1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running a development project. 1
62

1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Dec 17, 2015

Download

Documents

Dwain Atkins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1. Software Process Models(Sommerville Chapters 4, 17, 19, 12.4)

A software process model is a standardised

format for • planning• organising, and• running

a development project.

1

Page 2: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Hundreds of different models exist and are

used, but many are minor variations on a

small number of basic models.

In this section we:

• survey the important basic models, and • consider how to choose between them.

2

Page 3: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.1. Planning with ModelsSE projects usually live with a fixed financialbudget. (An exception is maintainance?)

Additionally, time-to-market places a strongtime constraint.

There will be other project constraints such as staff.

3

Page 4: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Project constraints

money

timeComputing resources

staff

Specialisttechnicalstaff

management

Supporte.g. sales

Examples of Project Constraints4

Page 5: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Project planning is the art of scheduling/constraint

solving the project parameters, along various

dimensions:

time, money, staff …

in order to optimise:• project risk [low] (see later)• profit [high]• customer satisfaction [high]• worker satisfaction [high]• long/short-term company goals

5

Page 6: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Questions:

1. What are project parameters?

2. Are there good patterns of organisation

that we could copy?

6

Page 7: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Project parameters describe the whole project,

but we must at least describe:• resources needed

(people, money, equipment, etc)• dependency & timing of work

(flow graph, work packages)• rate of delivery (reports, code, etc)

It is impossible to measure rate of progress

except with reference to a plan.

7

Page 8: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

In addition to project members, the following

may need access to parts of the project plan:

• Management• Customers• Subcontractors (outsourcing)• Suppliers (e.g. licenses, strategic partners)• Investors (long term investment)• Banks (short term cash)

8

Page 9: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.2. Project Visibility

Unlike other engineers

(e.g. civil, electronic, chemical … etc.)

software engineers do not produce anything

physical.

It is inherently difficult to monitor an SE

project due to lack of visibility.

9

Page 10: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

This means that SE projects must produce

additional deliverables (artifacts)

which are visible, such as:• Design documents/ prototypes• Reports• Project/status meetings• Client surveys (e.g. satisfaction level)

10

Page 11: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.3. What is a Software Process Model?

Definition.

A (software/system) process model is a

description of the sequence of activities

carried out in an SE project, and the relative

order of these activities.

11

Page 12: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

It provides a fixed generic framework that

can be tailored to a specific project.

Project specific parameters will include:• Size, (person-years)• Budget,• Duration.

project plan

= process model + project parameters

12

Page 13: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

There are hundreds of different process modelsto choose from, e.g:• waterfall,• code-and-fix• spiral• rapid prototyping• unified process (UP)• agile methods, extreme programming (XP)• Scrum• COTS …

Most are minor variations on a smallnumber of basic models.

13

Page 14: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

By changing the process model, we can

improve and/or tradeoff:

• Development speed (time to market)• Product quality• Project visibility• Administrative overhead• Risk exposure• Customer relations, etc, etc.

14

Page 15: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Normally, a process model covers the entirelifetime of a product.

From birth of a commercial ideato final de-installation of last release

i.e. The three main phases:• design,• build,• maintain. (50% of IT activity goes here!)

15

Page 16: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

We can sometimes combine process models e.g.

1. waterfall inside evolutionary – onboard shuttle software

2. Evolutionary inside waterfall – e.g. GUI prototyping

3. SCRUM inside waterfall

We can also evolve the process model together with

the product to account for product maturity,

e.g. rapid prototyping waterfall

16

Page 17: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.4. Waterfall Model

• The waterfall model is the classic process

model – it is widely known, understood and used.• In some respect, waterfall is the ”common

sense” approach.• R.W. Royce, Managing the Development of Large

Software Systems: Concepts and Techniques, Proc. IEEE Westcon, IEEE Press, 1970.

17

Page 18: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

User Requirements

Software Requirements

Architecture Design

Detailed design & Coding

Testing

Delivery

The WaterfallWorkflow

Time

User Requirements Document

Software Requirements Document

Architectural DesignDocument

DetailedDesign & Code

phaseoutput

”Swimmingupstream”

18

Page 19: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. Easy to understand and implement.

