1
Dec 21, 2015
1
Process Automation Integration
Utilizing ABB’s 800xA and OPC
3
ERP / EAM
Automation equipment / Production
Customer - Supplier
Internet
AIP
The Integrated Plant System
Scheduling Plantstatus
Inventory
Customerorder
Rescheduling
Maintenance
B2B / B2E Delivery
Purchaseorder
Confirmation
Materialrefill
Productiondata
Analysis andOptimization
Alarm orIncident
4
Asset OptimizationProcess Portal
Object Info
OEE
Aspect Integrator Platform / 800xA
Fault Report
Active WO
AIP/800xA as an Integration Platform
Aspect System
Aspect System
IFS Maintenance Aspect System
5
Asset Cost Reduction
Electrical diagram
Equipment data sheet
P&I Diagram
Active work orders Business performance
Work order history
Equipment cost analysis
OEE
Information Availability
Seamless navigation between different information systems
6
Object Synchronization
To achieve Asset Cost Reduction, it is vital that the various systems that contains assets can be synchronized – both in batch and online.
V-101
AIP/800xA
Database
IFS
Biz
AP
Is
LU
LU
LU
Object with a functional object aspect is created
Object is created and inserted in Equipment functional structure
7
Condition-based Maintenance
Calendar-based PM could be compared to a man that visits his doctor once a month and asks him to open up his stomach to see if everything looks good. With the risk of forgetting his scalpel or infecting the wound before stitching the stomach together again, the doctor usually says it looks alright. The goal should be to let the factory – as well as men – ask for maintenance when it is needed.
8
Condition-based Maintenance
Monitoring
Detection
Alarms / EventsIFS WO/ PM module
Direct input
Fault Report Wizard
PM Event
PM / WO Event
Operator input
Predictive maintenance
Parameters
Operational hours, etc.
PDAevent
Collecting
data from
field devices
Asset
Monitors
Seamless access to the maintenance system from the operators environment
Automation equipment triggers maintenance actions based on real time information
9
Overall Equipment Efficiency
It’s all about how to increase profit through cost reduction activities as well as real performance enhancements!
Maximum performanceLost profit
Real performance (OEE)
Maintenance, Engineering and Procurement costs
Time
$
10
Available operating time
Planned production time
Total available time
A
P
QNet operating time
Planned stop time
Unplanned stop time
Reduced speed
Quality losses
Planned stop time
How is production capacity used?
Value adding
operating time
11
Overall Equipment Efficiency– Without automation integration
OEE index = Availability x Performance x Yield
OEEDatabase
Availability
Performance
Yield (Quality rate)
Manual registration- If remembered!
An event occurs:- Start/Stop - Speed change - Quality loss
Manual OEE Data acquisition leads to poor quality of the OEE index!
12
Overall Equipment Efficiency– With automation integration
Real-time data acquisition of OEE events by utilizing OPC
Monitoring
Start / Stop - events
Operator adds data and submits registration
Speed change - events
Quality losses
OEEWeb
portlet
OEEDatabase
Availability
Performance
Yield (Quality rate)
Collecting OEE data
from processequipment
13
DemoIntegrated Plant System
Level 1: Connectivity
Asset Information –Demands, Spare parts, Inventory
15
16
17
Work Order Planning
19
20
Document Management
22
23
24
Fault Reporting
26
27
28
29
30
Read More?
31