase the scope or type of services provided Goal: At least a dollar for dollar return
Annual FileSection II.7 – DOE Leveraging
17 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Policy Advisory Council
– Policy Advisory Council (PAC) or State commission/council must be established in accordance with 10 CFR 440.17
– Provide names, groups, organization or agencies represented by members
Annual FileSection II.8 – Policy Advisory Council
18 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Hearings and Transcripts– One or more hearing(s) must be held to receive comments on
the proposed application. Provide location and dates of hearing(s).
– Requirement to give public notice 10 days prior to the hearing. Provide dates of public notices.
– Unofficial notes/minutes or the official transcript must be submitted to DOE. Include grantee responses to any questions which were not resolved at the hearing.
– Reminders: Plans are to be made available for review throughout the
state prior to the hearing Include in Plan, all of the agencies which may be funded
during the PY, whether funded initially or serve as alternates
Emphasize the state allocation formula, process used to determine local funding levels, anticipated allocations
Annual FileSection II.9 – Hearings & Transcripts
19 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Adjustments to On-File Information
– Include any revisions, since the previous program year, to the On-File Information (previously the Master File)
Annual FileSection II.10 – Revisions to “On-File”
20 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Miscellaneous
– Can include notes from public hearing and Policy Advisory Council meetings here
– Other activities not routinely administered as part of the Weatherization Program
– Disaster Relief Plan, Energy Crisis Response, etc.
Annual FileSection II.11 – Miscellaneous
21 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Lobbying Disclosure
– Standard Form - LLL is required ONLY if the grantee performs lobbying activities
– Other Assurances and Certifications that used to be listed under Section II.12 are no longer required. Grantees agree to these assurances when signing the new SF- 424, and check Box 21.
Annual FileSection II.12 – Lobbying Disclosure
22 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Administrative Funds
– Funds Based on Total Grant
– CAP of 10% Not more than 5% for Grantee Not less than 5% for Subgrantee
– EXCEPT: Local agencies receiving less than $350,000 of new DOE
funds, up to an additional 5% may be used Procedures required
Annual FileAdministrative Funds
23 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Administrative Funds (cont’d)
– New DOE and/or Stripper Well funding used for administrative purposes can’t exceed 10% of NEW funding
– EXAMPLE: Total New DOE Funds ($2,000,000) Plus New EXXON Funds ($200,000) Plus New Stripper Well Funds (1,000,000) Total Funding - $3,200,000 Of this Total Funding, $320,000 may be used The whole $320,000 may be taken out of DOE funds
Annual FileAdministrative Funds
24 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Administrative Funds (cont’d)
– Allowable uses of administrative funds Include: Salaries Telephone Costs Space Copying Supplies
Annual FileAdministrative Funds
25 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Allowable Administrative Costs Worksheet
– How to include carryover funds
– How to allocate additional 5% to agencies receiving less than $350,000
– How to determine the maximum allowable administrative costs under the grant
Annual FileAdministrative Costs Worksheet
26 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
$ New DOE Funding (formula allocation and/or DOE funds transferred from previous
grant)
+$ Other new funding this action
Item I. $ Total new funding subject to the “10% Administrative Cost” Rule
(Allowable Grantee Administration)
$ Grantee Administration total from line k(1) of the budget
-$ Less Grantee Administration carryover
Item II. $ Grantee Administration subject to the “10% Administrative Cost” Rule
Item III.
0.0 Divide Item II. by Item I and write out to four decimal places (Item III may not
exceed 5% or 0.0500)
Annual FileAdministrative Costs Worksheet - 1
27 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
(Allowable Subgrantee Administration)
$ Subgrantee Administration total from line k(2) of the budget
-$ Less Subgrantee Administration carryover
Item IV.
$ Subgrantee Administration subject to the “10% Administrative Cost” Rule
Item V. 0.0 Divide Item IV. by Item I and write out to four decimal places (Item V. must exceed 5% or 0.0500 but should not exceed the
subgrantee limitation.)
Item VI.
0. Add Items III. and V. and write to answer to four decimal places and must be less than
15% or 0.1500
Yes / No
If Item VI. Is greater than 10% or 0.1000, the grantee has specified criteria under 10 CFR 440.18(d) for which subgrantees will receive additional administrative funds and how much
extra they will receive.
Annual FileAdministrative Costs Worksheet - 2
28 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Only if Item VI is greater than 10% or 0.1000, determine theoretical subgrantee administrative cost limitation to compare with amount budgeted.
5% Item I.
Subgrantee administration allowance for new funds
$
+ 5% of
Sum of local agencies allocations below $350,000
+$
Item VII.
Subgrantee Administrative Cost Pool Component Limit
$
The maximum pool of new administration funds is 5% for the grantee (5% of Item I.) plus the amount calculated for the administrative cost pool component limit (Item
VII). The grantee may transfer some of it’s funds to subgrantees. Any carryover needs to be questioned and reprogrammed for production if not properly justified.
