Top Banner
1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
13

1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

Jan 17, 2016

Download

Documents

Claribel Dean
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

1

Model Data Collection Meeting Announcement

Entergy Transmission Planning Summit

New Orleans, LA

July 8, 2004

Page 2: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

2

Goals of Model Data Collection Meeting

• Ensure greater accuracy in long-term transmission system models

• Ensure consistency in load forecasting & data submittal– Entergy has proposed a standard format for load-serving

entities to submit load and resource forecasts

• Provide a forum for transmission customers to provide updated information on their facilities (e.g., generator characteristics, plant load data)

• Provide a forum for Entergy to share with stakeholders its approach and philosophy in transmission system planning and modeling

Page 3: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

3

The meeting will cover:

• Proposed template for submitting load and resource forecasts• Entergy’s modeling and transmission system planning philosophy• Stakeholders’ concerns and issues regarding system modeling

The meeting will NOT cover:

• Coordination of load and resource modeling with and for external systems– This process is addressed in Entergy’s participation in the VAST and

VST study groups.

• Specific study results or models

Page 4: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

4

Tentative Timeline of Model Update Process

October Entergy hosts stakeholders meeting to obtain customer input and suggested changes to long-term power flow models

Oct. – Dec. Entergy updates models and posts on OASIS

Dec. – Feb. Stakeholders provide additional input, suggested

revisions, or corrections

Mar. – May Entergy incorporates latest changes into models and coordinates model update with other SERC members via

the Regional study groups

Page 5: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

5

When: October 26, 20049AM to Noon

Where: New Orleans (exact location TBD)

Participants: Load-Serving Entities within the Entergy Control

Area

Page 6: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

6

Load & Resource Workbook• Contact Information• Demand – System• Demand by Bus (Summer)• Demand by Bus (Winter)• Weather Normalization• Capacity (Summer & Winter)• Firm Resource• Firm Transactions• Non-Firm Resources• Additional Information

Draft Workbook Template Available on OASIS for Review & Comments

http://oasis.e-terrasolutions.com/OASIS/EES/trans_planning_summit_summary.htm

Page 7: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

7

Contact Information

Page 8: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

8

Demand – System Summary

• Internal Demand•Standby Demand•Total Internal Demand•Direct Control Load Management

• Interruptible Demand•Net Internal Demand

Page 9: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

9

Demand by Bus (Summer & Winter)

•PSS/E Bus #•Point of Delivery (Entergy Station Name)•Point of Delivery (Customer Station Name)•MW•MVAr•Power Factor

Page 10: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

10

Weather Normalization

Page 11: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

11

Capacity (Summer & Winter)

Page 12: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

12

Firm and Non-Firm Resources

•Generator Name•PSS/E Bus #•PSSE Bus Name•PSSE Machine ID•Jurisdiction

•Summer & Winter• Pmax• Pmin• Qmax• Qmin• MW Output Owned

•Preferred Dispatch Order

Page 13: 1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

13

Firm Transactions

•OASIS #•Customer Making Request•Point of Receipt•Point of Delivery•Source•Sink•MW Requested•MW Granted

•Service•Begin•End•Status•Seller Comments•Renewal Deadline•Renewal Comments