1
Move Update
Timeline & Project Status
Resources and Guides Update
Transitioning to Full Service
Business Customer Gateway
Training & Communications
Scope of November Release
Issues
Acceptance and Verification
IMB Placement
MERLIN Changes
2
Move Update®
3
►November 2008, window for compliance reduced to 95 days
►November 2008, added Standard Mail
►Postal Service has fully deployed a system that accurately measures Move Update Quality
4
►Initially deferred implementation date from November 2008 to May 2009
►Further delayed implementation to January 2010
►Existing Move Update requirements remain in effect
5
►The USPS has been providing Move Update reports to Mailers
►Information leads to significant improvement in Move Update quality
►Three specific examples:
6
The USPS Collaboration with Mailers on Move Update has resulted in quality improvement
Mailer Quality Jan 18 – 31 Mar 1 – 18
Mailer 112.14 % 3.47 %
Mailer 236.67% 11.54%
Mailer 3
31.8% 0%
Quality Improvement
7Data Source: Jan – Mar 2009
Distribution of Error Rate
0
5,000
10,000
15,000
20,000
25,000
Error Rate
Num
ber
of M
ailin
gs
Error Rate
8
►The data clearly indicates this is not an Industry-wide problem:
– 55% of all mailings have 5% or less errors
– Nearly Two-Thirds are less than 10%
– 84% currently achieving threshold [30%]
9
Timeline/Project Status
10
10
JUN JUL AUG SEP OCT NOV DEC JAN FEB
CY 2008
Requirements
MAR APR MAY JUN JUL AUG SEP OCT NOV
CY 2009
FY 2009FY 2008 FY 2010
DEC
Design
Build 11/17 – 3/12
SIT 2/2 – 4/19, SASP, Confirm: 2/2 – 4/12
CAT 3/16 – 5/4 (SASP SIT/CAT overlap)
Prep 4/27 – 5/8
Cut Over 5/8 – 5/10
Prep
Prep
Price Chg
Full Service Project Schedule
Go Live 5/11
Change Control
5/4– Business Signoff / Acceptance
11/16/08 - P1! Release 18.0
01/19/09 - P1! Release 18.1
03/30/09 - P1! Release 19.0
05/10/09 - P1! Release 20.0
05/10/09 - Full Service Release 1
05/10/09 - Price Change
05/18/09 - Test Environment Mailers [TEM]
11/29/09 - Full Service Release 2
TEM 5/18
Rel 2
111111
Deliverable Plan Lines and Milestones Past Due77% complete vs. expected 79%
There are 10 milestones past due as of 4/17/09.Full-Service Milestones
0
50
100
150
200
250
300
350
400
450
500
Cumulative Plan Cumulative Complete
10 Past Due
Program Target % Complete: 79%Program Actual % Complete: 77%
Key Upcoming Milestones:
MID/CRID Data Migration and Cleansing Phase 1: 4/30
Hour-by-Hour Release 1 Deployment Schedule: 4/30
CAT Test Release 20 Complete: 4/30
Performance Test Execution Complete: 5/1
Release 1 Go-Live: 5/11
Milestones Overdue as of 04/17/2009
NameFinish Date Owner
New Target Notes
SASP - CERT Ready 4/17/2009 Rowland 4/24/2009 Host completion needed by 3/21 still pending.SASP- DR Ready 4/14/2009 Rowland 5/3/2009 Host completion still pending.
Confirm - Performance Test 4/17/2009 Laffey 4/24/2009Tech Refresh schedule affecting Confirm performance test schedule.
eAdmin - PROD Ready 4/14/2009 Rowland 4/24/2009eAdmin will need to submit CR for PROD and CAT Security Scans.
IMB - System Readiness - Post/Publish Release Note (Pre-Release), Release 20 4/13/2009 Siniscalchi 4/24/2009Completed and under review; expect to publish on 4/24.
IMB - Cust Interaction and Training - Deliverable #9 Mailer Perspective Overview Module 4/10/2009 Simone 5/1/2009 Making final updates.IMB - Cust Interaction and Training - Deliverable #10 Mailer Perspective Requirements Module (for mailer participation)4/10/2009 Simone 5/1/2009 Making final updates.IMB - Cust Interaction and Training - Deliverable #11 Mailer Perspective Bar Codes Module 4/10/2009 Simone 5/1/2009 Making final updates.
IMB - Cust Interaction and Training - Refresh all guides (IT/Accenture support) 4/15/2009 Simone 4/24/2009All Guides posted to RIBBS with the exception of CSA (expected 4/23).
MID- PROD Ready 4/14/2009 Rowland 4/20/2009App configuration delayed until after NCRB implementation, which is expected by 4/24.
