1 Operations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal values Experts have found a bug in the DCC firmware which may be the origin of the CSC loss of efficiency at high readout rate CSC plans to implement the CMS- wide plan of action to recover from and mitigate SEUsThe plan for the LHC YETS has been developed.
11

1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

Jan 21, 2016

Download

Documents

Isabel Warren
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

1

OperationsOperations• CSC is stable running  since HI run has

started. • The low CSC occupancy in HI running

allows us to operate all HV channels at nominal values

• Experts have found a bug in the DCC firmware which may be the origin of the CSC loss of efficiency at high readout rate

• CSC plans to implement the CMS-wide plan of action to recover from and mitigate SEUsThe plan for the LHC YETS has been developed.

Page 2: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

2

Status of the CSC plan for the LHC winter shutdown

Status of the CSC plan for the LHC winter shutdown

M. Ignatenko (UCLA)CSC Operation and DPG meeting

CERNJanuary 11, 2012

Page 3: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

3

A source of bad vacuum at -18 m away from IP

A source of bad vacuum at -18 m away from IP

A good news: a source of the bad vacuum at -18 m away from interaction point has been found. The decision to replace a bad element has been taken.It will delay the LHC start for 1 week.

Radiation survey of the beam pipe area on minus side of the CMS

Page 4: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

4

Turbine replacement for X3J31 rack

Turbine replacement for X3J31 rack

The turbine in the X3J31 rack had a broken cable, which jeopardized reading temperature sensors.During the turbine replacement 4 optical cables and 1 TMB were damaged.

The damaged fibers and the TMB have been replaced.

Page 5: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

5

TMB 3.3 V fuses replacementTMB 3.3 V fuses replacement

• Silver plated 3.3 V fuses have been replaced by gold plated ones on 50 TMBs.

We didn’t replaced the fuses on TMBs which have 3.3 V readings bigger than 3.16 V and where the access is blocked by 2 layers of skew clear cables.

Page 6: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

6

Things to do before January 17Things to do before January 17

1. LV connectivity test for 9 CSCs. 2. Maratons and heat exchangers vacuum cleaning in UXC. 3. OPFCs and heat exchangers vacuum cleaning in USC. 4. Hardware preparation for the SYSTEC CAN-Bus controller test.

Page 7: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

7

ME4/2 post installationME4/2 post installation

The post installation for ME42 chambers is going on.

Take into account one week delay in the CMS schedule we can better reschedule all hardware jobs.

Page 8: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

8

Not urgent jobsNot urgent jobs

• Racks inspection and missing part installation (air reflectors, front panels etc…)

• Temperature sensors commissioning in UXC/USC.

Page 9: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

9

Shift-leader and central DCS shifter request

Shift-leader and central DCS shifter request

Available shift-leader shifts in January 2012

There is a good opportunity to download (refresh) firmware to the CFEB and DMB EPROMs on

January 21-22

Page 10: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

10

Available shift-leader shifts in February 2012

Available shift-leader shifts in February 2012

Page 11: 1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.

11

Available central DCS shiftsAvailable central DCS shifts

January 2012

All February central DCS shifts are taken.