Top Banner
1 Screen Shots
21

1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Mar 29, 2015

Download

Documents

Trista Bise
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

1

Screen Shots

Page 2: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

BOM Details

Lot Sizing Constraints

Alternate Items

Produced Item

Consumed Item

Routing Used

Consumption Ratio

Page 3: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Operation Details

Alternate and Additional Resource

List of Operation-Resource for

Selected Route

Production Rate

Page 4: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Calendar

Individual Resource Calendar

Working Shift, Over Time, Non

Working Shift

Page 5: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Workflow

Running Production

Plan

Page 6: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Sales Order Plan

Explosion of BOM Considering both

Material and Capacity Constraints

Material Plan

Page 7: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Capacity Plan

Capacity Plan in Minutes at Operation-

Resource Level

Page 8: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Operation Plan

Allocation Details for

Work Order

Operation Plan for Selected Work Order

Page 9: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Procurement Plan

Generated Purchase Orders

Proposed Sourcing Dates based on Production Plan

Page 10: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Resource Load

Used Capacity by Available

Capacity

List of Resources

Page 11: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Individual Resource Load

Capacity Attributes

Load Graph with automatically balanced

load

Page 12: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Critical Resource

Load Between Two Dates

Page 13: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Inventory Report

Ending on Hand at Different

DatesList of Items

Page 14: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Item Status

Item Status Between Two

Dates

Page 15: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Problem Summary - Sales Order Late

List of sales orders where Planned End Time is greater than due date

and thereby late

Page 16: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Problem Summary – Shortage Report with Available Vs Required Date

List of material where available date is greater than required date and

shortage quantity

Page 17: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Automated SchedulingAutomated Scheduling

Automatically schedule all jobs

for selected resource

Automatically schedule or un-

schedule a selected job

Schedule all jobs for all resource either based on just-in-time or resource utilization strategy for

given scheduling horizon

Page 18: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Interactive SchedulerInteractive Scheduler

Resource List

Jobs list for the selected

resource

Non working time

Schedule jobs

Information on selected job in

Gantt chart

Zoom optionMove timeline

Page 19: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Manual SchedulingManual Scheduling

Action on individual

scheduled job

Moving job through drag and drop or can be

drawn on Gantt window

While moving job, if there is violation, provides an alert

Page 20: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Upstream and Downstream LinksUpstream and Downstream Links

Show upstream and downstream links for selected customer order or

job order

Page 21: 1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

21

Thank You