12
Total ScriptsScripts Planned Scripts Executed Scripts Passed
1087
(100%)
1087
(100%)
1087
(100%)
1087
(100%)
0200400600800
100012001400160018002000
2-Mar
4-Mar
6-Mar
8-Mar
10-Mar
12-Mar
14-Mar
16-Mar
18-Mar
20-Mar
22-Mar
24-Mar
26-Mar
28-Mar
30-Mar
1-Apr
3-Apr
5-Apr
7-Apr
9-Apr
11-Apr
13-Apr
15-Apr
17-Apr
Num
ber o
f Scr
ipts
Full Service Overall Execution
Planned
Actual
Passed
Pass 1 Complete
Pass 2 Complete
Systems Integration Test [SIT] is complete
13
Total TestsTotal Tests Executed
Planned Tests (To Date)
Planned Tests Executed
6697 4773 5460 4773
71% 87%
CAT Execution Plan
0
1000
2000
3000
4000
5000
6000
7000
8000
30-M
ar
31-M
ar
1-Ap
r
2-Ap
r
3-Ap
r
4-Ap
r
5-Ap
r
6-Ap
r
7-Ap
r
8-Ap
r
9-Ap
r
10-A
pr
11-A
pr
12-A
pr
13-A
pr
14-A
pr
15-A
pr
16-A
pr
17-A
pr
18-A
pr
19-A
pr
20-A
pr
21-A
pr
22-A
pr
23-A
pr
24-A
pr
25-A
pr
26-A
pr
27-A
pr
28-A
pr
29-A
pr
30-A
pr
1-M
ay
2-M
ay
3-M
ay
4-M
ay
5-M
ay
6-M
ay
7-M
ay
8-M
ay
9-M
ay
10-M
ay
Cum
ulati
ve T
est C
ases
Total CAT Execution Plan Line
Cumulative Planned Execution
Cumulative Actual Execution
Forecast Trend
RETEST
14
Receive and Process Electronic Documentation
»Postal Wizard
»Mail.dat 09.1 (except Manifest mailings) Support Customer Supplier Agreements
Provision Start-the-Clock for Mail.dat users
Provision Address Correction for Mail.dat users
Support Mail.XML Appointment Scheduling, Data Distribution and Miscellaneous Messages
PostalOne! Release 20
Pre-Production Testing (CAT)
Production Environment
Test Environment
03/31 – 04/24/09 05/11/09 05/18/09
15
System Readiness
Identify and fix System Issues
Resource Readiness
Implement Learnings and Best Practices Establish and Validate Tolerances Refine Processes, Procedures
Mailer Readiness
Approval and Activation
Release 2 November 29, 2009
Intelligent Mail Program Evaluation
May 2009 –Onwards
16
Resources and Guides Update
17Ready, Set, Go!
ResourcesResources
Additional information about all of the topics covered in this presentation can be found on RIBBS™.
Click on Intelligent Mail® Services and then click on “Guides” as shown here.
All of the supporting documentation references is shown under “Important Links”.
Additional information about all of the topics covered in this presentation can be found on RIBBS™.
Click on Intelligent Mail® Services and then click on “Guides” as shown here.
All of the supporting documentation references is shown under “Important Links”.
18Ready, Set, Go!
ResourcesResources
19
Name of Guide Description Internet Link
“A Resource Map to Intelligent Mail Documents”
Lists all the documents, guides and source materials that you will need in transitioning to Intelligent Mail services.
“A Beginners Overview to Intelligent Mail Services”
Provides information on what Intelligent Mail services offer and require, Intelligent Mail barcodes and their benefits, the two service level options being offered, how to get started with the Intelligent Mail program and where to find additional resources to help you.
“A Guide to Intelligent Mail® for Letters and Flats”
Provides guidance on how to prepare your mail and electronic documentation and identifies the data that will be provided at no additional charge for Full-Service compliance. In addition, the Guide also describes what will be available in the first release of Intelligent Mail services.
“Electronic Documentation and Intelligent Mail: Ready, Set, Go”
Provides clear guidance on how to transition Intelligent Mail using either the Basic of Full-Service options. It also describes how to migrate from existing electronic documentation options to the new Full-Service capabilities.
Outlines the specifications for the messages used to send and receive data from PostalOne! Includes specifications for Full Service Feedback – Full Service ACS and Start-the-Clock
“Specification for the Intelligent Mail® Container Label and Intelligent Mail® Barcode”
This specification contains the requirements for the Intelligent Mail Container barcode, which is to be applied to Mailer generated container labels and is designed to be scanned at acceptance and at other points throughout transportation and processing
►Steps to Participating in Intelligent Mail® Basic option
– Step 1: Review Guides and Specifications
– Step 2: Acquire a Mailer ID
– Step 3: Design and Validate Barcodes with Mail Design Analyst
– Step 4: Move to Production Environment using Intelligent Mail
Barcodes
Ready, Set, Go!