Annual FileAdministrative Costs Worksheet - 3
29 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Regulatory Citation for Training & Technical Assistance (T&TA)
– Section 440.23 - Oversight, Training, and Technical Assistance
– The Secretary may reserve from the funds appropriated for any fiscal year an amount not to exceed 10 percent to provide, directly or indirectly, training and technical assistance to any grantee or subgrantee. Such training and technical assistance may include providing information concerning conservation practices to occupants or eligible dwelling units.
Annual FileTraining & Technical Assistance
30 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Training & Technical Assistance (cont’d)
– Intended to maintain or increase the efficiency, quality, and effectiveness of the Weatherization Assistance Program at all levels
– Should be designed to maximize energy savings, minimize production costs, improve program management and crew/contractor “quality of work,” and or reduce the potential for waste, fraud, abuse, and mismanagement
– Local service providers should be the primary recipients of T & TA activities
– Annual File of the State Plan should describe how State will identify and address the needs of subgrantees in this area
Annual FileTraining & Technical Assistance
31 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why? – 10 CFR 440.14(b)(1) and (c)(3)– Also described in WPN 06-3, Revised Weatherization
Application, Instructions and Forms
What is DOE looking for?– Does the description of type of work to be done correspond to
H&S Plan? Priority List or NEAT Protocols? – Does the description outline allowable measures, including base
load?– If refrigerators are allowable, how are old units disposed of?
WAP State Plan On-File, Section III.3.1, Type of Work To Be Done
32 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
How to complete or review this section of the Plan?– If your Policy and Procedures Manual or Field Guide outlines the
type of allowable measures, then include that language or reference the correct Grantee document in this section of your plan.
– If your field protocols or energy audit has been reapproved since the last State Plan approval or if you have had an amendment, make sure that the ‘Type of Work To Be Done’ section is updated in the On-File Section and in the ‘Miscellaneous Section’ of your Annual File.
– Grantees can also simply list the typical measures installed and make sure that measures are pulled from approved energy audit protocols.
On-File, Section III.3.1, Type of Work To Be Done
33 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why?– 10 CFR 440.21– WPN 01-4 and 05-5
What is DOE Looking For?– Were energy audits approved within the last five years for each
dwelling type – single family, mobile home, and multi-family? – If Grantee is using a Priority List, is a site specific audit still
required?
On-File, Section III.3.2, Energy Audit Procedures
34 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
How to complete or review this section of the Plan?– Submission requirements outlined in WPN 01-4– Analytic methods and assumptions– Description of measures considered– Sample audit– Field procedures– Administrative requirements for each building type served
On-File, Section III.3.2, Energy Audit Procedures
35 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why?– 10 CFR 440.16 (g)
What is DOE Looking For?– What does the final inspection process look like in your State?– What percentage of homes require a final inspection?– Is there a requirement for client sign off/satisfaction?– Does the final inspection process provide for a signed and dated
inspection form?– Is each measure installed reviewed as part of the final
inspection?
On-File, Section III.3.3, Final Inspections
36 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
How to complete or review this section of the Plan?– Review the regulation 10 CFR 440.16(g)– Consult your audit protocols/ priority list to incorporate review of
measures into final inspection process– Consult your field standards– Get input from your subgrantees and/or technical committees.
On-File, Section III.3.3, Final Inspections
37 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why?– 10 CFR 440.23(e)– WPN 11-1, Section 3.1, D:
How the Grantee compares productivity and energy savings between subgrantees and how these comparisons are used in the development of T&TA activities and priorities
– WPN 11-1, Section 3.1, F:
An assessment of Grantee T&TA activities to determine whether these funds are being spent effectively.
On-file, Section III.3.4, Assessment of Effectiveness
38 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
What is DOE Looking For?– Is there a process for assessment of effectiveness of the
subgrantees other than monitoring reports?– Has the Grantee used WAP funds to complete an energy
savings evaluation?
How to complete or review this section of the Plan?– Set aside Grantee T&TA or Grantee Administration funds to
procure an energy evaluation of the program.– A number of Midwestern states have regular evaluation cycles
that range from a simple pre and post weatherization utility usage analysis to a more comprehensive approach with individual measure evaluation.
– ORNL may be able to provide technical assistance in this area.
On-file, Section III.3.4, Assessment of Effectiveness
39 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Why?– 10 CFR 440.22(3)(b)– WPN 11-1, Section 5.2 and 5.4
What is DOE Looking For?– Written permission is obtained from the building owner to
perform Wx services.– Not less than 50% of units are income eligible for duplexes and
four unit buildings– 66% of units are income eligible for buildings over four units– Benefits of WAP accrue primarily to low-income tenants
On-File, Section III.5, Rental Procedures
40 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
What is DOE Looking For? (continued)– Tenants will not be subjected to rent increases as a result of
WAP services– No undue or excessive enhancement shall occur to the value of
the dwelling– Does the Grantee require financial participation of the landlord?– Is there a statewide agreement template required between
landlord and subgrantee?
