1 MET SEMINAR 2007 Bon Pipkin AT&T
Jan 20, 2016
1
MET SEMINAR 2007
Bon PipkinAT&T
1
2
MET SEMINAR - 2007
The New AT&TRecent Merger Activities Combined:
• SBC
• AT&T Corporation
• Bell South
• Cingular
• News Release:
3
MET SEMINAR - 2007
4
Industry Leader •Wireless services with 61
million subscribers
•Broadband or high speed Internet DSL, with more than 11.5 million lines in service
•Business voice and data services
•IP-based services, one of the world’s leading providers
Wireless •AT&T has nation’s largest digital voice and data network
•AT&T’s new 3G network is a super-fast, IP-based voice and data network
•AT&T delivers the widest international coverage of any U.S.-based wireless carrier
•We provide more than 47,500 “hot spots” – Wi-Fi access points – in 79
countries
Voice TVMessaging
High Speed Internet
Virtual Private Network (VPN)
Voice over IP (VoIP)
IP-based and managed services
Web-hosting
Network security
Platform for the Future
Global Business Portfolio
5
Compliance
AT&T Services, Inc.
Common Systems District:
Support Staff for AT&T affiliate network common systems standards.
MET SEMINAR - 2007
6
AT&T Services, Inc.
Common Systems District Compliance:
Sets equipment standards and evaluates new technologies for compliance:
• ATT-TP-76200: Physical Design (NEBS)
• ATT-TP-76450: Interconnection Requirements
• Available at https://ebiznet.sbc.com/sbcnebs/
MET SEMINAR - 2007
7
Bon Pipkin Associate Director
John TablerionNEBS Evaluation – Group SPOC
John Messina - SMEBonding & Grounding/ESD/DC Power
Larry Wong - SMEHeat Dissipation/Shock & Vibration
Fire Stopping
Mahmoud Elkenaney - SMEElectrical Safety/EMI/Lightning & Power
Fault/Acoustic Noise/ICEP/
Bon Pipkin - SMETemperature &Humidity/
Airborne Contaminants/Altitude
Sha Hoda - SMEFire Spread/ Space Planning
AT&T Network Equipment Physical Requirements
ATT-TP-76200 TEAM
MET SEMINAR - 2007
8
MET SEMINAR - 2007
AT&T Network Equipment Interconnection Requirements
ATT-TP-76450 SMEsEd Granger: DC Power Dareus Starr: Synchronization
Jeff Langley: Alarms Mike Yeilding: Fiber
Wing Eng: Copper Doug Florence: Vendor Documentation
9
MET SEMINAR - 2007
Standards Document Merger Underway for:
• AT&T Local Exchange Carriers (Telcos)
• AT&T Internet Services, Inc. (U-Verse)
• AT&T L.D., ASI (LD, DSL)
• AT&T Corporation (Backhaul, Global, VoIP)
• Cingular (AT&T Wireless)
10
MET SEMINAR - 2007
Standards Merger: AT&T Corp.
• NEDS Standard Now
• Delays due to regulatory issues
• Requirements will be in ATT-TP-76200 & ATT-TP-76450
• Teams meeting now
• ATT-TP-76200 Issues: DC Power Transients
• ATT-TP-7645O Issues: AC Power, Dual Power Plants
• International Standards
11
MET SEMINAR - 2007
Standards Merger: Bell South
• Currently NEBS is TR-73638BT
• No Significant Differences due to TCG
• ATT-TP-76200 Standard & Process Effective Immediately
• ATT-TP-76450 under review
12
MET SEMINAR - 2007
Standards Merger: Cingular
• No Legacy Standards Document
• Notification sent to suppliers that ATT-TP-76200 and ATT-TP-76450 are now standards
• ATT-TP-76200 applicable levels and process under review
• ATT-TP-76450 under review
13
AT&T Network Equipment Physical Requirements
ATT-TP-76200 Standards Applications
• Equipment Application
• Deployment Locations
14
AT&T Network Equipment Physical Requirements
TP 76200 Evaluation Levels
• Level 1: Safety Requirements (Collocation, test heads, FOAs)
• Level 2: Safety and Modified Reliability Requirements
• Level 3: Safety and Full Reliability Requirements
• Ancillary
15
AT&T Network Equipment Physical Requirements
Equipment Deployment Locations• CO, Huts, CEVs
• Customer Premises
• Non-CO Buildings
• Mission Critical Data Rooms
• OSP Cabinets, Level 2, 3 Environments
• OSP Customer Premises
• AT&T Labs
16
MET SEMINAR - 2007
Industry Issues:
• RoHS
• Energy Efficiency
• Equipment Size
17
AT&T Network Equipment Physical Requirements
END
Questions?