1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfal l CSO Outfal l 16 th St 16 th St Irving St Irving St Piney Branch Stream Piney Branch CSO Controls Current and Proposed Plan for Rock Creek N Piney Branch Drainage Area N $60 M of Green Infrastructure in Piney Branch
9
Embed
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Piney Branch Drainage
AreaPiney Branch
Tunnel
Rock Creek
049
Piney Branch Stream
Rock Creek
Current Plan Proposed Plan
049
CSO Outfall
CSO Outfall
16th
St
16
th S
t
Irving St Irving StPiney Branch Stream
Piney Branch CSO Controls
Current and Proposed Plan for Rock Creek
N
Piney Branch Drainage
Area
N
$60 M of Green Infrastructure in
Piney Branch
2
029 028
027026
025 024
022
020
Potomac Tunnel
I-66
021
Key
Br.
Lincoln Memori
al
Kennedy Center
029 028
027026
025024
022
021
020
Potomac Tunnel
I-66
Key
Br.
Lincoln Memori
al
Kennedy Center
Add 75 mgd to wet weather treatment system at Blue Plains
Current Plan Proposed Plan
Current and Proposed Plan for Potomac River
N N
$30 M of Green Infrastructure for CSO 027, 028, 029
$10 M to separate CSO 025, 026
3
Clean Rivers Projectin Planning Stage Piney Branch Early Action
Green Infrastructure Project• Install Green infrastructure practices to
mitigate CSO overflow to Rock Creek• Design-Build delivery method• Draft RFQ to be developed July 2014• Estimated contract value: $3 million• Issue RFP end of 2014• Construction period: June 2015 – 2016
4
DC Water’s Green Infrastructure Challenge Seven design award winners selected Award winners announced January
2014 RFQ/RFP for final design/construction
will be issued in Third Quarter of 2014 for construction
Construction of award winning projects will start in 2015
For more information, download the Green Infrastructure Challenge Briefing Document: www.dcwater.com/greenchallenge
5
Green Infrastructure:
Potomac(Cumulative)
Rock Creek(Cumulative)
Spend $10 M by 2019 Spend $3 M by 2016
Spend $20 M by 2023 Spend $15 M by 2019
Spend $30 M by 2028 Spend $30 M by 2024
Spend $40 M by 2032 Spend $45 M by 2027
Spend $60 M by 2032
Total: $40 million Total: $60 million
Gray Infrastructure:
Place hybrid Potomac Tunnel in operation by 2030
Proposed Consent Decree Amendments and Schedule for Green Infrastructure
6
Important Dates
Design ConstructionRFP NTP Completion
Design-Build
Nov 2015
2016 2022
23-foot diameter tunnel, 70 to 180 feet deep, 28,600 feet long
5 shafts and 5 diversion structures
Estimated construction value: $500 – $600 million
Delivery method: Design-Build on an accelerated schedule
NE Boundary Tunnel Alignment
7
Construction Staging Areas
Typical Diversion Facility
8
Construction Staging Areas
Mount Olivet Road (.73-acre staging area)
9
Clean Rivers Program: • Northeast Boundary Tunnel – late 2015
procurement for Design-Build and construction management
• Green Infrastructure – start work mid-2015
Upcoming Design, Design-Build, and Construction Management