Transcript
Page 1: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

1

The Central Team

Ryan Sawasaki

Holger Keitel

Joanna Lennartsson

Lan Yu

Ben Thompson

Kevin Nadolny

Linda Strömgren

1

Page 2: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

22

Page 3: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

34

Page 4: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

4

Flying Box

6

Page 5: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

5

Flying Box

7

Page 6: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

6

Flying Box

8

Page 7: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

7

Flying Box

9

Page 8: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

8

Flying Box

10

Page 9: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

9

Flying Box

11

Page 10: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

1012

Page 11: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

11

Flying Box – 1st structural system - Floorplan

- steel construction with pile foundation

- concrete slab, use of composite beams

N

13

Page 12: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

12

Flying Box – 1st structural system – Section A-A

- perimeter MRF for lateral loads

- use of base isolation to decrease lateral loads

14

Page 13: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

13

Flying Box – 2nd structural system - Floorplan

- Cast in Place Concrete Construction

15

Page 14: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

1417

Page 15: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

15

Boxes in Forest

19

Page 16: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

16

Boxes in Forest

20

Page 17: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

17

Boxes in Forest

21

Page 18: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

18

Boxes in Forest

22

Page 19: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

19

Boxes in Forest

23

Page 20: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

20

Boxes in Forest

24

Page 21: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

21

Boxes in Forest

26

Page 22: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

22

Boxes in Forest – 1st Structural Concept

- Reinforced concrete

29

Page 23: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

23

Boxes in Forest – 1st Structural Concept

- Reinforced concrete

30

Page 24: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

24

Boxes in Forests – 2nd structural design – Second Floor Plan

- Cloumns and beams layout

- “Forests“ location need to be adjusted

33

Page 25: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

25

Foundation TypeFootingsSlab-On-GroundfoundationMat-type footingsStepped FoundationsCountinuousfoundationsGrillage FootingsBleacher Footings

Boxes in Forests – 2nd structural design – Third Floor Plan

- Customize the elements

- Eccentric center of stiffness

34

Page 26: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

26

Boxes in Forest – Auditorium

- candilevered auditorium

- truss construction, pile foundation

N

W 14x34W 16x57

W 14x34

W 14x74

36

Page 27: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

27

Boxes in Forest – Auditorium - Roof

- cable construction to reduce the steel amount

- bay size is 50 ft

W 14x26

W 16x57

cable

37

Page 28: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

28

Dry material storage

Material storage

Site offices

Cranes

Recycling area

Access for workers – before morning transit

Access for materials – least disturbing for on campus activities

38

Page 29: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

29

Structural System Cost Comparison – Concept 1 “Flying Box”

Structural System Option

Foundation Cost Floor 1 Cost Floor 2 Cost

Floor 3 Cost

Total Cost per

C.I.P Beams $27,883 $147,593 $147,593 $125,851v $448,922

Precast Beams $27,883 $229,920 $202,036 $180,294 $640,135

Steel $118,583 $253,850 $253,850 $233,897 $860,182

39

Construction permit fee Total permit fee is $ 108 000Fees included in the estimate: fire hydrant fee, sewer fee, arts development fees, LAUSD developer fees, dwelling unit tax and utility connection.

Page 30: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

30

Page 31: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

31

Cooling Load Estimate

• “Rule of Thumb”: 1 Ton/400 SF

• Required Airflow:

• Main Duct Run: 40” f for low pressure

– Equivalent to 76”x19”, 60”x24”, 37”x37”

• Horizontal Duct Run each floor: 28” f for low pressure

– Equivalent to 29”x23”, 56”x14”

CFMCFM 500,18)55100(*08.1

000,900

41

Page 32: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

32

Mechanical shaft sizing

Mechanical room sizing

37”

37”

18”min 6’-9”

5’-3”

Say 2’ for access

Plumbing

AHU: 9.6’ x 28’ x 6.01’ high

Hot Water heater

Electrical Equipment

22’

32’

Mech Room

32’x22’ = 704 SF

Minimum area for mechanical shaft

6.75’x5.25’ = 35.5 SF

42

Page 33: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

33

HVAC System

• Conventional System Option

• Under-floor Passive Distribution System Option

– Energy savings

– Less ductwork

– Easier maintenance

43

Page 34: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

34

Elevator Gen2™ with Remote Elevator Monitoring (REM ®)

Excavation depth: 47” (1,2 m) below finished slabTop height: 138” (3,5 m) above top slab– space for mechanical and emergency operationsDimensions: Door opening = 38” (900 mm ) 66” x 99” (1670 x 2520 mm) including construction tolerance

Costs: $50 000 (installation not included)

44

Low energy consumption Low speed Reduce need for maintenance by no switches, no gear-weel, no oil use. Only reusable components.Encourage usage of the stairs– fewer users –less mechanical wear

Page 35: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

35

Energy demand

45

• Energy Demand– 145 kBtu/SF for University Bldgs

(1995 DOE Data)1,300,000 kWh/year

• Peak Energy Demand– 9.33 W/SF (75th percentile 1995

DOE data) – With 4% annual growth: Total 2015

Peak Energy Demand = 500kW

Reduce energy consumption

• Few large Air Handling Units

• Low speed

• Conformity regarding components

Page 36: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

36

Solar Energy

• Solar Supply = 12 W/SF

– For 50% of roof area, max available solar energy = 180 kW, or 36% of estimated peak energy demand.

• @ $6/W, 500 kW of solar energy installed = $3,000,000, 42,000 SF!!

• @ $6/W, 180 kW of solar energy installed = $1,080,000

• $3/W Rebate (CA Energy Commission)

• Total installed cost = $540,000

• Energy savings as high as $25,000/year

46

Geothermal Energy

Our site is not very suitable for geothermal energy

Source: California Energy Commission “Preliminary Renewable Resource Assessment,” July 2003

Page 37: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

3747

Other Green Concepts – LEED requirements

• Green Roof

– Cut cooling costs 20-30%

– Stormwater, aesthetics, acoustics

• Waste heat recovery

• Thermal storage in building mass

• Climate façade

• IR reflective coatings/paint

• Hybrid Solar Lighting

• Low-flow plumbing fixtures

• Grey-water recycling

• Storm water control – native plant landscaping

•Reusable materials•Recycling• Prefered use of bio-mass materials•Low VOC•Low contamination

Page 38: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

3849

Page 39: 1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.

39

Green funding

48

• Public Interest Energy Research Program (PIER) California Energy Commission (solar energy)

• Environmental Protection Agency (EPA) Drinking Water State Revolving Fund (green roofs)

• Renewable Resources Trust Fund Emerging Renewables Program (solar energy)