Top Banner
1 Progress for July 17, 2011 plenty of snow on the Mt. It is crusty this mornin
6

1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

Jan 14, 2016

Download

Documents

Caren Bennett
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

1

Progress for July 17, 2011

Still plenty of snow on the Mt. It is crusty this morning

Page 2: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

2

Progress for July 17, 2011

Herman and Tom continue to investigate computer communication problems. They have contacted Jim Hughes.

Page 3: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

3

Progress for July 17, 2011

Andy attaches a connector to the RTD cables from the Dewar.

Page 4: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

4

Progress for July 17, 2011

• Concern about Pressurized Air System Dryer – Yesterday we viewed the instrument pressurized air

system, which supplies the mirror supports, flip-ring clamps, and Mosaic filter-changer. This has an in-line Wilkerson Dryer WRD100A-2. R22 is the refrigerant.

– http://www.womackmachine.com/pdf/rb365/47th/Section5/Sec5pg246WilkersonRefrigeratedDryer.pdf is a link to a description of this model. It notes that the dryer cools the air to dewpoint 35F and can handle under normal conditions, 100 SCFM.

– The concern is that if this is the system that supplies air to the barrel, because the C5 is -5C (23F), colder than 35F, we’ll accumulate ice on its face.

Alistair assures us “This

isn’t the instrument air

that you are looking for.”

Page 5: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

5

Next Steps & Plan

• The road is still closed. There is a lot of melting snow and it is very slippery in a few spots. We plan to stay on Tololo tonight (Sunday) through Thursday.

• Pressure test 1st thing Monday after review of JHA and other docs.

• Need to unplug/disconnect the Relay Rack before the final support post is welded under the Tank.

• Cool down still looking good for Wed. or maybe even Tues. Herman Cease is finishing off the documentation for the pressure test and cooldown.

• We plan for come down to La Serena on Thursday. Herman, Andy, and Rolando leave on Friday

Page 6: 1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.

6

July 17, 2011

Working on the Tank

Helium lines run down to secret staircase.