Top Banner
1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners … Donna Holdridge, Jenni Kyrouac, Jim Mather, Douglas Sisterson
11

1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

Dec 17, 2015

Download

Documents

Baldwin Thomas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

1

Status of ARM Best Estimate Product

CrIS EDR Cal/Val Telecon7-May-2013

L. Borg, D. Tobin, R. Knuteson, N. R. Nalli

with support from our ARM partners …

Donna Holdridge, Jenni Kyrouac, Jim Mather, Douglas Sisterson

Page 2: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

2

ARM Best Estimate Sonde Product

Overview:ARM data is being collected at NSA, SGP, & TWP-Manus to validate NPP CrIMSS EDRs

• NSA & SGP: sondes launched 45 minutes prior and 5 minutes prior to overpass• TWP: single sonde launched 15 minutes prior to overpass

Zeroth Order Processing:• Sondes are interpolated onto common pressure grid• MWR PWV scaling applied to sonde RHs & WV mixing ratios• Sondes interpolated to overpass time• Data written to netcdf

Time [UTC}

Example Sonde Pair Launch Timing

Pres

sure

[hPa

]Primary ARM data products used:• sondewnpn: RS-92 balloon-borne sounding

system: Vaisala-processed• mwrlos: microwave radiometer: water liq, &

vapor along los path

Page 3: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

Status Phase-1 Sonde Launches

ARM-NSA ARM-SGP ARM-TWPLocation Barrow, Alaska, USA Ponca City,

Oklahoma, USAManus Island, Papua New Guinea

Regime Polar Continent Midlatitude Continent, Rural

Tropical Pacific Warm Pool, Island

Planned N 180 180 90

Launched n1 90 89 78

Launched n2 90 89 ---

Time Frame Jul - Dec 2012 Jul 2012 - Jan 2013 Jul 2012 – May 2013

• Sondes completed at NSA & SGP, but ongoing at TWP-Manus

3

Page 4: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

Temperature [K]

Pres

sure

[mb]

NSA

Temperature [K]

SGP

Pres

sure

[mb]

Temperature [K]

TWP-Manus

Pres

sure

[mb]

Sonde Profiles

H2O[g/kg]

Pres

sure

[mb]

Approximate Overpass Times•13:00 UTC (04:00 AKST)•21:00 UTC (12:00 AKST)

H2O[g/kg]

Pres

sure

[mb]

Approximate Overpass Times• 08:00 UTC (02:00 CST)• 19:00 UTC (13:00 CST)

• Limited collection sites, but representing a wide range of climatic conditions• Highly accurate measurements

4H2O[g/kg]

Pres

sure

[mb]

Approximate Overpass Times• 03:00 UTC (13:00 PGT)• 15:00 UTC (01:00 PGT)

Page 5: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

Pres

sure

[mb]

Altit

ude

[km

]

Interpolated Sondes

5

NSA

5

Sample MWR Measurements: NSA

Time [UTC]

Pres

sure

[mb]

NSA Overpass: 29-Jul-2012 21:31:26 UTC

Time [UTC]

pwv

[cm

]lw

p [c

m]

MWR Data

Time [UTC]

Time [UTC] versus MWR Scale Factor at NSA: mean_mwrsf = 1.018

Page 6: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

mwr scale factor

mean=1.018

mwr scale factor

mean=1.0348

mwr scale factor

mean=1.0239

Time [UTC]

mw

r sca

le fa

ctor

NSA

Time [UTC]

mw

r sca

le fa

ctor

SGP

Time [UTC]

mw

r sca

le fa

ctor

TWP

MWR Scale Factors

6

• Mean MWR scale factors are close to 1

Page 7: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

meanstdev

H2O Difference [g/kg] H2O Difference [g/kg]

Temperature Difference [K]Temperature Difference [K]

Pres

sure

[mb]

NSA SGP

Pres

sure

[mb]

Pres

sure

[mb]

Pres

sure

[mb]

Differences Between Sonde Pairs

7

• This analysis does not follow the official 1km/2km layering methodology for reporting statistics

• SGP - The variability in temperature that occurs within 45 minutes is 1°K

Page 8: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

8

CrIMSS GDAS

CrIMSS and GDAS Matchup

H2O [g/kg]

Pres

sure

[mb]

• This analysis does not follow the official 1km/2km layering methodology for reporting statistics

Pres

sure

[mb]

Temperature [K]

Page 9: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

9

CrIMSS GDAS

Temperature [K]

Pres

sure

[mb]

RH [%]

Pres

sure

[mb]

CrIMSS and GDAS Matchup

• This analysis does not follow the official 1km/2km layering methodology for reporting statistics

Page 10: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

meanstdev

ARMBE Comparisons with CrIMSS & GDAS

Temperature Difference [K]

Pres

sure

[mb]

NSA

ARMBE-CrIMSS

Temperature Difference [K]

Pres

sure

[mb]

ARMBE-GDAS

Temperature Difference [K]

SGP

Pres

sure

[mb]

ARMBE-CrIMSS

Pres

sure

[mb]

Temperature Difference [K]

ARMBE-GDAS

TWP

Temperature Difference [K]

ARMBE-CrIMSS

Pres

sure

[mb]

Temperature Difference [K]

ARMBE-GDAS

Pres

sure

[mb]

10

• Analysis uses CrIMSS EDRs with MX Version 5.3 - 6.5• This analysis does not follow the official 1km/2km layering methodology for reporting

statistics

Page 11: 1 Status of ARM Best Estimate Product CrIS EDR Cal/Val Telecon 7-May-2013 L. Borg, D. Tobin, R. Knuteson, N. R. Nalli with support from our ARM partners.

11

Next Steps

• ARMBE v0p0 product was distributed internally December 26, 2012

• ARMBE v0p1 product will be distributed to team within the week• Zeroth Order ARMBE product including recent TWP-Manus sondes• Updated sonde averaging scheme• Updated figures• Additional variables saved to netcdf

• ARMBE v1 product under development • Use gdas data in sonde interpolation and to account for scene spatial

variability• Perform vertical averaging and resolution reduction using official 1km/2km

methodology• Use CrIMSS EDRs with more recent MX versions• Include cloud height information

• We recommend that Phase-2 of the sonde launches begin