2. Widely used and known (in theory!)

3. Fits other engineering process models: civil, mech etc.

4. Reinforces good habits: define-before- design, design-before-code

4. Identifies deliverables and milestones

5. Document driven: People leave, documents don’t Published documentation standards: URD, SRD, … etc. , e.g. ESA PSS-05.

6. Works well on large/mature products and weak teams.

19

Page 20: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages

1. Doesn’t reflect iterative nature of exploratory development.

2. Sometimes unrealistic to expect accurate requirements early in a project

3. Software is delivered late, delays discovery of serious errors.

4. No inherent risk management

5. Difficult and expensive to change decisions, ”swimming upstream”.

6. Significant administrative overhead, costly for small teams and projects.

20

Page 21: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.5. Code-and-Fix

This model starts with an informal general

product idea and just develops code until a

product is ”ready” (or money or time runs

out). Work is in random order.

Corresponds with no plan! (Hacking!)

21

Page 22: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. No administrative overhead

2. Signs of progress (code) early.

3. Low expertise, anyone can use it!

4. Useful for small “proof of concept” projects, e.g. as part of risk reduction.

22

Page 23: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages

1. Dangerous! 1. No visibility/control

2. No resource planning

3. No deadlines

4. Mistakes hard to detect/correct

2. Impossible for large projects,

communication breakdown, chaos.

23

Page 24: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.6. Evolutionary Development Types

Type 1: Exploratory Development: customer assisted development that evolves a product from ignorance to insight, starting from core, well understood components (e.g. GUI?)

Type 2: Throwaway Prototyping: customer assisted development that evolves requirements from ignorance to insight by means of lightweight disposable prototypes.

24

Page 25: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.7. Type 1: Spiral Model

Extends waterfall model by adding iteration to explore

/manage risk

Project risk is a moving target. Natural to progress a project

cyclically in four step phases

1. Consider alternative scenarios, constraints

2. Identify and resolve risks

3. Execute the phase

4. Plan next phase: e.g. user req, software req, architecture … then goto 1

25

Page 26: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

In 1988 Boehm developed the spiral model as

an iterative model which includes risk

analysis and risk management.

Key idea: on each iteration identify and solve

the sub-problems with the highest risk.

26

Page 27: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Cumulative cost Evaluate alternatives,Identify & resolve risks

Develop & verify next-level product

Plan next phase

Determine objectives,alternatives & constraints

Review & commitment

Prototypes

Phase1 Phase2 Phase3Operational PrototypeStart

End

Requirements plan

Development plan

Integration & Test plan

Requirements validation

Design, Validation & Verification

Detailed design

Coding

Unit & IntegrationTesting

Acceptance Testing

Concept Of Operation

C.f. Sommerville Figure 4.5

27

Page 28: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. Realism: the model accurately reflects the iterative nature of software development on projects with unclear requirements

2. Flexible: incoporates the advantages of the waterfall and evolutionary methods

3. Comprehensive model decreases risk

4. Good project visibility.

28

Page 29: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages

1. Needs technical expertise in risk analysis and risk management to work well.

2. Model is poorly understood by non-technical management, hence not so widely used

3. Complicated model, needs competent professional management. High administrative overhead.

29

Page 30: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.8. Type 2: Rapid Prototyping

Key idea: Customers are non-technical and

usually don’t know what they want.

Rapid prototyping emphasises requirements

analysis and validation, also called:• customer oriented development,• evolutionary prototyping

30

Page 31: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Requirements Capture

Quick Design

Build Prototype

Customer Evaluation ofPrototype

Engineer Final Product

Rapid Prototype Workflow

Iterate

31

Page 32: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. Reduces risk of incorrect user requirements

2. Good where requirements are changing/uncommitted

3. Regular visible progress aids management

4. Supports early product marketing

32

Page 33: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages I

1. An unstable/badly implemented prototype often becomes the final product. (Migration to a type 1 process!)

2. Requires extensive customer collaboration– Costs customers time/money– Needs committed customers– Difficult to finish if customer withdraws– May be too customer specific, no broad

market 33

Page 34: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages II

3. Difficult to know how long project will last

4. Easy to fall back into code-and-fix without proper requirements analysis, design, customer evaluation and feedback.

34

Page 35: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.9. Type 1:Agile Software Processes

Need for an adaptive process model suited to changes in:• User requirements• Customer business models• Technology• In-house environment

De-emphasise documentation, esp. URD!