How to complete or review this section of the Plan?– Review your current State Plan– Does your State Plan, Policy and Procedures or Admin Manual
say the same thing?– Review the regulation and WPN, do you need to add or change
anything?
On-File, Section III.5, Rental Procedures
41 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
On File Sections– III.6.1 Description of Organization– III.6.2 Administrative Expenditure Limits – III.6.3 Monitoring Approach – III.6.4 Training and Technical Assistance Approach– III.6.5 Energy Crisis Plan
III.6.1-6. Describe Your Approach
42 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
These Sections Describe Your Team and Approach– Who are you?. – Describe your administrative forecast.
How much are you going to spend on admin? What are your goals and objectives? How will you measure yourself?
– How will you monitor and verify effectiveness?– How will you train the weatherization workforce?– How does your organization respond to crisis?
III.6.1-6. Describe Your Approach
43 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
How to complete or review these sections of the Plan?– Local & Non-local In-depth Knowledge & Feedback – Regulations & Program Guidance– How to find more information
Past Examples & Best Practices Additional Online & Traditional Resources
III.6.1-6. Describe Your Approach
44 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
On File Sections– III.6.1 Description of Organization– III.6.2 Administrative Expenditure Limits
WPN11-1 1.4– 10% Total / 5% Grantee– Less than 350k Additional 5%
– III.6.3 Monitoring Approach 10 CFR 600.240 Subpart C
– Must cover each program, function, or activity– Annual Reporting
WPN 10-09, 10-01, 9-1B, 01-6 5% Unit Minimum
III.6.1-6. Describe Your Approach
45 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Monitoring goals include determining…– Program compliance – Accountability– Program performance– Quality of Work– Problems areas and deficiencies – Assistance and Training Needs
III.6.1-6. Describe Your Approach
46 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
DOE Monitoring Rules– Comprehensive monitoring of each subgrantee at least
once a year.– Must include review of client files and subgrantees records.– Actual inspection of at least 5 percent of the completed
units. – Subgrantee should be briefed on the observations and
findings. – Within 30 days after each visit, the Grantee will prepare a
written report on its findings and send it to the subgrantee for corrective action
III.6.1-6. Describe Your Approach
47 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
DOE Rules Cont…– Noncompliance findings unresolved within forty-five days should
be reported to the PMC. Sensitive or significant noncompliance findings should be reported to the PMC immediately.
– Major findings should be tracked by the Grantee to final resolution.
– Annually the Grantee will summarize and review each subgrantee’s audit, program monitoring reports and findings for internal monitoring.
– Grantee will evaluate subgrantee needs, strengths, and weaknesses and provide assistance as needed for improvement.
– The results of this annual monitoring should be considered during annual planning and documented for future use by Grantee and PMC DOE monitoring staff.
III.6.1-6. Describe Your Approach
48 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Past Examples & Best Practices– State of Georgia Monitoring Approach – University of Georgia Extension Office
Monitoring Partnership 10% Units Monitored 12 Field Monitors / 12 File Monitors Energy Education Program
– Translated Education Material Customer Survey (185 Surveys) Program Evaluation (Longitudinal Study)
– 11 Energy Educators following 50 households each
III.6.1-6. Describe Your Approach
49 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
On File Sections– III.6.4 Training and Technical Assistance Approach
WPN 11-2 Grantee Allocation Maintain quality and efficiency throughout all program levels
– State Personnel– Agency Personnel– Contractors (Retention Agreement)
Minimum– Training needs assessment– What training Grantee will provide– Certification requirements– Subgrantee Comparisons and T&TA Integration– Grantee Oversight & Monitoring– Effectiveness Assessment
III.6.1-6. Describe Your Approach
50 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Past Examples & Best Practices– SC Office of the Governor, Office of
Economic Opportunity (OEO) & SC Technical College System Partnership
– 7 Regional Energy Efficiency Training Centers
Hot Climate - Whole House Weatherization training
BPI, RESNET, HERS Rater 1800 People Trained Props built onsite by each college Other Participants
– Electric Cooperatives– Utilities– Home Builders
III.6.1-6. Describe Your Approach
51 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Past Examples & Best Practices– State of Georgia and T&TA Approach
Southface T&TA Provider Partnership– 1200 People Trained– Typical BPI Oriented Curriculum– Training Innovation Center Award– Health And Safety Training– Circuit Rider Training Program
III.6.1-6. Describe Your Approach
52 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Additional Online & Traditional Resources WAPTAC
– Guidance/Regs– Best Practices– Technical Tools
» Monitoring Tools– Training Resources– Message Board– Ask the Expert
53 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
WAP Health & Safety
Authority from 10 CFR 440.21 (c) DOE Issued Revised H&S Guidance WPN 11-6
– Response to concerns with clarity and consistency in how health and safety issues are approached by grantees.
