Top Banner
1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited
82

1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

Dec 18, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

1

Presentation on

Jaipur Terminal Fire of 29.10.2009

BySK Roy, GM(HSE),CO

Indian Oil Corporation Limited

Page 2: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

2

Flixborough (1974)

Explosion/

Fire

28 Fatalities,

36 Injuries

Plant virtually

demolished

Page 3: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

3

Pasadena October 1989

Explosion/

Fire23 Fatalities,

132 Injuries

Page 4: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

4

Esso Longford25th September 1998

Explosion/

Fire

2 Fatalities, 8 Injured,

Fire continued

for 2 ½ days

Page 5: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

5

Toulouse 21st September 2001

Explosion/

Fire

31 Fatalities,

2442 injuries

Created 50 m dia

crater more than

10 metre deep

Page 6: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

6

BP Texas City Refinery23rd March 2005

Explosion/

Fire

15 fatalities,

over 170 injured

Page 7: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

7

Buncefield Depot11th December 2005

Before After

Page 8: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

8

Jaipur Terminal Fire, India29th October 2009

11 fatalities,

Terminal Closed

Fire Continued for 11 days

Page 9: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

9

Safety at Jaipur Terminal

Page 10: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

10

Fire Scene at Jaipur Terminal

Page 11: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

11

Fire on Diesel Tanks

Page 12: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

12

Fire on Kerosene Tanks

Page 13: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

13

Scenes of Fire

Page 14: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

14

Scenes of Fire

Page 15: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

15

Kerosene tank & MS tanks(Behind)

Page 16: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

16

Scene of Fire

Page 17: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

17

View of all 11 tanks

Page 18: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

18

Fire on Three MS Tanks

Page 19: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

19

Fire on Three MS Tanks

Page 20: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

20

Kerosene tanks

Page 21: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

21

MS Tank collapsed

Page 22: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

22

HSD Tanks on 2rd day

Page 23: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

23

Over pressurised Lube oil Drums near tanks in Fire Many Exploded

Page 24: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

24

Near by population on Run

Page 25: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

25

Demolished Emergency Response Centre near Gate

Page 26: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

26

Control Room & Maint. Building

Page 27: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

27

Collapsed car shed in the terminal

Page 28: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

28

Terminal Office Building

Page 29: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

29

Fire water Pump House

Page 30: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

30

Demolished Smoking Booth near Boundary Wall

Page 31: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

31

Extent of Damage

Page 32: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

32

Tank Truck Loading Gantry

Page 33: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

33

Terminal Pumping Station

Page 34: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

34

KBPL Pumping Station

Page 35: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

35

Ruptured pipelines

Page 36: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

36

Maintenance Building near gate

Page 37: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

37

Damage to Vehicles

Page 38: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

38

Business Continuity Centre

Page 39: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

39

Overturned Fire Monitor.

Page 40: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

40

Damage at nearby car Showroom

Page 41: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

41

Damage at nearby car Showroom

Page 42: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

42

Pictorial Depiction of the Incident

Page 43: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

43

SECURITY GATE

EMERGENCY GATEKEROSENE TANKS

MS TANKS

HSD TANKS

LUBE WAREHOUSE

TTL

PH

MS TANKS

S/S DG

ADMIN

C/RBCCSECURITY

GATE

GENUSFWPH

FW TANKS

PIPELINE INSTALLATION

EXCHANGE PIT

STORE CANTEEN

Plot Plan

C/R

NTS

KBPL P/H

Page 44: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

44

PLT Line up

DISCHARGE LINE

INLET LINE

TANK DYKEOMC

DRAIN VALVE

TANK 401A

FROM PIPELINE DIVISION

DIP: 11.86 M

NTS

Page 45: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

45

TRANSFER PUMP -1

MS TANK 401A

Schematic Layout

Standard Operating Sequence Likely Sequence

1. Ensure MOV and HOV are closed

2. Reverse the position of Hammer Blind Valve

3. Open the HOV

4.Open MOV (initially inching operation to establish no leakage from Hammer Blind Valve body)

1. MOV opened first.

2. Hammer Blind Valve opened

3. Leakage started.

MOV

HAMMER BLIND VALVE

HOV

11.86 M

NTS

Page 46: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

46

Schematic of Valves on Tank Discharge Line

PLATFORM

MS Tank

Tank wall40 cm

80 cm

160 cm 310 cm 205 cm

10” 90cm

90 cm

12”

160 cm

HOVHOVPLT/TLF P/L

Hammer Blind

MOV MOV

A

A

Hammer Blind

N

NTS

Page 47: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

47

Source of MS Leak

Page 48: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

48

MOV on Discharge Line

Page 49: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

49

Hammer Blind and HOV on Discharge Line

Page 50: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

50

Source of MS Leak

Page 51: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

51

Explosion occurred to the tune of approximately 20 Tons of TNT.