Emphasise change management e.g. reverse engineering

design!

Examples include XP, SCRUM, Agile modeling etc35

Page 36: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.9.1. Agile Principles (C.f Sommerville Fig 17.3)

• Incremental delivery of software• Continuous collaboration with customer• Embrace change• Value participants and their interaction• Simplicity in code,

36

Page 37: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.9.2. XP Release Cycle

Select releasestories

Evaluate system

Breakdownstories totasks

Plan release

Develop/Integrate/Test code

Release code

For a sample story see Sommerville Figure 17.6Same as use-case? 37

Page 38: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.9.3. XP Practices (Summary)

1. Incremental planning

2. Small releases

3. Simple design

4. Programming in pairs (egoless programming, see 7.)

5. Test-driven development

6. Software refactoring (needs UML?)

7. Collective ownership: metaphors, standards, code

8. Continuous integration

9. Sustainable pace (No overtime!)

10. On-site customer! 38

Page 39: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. Lightweight methods suit small-medium size projects

2. Produces good team cohesion

3. Emphasises final product

4. Iterative

5. Test-based approach to requirements and quality assurance

39

Page 40: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages

1. Difficult to scale up to large projects where documentation is essential

2. Needs experience and skill if not to degenerate into code-and-fix

3. Programming pairs is costly (but see productivity literature)

4. Test case construction is a difficult and specialised skill.

40

Page 41: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.10. SCRUMSchwaber and Beedle 2002 (1986?)

• Short iterations – “sprints”• “Potentially deliverable product

increment” (working and tested)• Project kick-off meeting – brainstorm first

version• Produces first product backlog – vision in

terms of business requirements• Current understanding – not final contract

41

Page 42: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Product Backlog

• High level document• Items grouped into releases with planned release

dates• After each sprint, product owner has 3 options

– Turn sprint result into product increment– Declare project finished and release– Shift items between releases or change release

dates

42

Page 43: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

“Monthly” cycle: Sprint

• Starts with sprint planning meeting: select items from product backlog for sprint backlog (2 backlogs!)

• Determine tasks and estimate effort of sprint backlog• Short, typically 2-4 weeks• At end of sprint:

– Review progress – Define scope of next sprint– Add unfinished work to backlog

43

Page 44: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Project Roles (pigs!)

• Product owner (aka client): responsible for requirements, creates and prioritises backlog

• Scrum master: sets up and enforces project rules and practices. Manages daily meetings, progress, obstacles. Interface between team and product owner.

• Scrum team: develops increments. Cross functional, no job roles!

44

Page 45: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Project Roles (chickens)

• Stakeholders (customers, vendors) People who enable the project and for whom project will produce the benefits.

• Managers People who set up environment

for the product development organizations

45

Page 46: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Daily Cycle• Daily scrum meeting – (also a scrum of scrums)

– 15 min timeboxed, same time and place– Individual status report (yesterday’s and today’s work)– Anyone attends, but only pigs speak– New obstacles– New action for the day

Update burn down chart which plots cumulative

remaining sprint effort as a function of time. Each

backlog item has an effort estimate that must be

updated, based on new information.

46

Page 47: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

47

:Problem Statement

:Product Backlog

:Sprint Backlog

:Obstacles:Action Items

:Product Increment

:Product Release

Kick off project

Plan Sprint

Daily Scrum

Do WorkRemove Obstacle

Review Sprint

Deliver Release

Scrum Team Scrum Master Product Owner Client

DailyCycle

MonthlyCycle

Page 48: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

(Dis) Advantages

• Advantages– handles changing requirements– easy to learn and use– regular working deliverables– can be used for maintenance– open to risk management

• Disadvantages– Hard to predict– what documentation besides user requirements?– unrealistic to expect all do everything– not suitable for large projects (daily scrum?)– Not actually IT specific

48

Page 49: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.11. Rational Unified Process (RUP)

• Hybrid model inspired by UML and Unified Software Development Process.