– DOE reconvened Health and Safety Committee to review trends and practices of the WAP network to update guidance.
Primary goal of Program remains “energy efficiency”.– Energy-related health & safety measures are those actions
necessary to maintain the physical well being of both the occupants and/or weatherization workers where:
Costs are reasonable as determined by DOE in accordance with the grantee’s approved Grantee Plan; AND
The actions must be taken to effectively perform weatherization work; OR
The actions are necessary as a result of weatherization work.
Grantees encouraged to budget H&S costs as a separate category to exclude costs from the overall average per-unit costs and avoid cost justification.
54 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Health & Safety Guidance WPN 11-6
Guides the grantee in creating their H&S Plan, which once approved by DOE, is used as the guiding document for subgrantees.
Addresses Action/Allowability, Testing, Client Education, and Training for the following Health and Safety Categories:
Air Conditioning/Heating Systems Appliances/Water Heaters Asbestos Biologicals/Unsanitary Conditions Building Structure/Roofing Code Compliance Combustion Gases Drainage Electrical Fire Hazards Air Pollutants Injury Prevention Lead Based Paint
Mold/Moisture Occupant Preexisting/Potential
Health Conditions OSHA and Crew Safety Pests Radon Refrigerant Smoke/CO Detectors Solid Fuel Heating Space Heaters Spray Polyurethane Foam Ventilation Window/Door Replacement
55 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
H & S Plan Minimum Requirements
Include health and safety expenditure limits, expressed as a percentage of average cost per dwelling unit, w/ justification and related historical experience.
Method to determine when DOE funds will be used and if they cannot, what other treatment will be sought.
System for remedy of potential health and safety issues including when partial weatherization can be conducted.
System for referral to other agencies.
System for determining when deferral is necessary.
Procedures for implementing training requirements.
Outline of testing to be performed based on guidance.
Protocols for informing clients of potential hazards.
Procedures for collecting known or suspected occupant health concerns.
56 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
H & S Plan Minimum Requirements
Strategy for implementation of ASHRAE 62.2 in 2012.
Strategy for smoke/CO detector guidance implementation.
Protocols on air conditioning and heating system repair and installation.
Procedures on handling problems resulting from combustion gas testing.
Strategy for implementing OSHA and crew safety guidance.
Protocols for addressing mold found in the client’s home.
Plan for implementing and verifying RRP and LSW compliance.
Cont.
57 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Health & Safety Budget Review
Does the state have a separate H & S budget?– If H & S items are not included in a separate H & S budget or are
defined as incidental repairs, they must be addressed as such consistently throughout the state and must be cost justified.
Expenditure limits must be “reasonable” and expressed as an per unit average.– Generally 10%.– Less assumes other funding is being utilized to address H & S.– More requires adequate justification relative to the increase.– 15% and up requires additional DOE group review.
58 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Health & Safety Plan Review
As described in §440.16(h), DOE will monitor the plan based on the following criteria:
(1) elimination of such hazards is necessary before, or as a result of, the installation of weatherization materials; and
(2) the grantee sets forth a limitation on the percent of average dwelling unit costs that may be used to mitigate such hazards, which is reasonable in light of the primary energy conservation purpose of the Weatherization Assistance Program.
Meeting the WPN 11-6 Guidance.– Is the required narrative/implementation strategy present?– Is it consistent with H & S guidance (cannot conflict)?
59 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Health & Safety Plan Review
Cont.
If an action/testing is “allowed” in guidance grantees can concur, create additional requirements/limitations, or not allow.
If “required” or “not allowed” – states must follow guidance.
Important to consider what the guidance is specifically referring to – in what instances the action is allowed.
Conducting certain actions will trigger specific testing, client education, and training requirements.
60 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
Health & Safety Guidance Table
Some common themes and requirements that should be considered when utilizing the Guidance Table are as follows:– Where removal or replacement is addressed, proper disposal is
required, and allowed as a H & S cost.– Where hazards are identified, clients must be informed in writing and
the document must be signed by the client and a copy maintained in the client file.
– State and local (or jurisdiction having authority) codes must be followed while installing health and safety measures.
– Workers must be qualified and adequately trained according to state and local (or jurisdiction having authority) codes specific to the work being conducted (electrical, plumbing, etc.).
– Where Actions/Allowability, Testing, Client Education, and Training are allowed or required, DOE funds may be used unless specified otherwise.
61 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
62 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
63 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
64 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
65 | Weatherization Assistance Program: State Plan and Application eere.energy.gov
66 | Weatherization Assistance Program: State Plan and Application eere.energy.gov