Nine of the total 11 tanks caught fire immediately after first explosion. Balance two tanks(at a distance) caught fire after some time.

Decision was taken to allow the fuel(60,000 KL) to burn as all fixed fire fighting facilities at the location got demolished.

Vapour Cloud Explosion (VCE)

Page 52: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

52

Building in the immediate neibourhood of the terminal were heavily damaged.

Minor damages & window pane breakage occurred upto 2 KM distance from the facility.

Total loss due to fire & explosion including loss of product, stores, fixed assets, compensation for third party losses were approximately $ 60 million.

Vapour Cloud Explosion (VCE)

Page 53: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

53

The Incident – Major Timelines

S. No. Activity Time

(Hours)

1. Sealing of tank lines, valves etc. for PLT Before 1750

2. Tank handing over by Pipelines to Marketing 1750

3. Start of hammer blind reversal work After 1750

4. Start of MS spillage 1810

5. Rescue of Operation Officer 1820-1824

6. First communication outside the terminal 1824

7. Sounding of siren After 1830

8. Formation of vapour cloud across the terminal 1810-1930

9. Vapour Cloud Explosion 1930

Page 54: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

54

The Incident – Possible Scenarios

Scenario-I

MOV was in open condition before the start of hammer

blind reversal job

Opened by someone anytime between the previous blinding

operation and 29.10.2009.

Not possible to establish any one of the above conclusively

Page 55: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

55

The Incident – Possible Scenarios

Scenario-II MOV opened accidentally when the blind was being

reversed (due to spurious signal or manually).

Amongst the two Scenarios, Scenarios-I, that the MOV was in open condition before the start of the hammer blind reversal job, appear to be more likely.

Page 56: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

56

Source of Ignition

As Vapour Cloud spread in such a large area , the

source of fire can be anything inside or outside the

installation.

The Non flame proof electrical fittings in

administration block located in the south western

direction of the terminal or Spark during starting of the

vehicle at the installation are probable cause of source

of fire.

Page 57: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

57

The Incident – Contributing Factors

Non-availability of one of the shift workman, who was

supposed to be on duty.

Control room remaining unmanned due to above.

Absence of specific written-down procedures for the

works to be undertaken and, therefore, reliance on

practices.

Page 58: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

58

The Incident – Contributing Factors

Opening of the HOV before completion of hammer

blind reversal operation.

Not checking the MOV for its open/close status and

not locking it in Closed position.

Not using proper protective equipment while

attempting rescue work.

Page 59: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

59

The Incident – Contributing Factors

Initiation of the critical activity after normal working

hours, leading to delay in response to the situation.

Non-availability of second alternate emergency exit.

Proximity of industries, institutes, residential

complexes etc. close to the boundary wall.

Page 60: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

60

Accident Investigation

Ministry of Petroleum & Natural Gas, Govt. of India

constituted an independent seven member committee headed

by Sh. MB Lal , Ex. Chairman, HPCL to enquire into the

Incident.

MB Lal committee submitted their report on 29.01.2009 &

made following observation:

“The Jaipur incident was first of its kind in India & the third

one reported globally.”

Page 61: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

61

Accident Investigation

MB Lal committee made following conclusions on cause:

The Loss of containment in terms of time & quantity was never

considered a credible event and accordingly not taken into hazard

identification.

Basic operating procedures for hammer blind opening was not

followed.

Accident could have been managed if safety measures provided in

control room were not made defunct.

Backup for emergency shutdown from Control room not

available.

There was delay in emergency response for long period.

Page 62: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

62

Accident Recommendations

MB Lal committee made 118 recommendation to be

implemented at Oil installations.

MoP&NG constituted a Joint Implementation Committee

(JIC) comprising of :

a) Head of Corporate HSE of IOCL,BPCL & HPCL.

b) ED(O),IOCL; ED(O&D),HPCL & ED(logistics),BPCL

b) Director (M), OISD

ED(HSE),IOCL was made convener of the JIC.

Page 63: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

63

Accident Recommendations

JIC segregated 118 recommendations into various categories for ease of implementation viz :

- Engineering related

- Operation related

- Procurement related

- Training related

- Policy related

- OISD related

- Ministry related

Page 64: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

64

Recommendations- Engineering Related

Only a closed system design should be adopted.

All Hammer Blind valves should be replaced with

Pressure Balancing type Plug Valves / Ball Valves.

The first body valve on the tank should be Remote

Operated Shut Off Valve (ROSOV) on the tank

nozzle inside the dyke with Remote Operation

from outside the dyke as well as from the control

room. ROSOV should be fail safe and fire safe.