• A generic component-based process?• Three views on the process

– Dynamic view: RUP phases– Static view: RUP activities– Practise view: RUP best-practise

49

Page 50: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Details

• Lifetime of a software product in cycles:• Birth, childhood, adulthood, old-age,

death.• Identify product maturity stages• Each project iteration cycle is a phase,

culiminating in a new release (c.f. Spiral model)

50

Page 51: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Inception Elaboration

ConstructionTransition

UP process – RUP phase workflow(drawn as a UML Statechart!)

51

Page 52: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

RUP PhasesPhases are goal directed and yield deliverables:• Inception – Establish the business case. Identify

external entities (actors, systems). Estimate ROI.• Elaboration – Understand problem domain.

Establish architecture, and consider design tradeoffs. Identify project risks. Estimate and schedule project. Decide on build vs. buy.

• Construction – Design, program and test. Components are bought and integrated.

• Transition – release a mature version and deploy in real world.

52

Page 53: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

RUP Workflows

• RUP separates what and when into two orthogonal process views.

• When modeled by phases• What modeled by workflows (c.f. Sommerville

Figure 4.13)• Any workflows can be active in any phases.• Anything that instantiates the following diagram is

an instance of RUP!!• An agile instantiation exists (Larman 2002)

53

Page 54: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Unified Process:SoftwareProcess

Cycle

Phase

Iteration

Artifact

Workflow

ProjectManagement

Environment

Requirements

Analysis/Design

Implementation

Testing

Deployment

*

*

Inception

Elaboration

Construction

Transition

*

*

4

Product

releases

BusinessModeling

54

Page 55: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

RUP Practise View

1. Develop software iteratively

2. Manage requirements

3. Use component-based architectures

4. Visually model software

5. Verify software quality

6. Control software changes

55

Page 56: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Use Case Model

Analysis Model

Design Model

Deployment Model

Implementation Model

Test Model

specified byrealised by

deployed by implemented by

verified by

Visual software model =UML Model-based Development

UML class diagram!

56

Page 57: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

(Dis) Advantages

• Difficult to judge without knowing the actual chosen instantiation of the RUP

• Unique use of the UML philosophy of SE.

• Can be as good/better than any other process

• Also as bad/worse than …

57

Page 58: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

1.12. COTS

• COTS = Commercial Off-The-Shelf software

• Integrate a solution from existing commercial software components using minimal software plumbing

• All projects seek some software re-use – Holy Grail of SE

• See also Sommerville Chapter 19.

58

Page 59: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Possible Approaches

1. Third-party vendors: component libraries, Java beans, 2. Integration solutions: CORBA, MS COM+, Enterprise

Java Beans, software frameworks …3. Good software engineering: application generators

(Yacc, Lex … Sommerville 18.3), generic programming (types, polymorphism etc)

4. Commercial finished packages: databases, spread sheets, word processors, web browsers, etc.

5. Design to open source interfaces: e.g. XML, ISO standards, etc.

59

Page 60: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Distributed COTS:Web Service Providers

• Integration of web-services: third party service providers using (XML-based?) service models:

• JINI – extension of Java for service discovery• SOAP (Simple Object Access Protocol)• WSDL (Web Services Description Language)• UDDI (Universal Description, Discovery and

Integration) • ”Cloud computing”

60

Page 61: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Advantages

1. Fast, cheap solution2. Explore solutions with existing products

(c.f. your project work!)3. May give all the basic functionality4. Well defined integration project, easy to

run.5. Open to outsourcing (c.f. Point 4)6. Build strategic supplier partnerships

61

Page 62: 1. Software Process Models (Sommerville Chapters 4, 17, 19, 12.4) A software process model is a standardised format for planning organising, and running.

Disadvantages

1. Limited functionality/ compromise/ requirements drift.

2. Component identification can be tricky – mistakes occur!

3. Licensing problems: freeware, shareware, etc.4. Customer lock-in: license fees, maintainance

fees, upgrades …5. Compatibility issues/loss of control:

1. Between components (doesn’t start!)2. During maintenance (suddenly stops!)

62