24
Migrating to Full-Service Option
►Steps to Participating in Intelligent Mail® Full-Service
– Step 1: Review Guides and Specifications
– Step 2: Acquire a Mailer ID
– Step 3: Design and Validate Barcodes with Mail Design Analyst
– Step 4: Access Business Customer Gateway
– Step 5: Design/Test Electronic Documentation
– Step 6: Plan for Feedback
– Step 7: Move to Production Environment
Ready, Set, Go!
Migrating to Intelligent Mail
25Ready, Set, Go!
Test Electronic Documentation
►Basic: Electronic Documentation is Optional
►Full-Service: Electronic Documentation Required
– Postage Statement Wizard (< 10,000 pieces)
– Mail.dat
– Mail.XML (coming in November)
► Mailers Using Mail.dat 8-1 or 8-2 should continue to use these with the Price Change Release►Full Service requires Mail.dat 9-1. Mailers can start testing 9-1 in the Test Environment for Mailers (TEM) on May 18
26Ready, Set, Go!
Test Electronic DocumentationTest Electronic Documentation
* Parallel Test Process
Notification of BMEU Or BMS
PostalOne! Help Desk
Notification of Approval
Onsite Review
Transmission of Mail.dat files
Parallel Test Review
Migrate to Production
Notification sent to
Helpdesk
Business Customer GATEWAY
Mailer accesses Gateway - TEM
27
Business Customer Gateway
28Ready, Set, Go!
Online access to PostalOne! via Business Customer Gateway
►Existing Users will Migrate to Gateway– Logon using existing usernames and passwords– Services will mapped from roles they had
previously in PostalOne! or FAST►New Users will go online and gain access to
PostalOne! via the Business Customer Gateway
Business Customer GatewayBusiness Customer Gateway
29
29
•Customers of PostalOne! and FAST that logged in through the PostalOne! log on page between 3/30/2009 and 4/15/2009 had their Usernames & Passwords migrated to the Business Customer Gateway
•Those that didn’t log on but responded to the security question will be able to log on to the new Business Customer Gateway with their existing Usernames but will be required to change their passwords (Must have valid email address to change password).
•Others will need to register
Password CapturePassword Capture
30
• Gateway services are mapped from the roles previously assigned in PostalOne! or FAST
• External Site Administrator role in the old PostalOne! system will transfer to Business Service Admin role
30
Usernames & Roles
31
► Previously assigned roles in PostalOne! or FAST are renamed as a task
► The Manage Mailing Activity service is the combination of the old Preparer and Owner roles in PostalOne!
– Includes Electronic Data Exchange (Mail.dat, Mail.xml, Postal Wizard,and Mailer Test Environment, Reports, Balance & Fees, and Permit Profile
► Preparer and Owner Roles have been re-mapped
Business Service Administrator
PostalOne! External Site Administrator
Customer/Supplier Agreements
FAST - CSAs
Schedule a Mailing Appointment
FAST
Audit Mailing ActivityPostalOne! Owner Auditor
View Mailing Induction Activity
PostalOne! eDropship
Manage Electronic Return Activity (PRS)
PostalOne! PRS
Manage Electronic Verification Activity (eVS)
PostalOne! eVS
Manage Mailing ActivityPostalOne! Mail Owner
Manage Mailing ActivityPostalOne! Preparer
New Gateway Service Request
Previous System Role Request
Role Mapping
32
► Help Desk contacting customers to verify profile information• Spot check• Emphasis on multiple location / multiple user business customers
Business Customer Gateway will be available for customer profile preview on May 8, 2009
Profile Preview
Help Desk will be available to support customer profile issues.