Page 65: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

65

Recommendations- Engineering Related

Adequate lighting should be provided in

operating areas. Minimum Lighting lux level

should be as:Tank farm area/Roads – 20 Main operating area/pipe racks - 60Pump house/sheds/switches – 100

For floating roof tanks, roof drain to be of

more robust design to prevent oil coming out

when roof drain is open for water draining

operation.

Page 66: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

66

Piping design inside tank dyke area should

ensure easy accessibility for any operations

inside dyke in the tank farm.

Tank Dyke Valves should be provided with

position indicator (open or close) in control

room and necessary hardware and

instrumentation should be provided for this.

Recommendations- Engineering Related

Page 67: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

67

Wherever Pipeline transfers take place, Mass

Flow Meter with Integrator should be

provided on delivery pipelines.

The Tank Farm Management system(TFMS)

should be upgraded and integrated with SAP

and provision for recording of all critical

events in SAP as well as TFMS (such as

critical valves position, start/stop of pumps,

levels in tanks, alarms etc).

Recommendations- Engineering Related

Page 68: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

68

High level alarm from the radar gauge and

high level alarm from a separate tap off

should be provided.

Buildings not related to terminal operation

including canteen should be located outside

the plant area.

Recommendations- Engineering Related

Page 69: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

69

Locate buildings and structures in the upwind

direction (for the majority of the year) as far

as practicable.

Control Room, Fire water tank and fire water

pump house should be located far away from

potential leak sources/tankage area.

Recommendations- Engineering Related

Page 70: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

70

Automation of Tankfarms and terminals with

sophisticated systems both in hardware and

software.

The emergency exit gate should be away from

the main gate and always be available for use

for personnel evacuation during emergency.

Recommendations- Engineering Related

Page 71: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

71

Site specific, Standard Operating Procedures

(SOPs) should be prepared which not only

give what the procedures are, but also why

they are needed.

The critical operating steps should be

displayed on the board near the location

where applicable.

Recommendations- Operation Related

Page 72: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

72

Management of change procedure should be

immediately implemented.

Mock drill whenever conducted should include

the full shutdown system activation also.

Recommendations- Operation Related

Page 73: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

73

Emergency procedures should be written and

available to all personnel in the installation

outlining the actions to be taken by each

during a major incident.

Carry out HAZOP Study and Quantitative Risk

Assessment (QRA) on large sized installations

through well qualified agency .

Recommendations- Operation Related

Page 74: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

74

All personnel working at the terminal should

be given simulated live fire fighting training

through reputed training institutes.

Shift manning should always be maintained

Recommendations- Operation Related

Page 75: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

75

Remote operated long range foam monitors (1000 GPM and above) to fight tank fires shall be provided which should be of variable flow.

The Rim Seal fire detection and protection system shall be installed in all Class ‘A’ products in the terminal.

Medium expansion foam generators shall be provided to arrest vapour cloud formation from spilled volatile hydrocarbons.

Recommendations- Fire Protection Related

Page 76: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

76

The fire water requirement for terminals shall be based on two fire contingencies simultaneously as is the case in Refineries.

An emergency kit consisting of safety items viz. fire suites, various leak plugging gadgets, oil dispersants and oil adsorbents, lifting jacks (for rescue of trapped workers), high intensity intrinsically safe search lights for hazardous area, etc. and should be readily available at the terminals.

Recommendations- Fire Protection Related

Page 77: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

77

Wherever there is a cluster of terminals of different companies, an emergency response centre equipped with advanced firefighting equipment viz. fire tenders and trained manpower shall be considered on cost sharing basis .

Recommendations- Fire Protection Related

Page 78: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

78

CCTV’s should be installed covering tank farm areas and other critical areas. The CCTV should be provided with an alarm to provide warning in case of deviation from any normal situation.

Hydrocarbon (HC) detectors should be installed near all potential leak sources of class ‘A’ petroleum products e.g. tank dykes, tank manifolds etc.

VHF(Wireless Hand sets) handsets should be provided to each of the operating crew.

Recommendations- Fire Prevention Related

Page 79: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

79

Corporate HSE department should be strengthened & should directly report to CEO.

Performance evaluation of Company employees should have Minimum 20% weight-age towards safety.

Annual safety audits should be done by a qualified third party agency.

Recommendations- Policy Related

Page 80: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

80

Recommendations- Present status

Total Recommnendations : 113

Recommendations implemented : 33 (30%)

Pending Recommendations :

•Recommendation under review : 01 (01%)•Engineering related : 19 (17%)•Operations Related : 06 (05%) •Procurement related : 08(07%)•Training Related : 06(05%)•General/ Policy related : 24(21%)•OISD Related : 16(14%)

Page 81: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

81

Any Question ?

Page 82: 1 Presentation on Jaipur Terminal Fire of 29.10.2009 By SK Roy, GM(HSE),CO Indian Oil Corporation Limited.

82

Thank You