Top Banner
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfal l CSO Outfal l 16 th St 16 th St Irving St Irving St Piney Branch Stream Piney Branch CSO Controls Current and Proposed Plan for Rock Creek N Piney Branch Drainage Area N $60 M of Green Infrastructure in Piney Branch
9

1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

Dec 23, 2015

Download

Documents

Andrew Hodges
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

1

Piney Branch Drainage

AreaPiney Branch

Tunnel

Rock Creek

049

Piney Branch Stream

Rock Creek

Current Plan Proposed Plan

049

CSO Outfall

CSO Outfall

16th

St

16

th S

t

Irving St Irving StPiney Branch Stream

Piney Branch CSO Controls

Current and Proposed Plan for Rock Creek

N

Piney Branch Drainage

Area

N

$60 M of Green Infrastructure in

Piney Branch

Page 2: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

2

029 028

027026

025 024

022

020

Potomac Tunnel

I-66

021

Key

Br.

Lincoln Memori

al

Kennedy Center

029 028

027026

025024

022

021

020

Potomac Tunnel

I-66

Key

Br.

Lincoln Memori

al

Kennedy Center

Add 75 mgd to wet weather treatment system at Blue Plains

Current Plan Proposed Plan

Current and Proposed Plan for Potomac River

N N

$30 M of Green Infrastructure for CSO 027, 028, 029

$10 M to separate CSO 025, 026

Page 3: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

3

Clean Rivers Projectin Planning Stage Piney Branch Early Action

Green Infrastructure Project• Install Green infrastructure practices to

mitigate CSO overflow to Rock Creek• Design-Build delivery method• Draft RFQ to be developed July 2014• Estimated contract value: $3 million• Issue RFP end of 2014• Construction period: June 2015 – 2016

Page 4: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

4

DC Water’s Green Infrastructure Challenge Seven design award winners selected Award winners announced January

2014 RFQ/RFP for final design/construction

will be issued in Third Quarter of 2014 for construction

Construction of award winning projects will start in 2015

For more information, download the Green Infrastructure Challenge Briefing Document: www.dcwater.com/greenchallenge

Page 5: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

5

Green Infrastructure:

Potomac(Cumulative)

Rock Creek(Cumulative)

Spend $10 M by 2019 Spend $3 M by 2016

Spend $20 M by 2023 Spend $15 M by 2019

Spend $30 M by 2028 Spend $30 M by 2024

Spend $40 M by 2032 Spend $45 M by 2027

Spend $60 M by 2032

Total: $40 million Total: $60 million

Gray Infrastructure:

Place hybrid Potomac Tunnel in operation by 2030

Proposed Consent Decree Amendments and Schedule for Green Infrastructure

Page 6: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

6

Important Dates

Design ConstructionRFP NTP Completion

Design-Build

Nov 2015

2016 2022

23-foot diameter tunnel, 70 to 180 feet deep, 28,600 feet long

5 shafts and 5 diversion structures

Estimated construction value: $500 – $600 million

Delivery method: Design-Build on an accelerated schedule

NE Boundary Tunnel Alignment

Page 7: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

7

Construction Staging Areas

Typical Diversion Facility

Page 8: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

8

Construction Staging Areas

Mount Olivet Road (.73-acre staging area)

Page 9: 1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

9

Clean Rivers Program: • Northeast Boundary Tunnel – late 2015

procurement for Design-Build and construction management

• Green Infrastructure – start work mid-2015

Upcoming Design, Design-Build, and Construction Management