• Monday – Thursday: MeetingPlace- 200 lines available- First come, first served
• Friday: WebEx- 500 lines available- First come, first served
Mailer Technical Webinars
PostalOne!® through the Business Customer Gateway
Announcement including links and phone numbers onRIBBS, Intelligent Mail Services, Latest News athttp://ribbs.usps.gov/index.cfm?page=intellmaillatestnews
Announcement including links and phone numbers onRIBBS, Intelligent Mail Services, Latest News athttp://ribbs.usps.gov/index.cfm?page=intellmaillatestnews
37
► Weekly Deployment Telecons with Area Marketing Managers, CSPA’s and IMB Coordinators
► Weekly Updates to BME
► Price Change and Technical Webinars
► BME Newsletter Updates
► Education Sessions with BME, Sales, BSN, Help Desk
► Detailed System Training
– Bolger: April 15 – 16, Norman: April 28 - 29
– Train-the-Trainer and key staff from every district
Single Class Co-Palletization Support– Supports Co-Palletization of Flats and Letters for Mail.dat and Mail.XML– Provides electronic verification from original identity of containers to co-palletized identity– Co-Pal and Qualification Report Changes
Additional Mail.XML Capabilities– Create and request Mailer IDs– Create and request Customer Registration IDs – Postage Adjustments
Review Required Supporting Documentation• Accesses search feature and displays Jobs• Postage Statements and Register• Qualification Report• Additional documentation as required• Identification of By/For relationship
Full Service – BMEU captures
Start-the-Clock• Selects the Job Arrival Time checkbox at
the Job display screenInitial
Verification
Finalize Postage
Statement
FinalizeVerification
MailerPrepares
Mailing
MailerPresents Mailing
Submits eDoc
Release MailFeedbackAvailable
In-DepthVerification
Initial Verification
Finalize Postage
Statement
FinalizeVerification
MailerPrepares
Mailing
MailerPresents Mailing
Submits eDoc
Release MailFeedbackAvailable
In-DepthVerification
Full Service Process Steps
Verification - Changes
44
Perform Cursory Review• Inspect Mailing for Preparation Defects
Intelligent Mail® Device scan – Data Sampling• 3 Pallets or Containers• 5 Handling Units• 30 Pieces (10 Pieces from 3 different Handling Units)
Determine Required PBV verifications• Enter First Page of Postage Statement
Initial Verification
Finalize Postage
Statement
FinalizeVerification
MailerPrepares
Mailing
MailerPresents Mailing
Submits eDoc
Release MailFeedbackAvailable
In-DepthVerification
Initial Verification
Finalize Postage
Statement
FinalizeVerification
MailerPrepares
Mailing
MailerPresents Mailing
Submits eDoc
Release MailFeedbackAvailable
In-DepthVerification
NO CHANGE
Full Service Process Steps
Verification - Changes
45
FS Record FS Container Release Date/Time• For DMU Verified / USPS Transported mail, once the mailing is
cleared for dispatching use the IMD scanner to scan the containers (IMbc) ready for release
• Mailer transportation will require the appropriate clearance documentation
• Container release scans are not required on containers being transported by the mailer to USPS processing facilities
Verification - Changes
46
FS Sampling May Trigger Subsequent Verification Procedures• Subsequent Verification Procedures may Impact Prices
No Specific Price Impacts for FS mailings, non-compliance penalties may result in the Denial of Full Service benefits;
• Start-the-Clock information and/or,• Container Visibility and/or,• Free ACS information
Initial mailer non-compliance issues would be data integrity problems, either in the eDocumentation or on the Physical Mail
Verification - Impacts
47
IMB PlacementAutomation Letter and BRM
MTAC General SessionApril 2009
48
Effective July 6, 2009*
The Postal Service™ will be revising Mailing Standards of the United States Postal Service, Domestic Mail Manual (DMM®) 202.5.3 and 507.9.8.1 to implement a more liberal barcode placement standard for mailers printing a barcode in the lower right corner of automation letters or Business Reply Mail® mailpieces.
IMB Placement Update
49
New RuleVertically, the barcode must be within the area
between 3/16 inch and 1/2 inch, both measured from the bottom edge of the piece.
to increase the upper limit of the allowable vertical placement for a
POSTNET or an Intelligent Mail barcode placed in the lower right corner of an automation letter or Business Reply Mail mailpiece to ½ inch from the bottom of the mailpiece.
provides an additional 1/16 inch of vertical clearance for mailers choosing to print a barcode in the lower right of automation letters or Business Reply Mail mailpieces.
IMB Placement Update
50
MERLIN ChangesMay 2009
MTAC General SessionApril 2009
51
Merlin Updates
Effective May 11, 2009* The Postal Service is revising the allowable tolerance for a
MERLIN barcode readability verification to eliminate the 80 – 89% threshold.
When a MERLIN or manual barcode readability verification falls below the 90% threshold, additional postage will be assessed based on the difference between the automation prices and the non-automation prices for the total automation price pieces in the mailing.
The Postal Service is revising the process for mailers who request an appeal when a mailing processed on the Mail Evaluation Readability Lookup Instrument (MERLIN) or manual barcode verification falls below the acceptable tolerance for barcode readability verification.
52
Merlin Updates
MERLIN Barcode Readability % of Verifications Feb 2008- Feb 2009
MERLIN Barcode Readability Number of VerificationsFeb 2008 - Feb 2009
-100200300400500600700800900
Th
ou
sa
nd
s
90% and Over
80-89%
Under 80%
Total
54
May 11 -- Merlin Updates
The Postal Service is also revising the process for appeals when a mailing processed on MERLIN or manual barcode verification falls below the acceptable tolerance for barcode readability verification
If an appeal is requested, the mailer must agree to pay for the Express Mail shipment (both to and from the PCSC) from their permit imprint or additional postage account.
Mailers will receive a refund for the Express Mail costs for any appeal upheld by the PCSC.
Mailers will not receive a refund when the PCSC denies an appeal. The PCSC will notify the mailer and the origin acceptance site of the results of the appeal and whether or not a refund is authorized.