1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering 26 Hiscott Street, Suite 201 St. Catharines, Ontario, L2R 1C6
19

1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

Dec 17, 2015

Download

Documents

Amos Riley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

1March 10, 2009

Electrical Interconnection Approval of NON-HONI Biogas

Projects

Prepared By:

Martin Lensink, P. Eng.Principal-In-Charge

CEM Engineering26 Hiscott Street, Suite 201

St. Catharines, Ontario, L2R 1C6

Page 2: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

2March 10, 2009

Table of Contents

1. Introductions

2. Description of Proponents Operations

3. Description of Electrical Supply

4. Description of Biogas Projects

5. LDC’s and LDC Approval

6. Conclusions

Page 3: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

3March 10, 2009

Introduction – CEM Engineering

• Engineer consulting firm (9+ people).

• Specialize in “thermal power”.

• Committed to helping energy intensive customers manage energy use & reduce energy cost, through proper application of high efficiency energy conversion technology.

• Established in early 2001.

• Lead by Martin Lensink:– 28+ years in cogen/energy sector

Page 4: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

4March 10, 2009

Introduction – Martin Lensink

• McMaster University, Mech. Eng. & Mgmt, 1980

• Five (5) Energy Firms Between 1982 and present

– Union Gas Ltd. (cogeneration via natural gas)– SNC Lavalin (cogeneration engineering)– U.S. Turbine Corp. (cogeneration major equipment)– Toromont Energy Ltd. (sale of cogenerated energy)– CEM Engineering (thermal power engineering)

Page 5: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

5March 10, 2009

Description of Proponents Operation

Bayview Flowers Ltd.

– Jordan Station

– www.bayviewflowers.com

– Established 1971

– 340,000 ft2

– Potted plants & bedding plants

– High quality cut flower arrangements

– Hot water heating system

Page 6: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

6March 10, 2009

Description of Proponents Operation

Vandermeer Greenhouses Ltd.

– Niagara-On-The-Lake

– www.vandermeergreenhouses.ca

– Established 1976

– 280,000 ft2

– Specialists in spray chrysanthemums

– Hot water heating system

Page 7: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

7March 10, 2009

Description of Proponents Operation

Morningside Greenhouses Ltd.

– Beamsville

– Established 1992

– 100,000 ft2

– Cut lilies (year round)

– Heating system is steam/hot water hybrid

Page 8: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

8March 10, 2009

Description of Electrical Supply

Bayview Flowers Ltd.

– Supplied at 27.6 kV (3 phase).

– 1,000 kVA transformer (wye-wye).

– 600 V distribution bus (2,000 A; 50 kA).

– Secondary metered.

– 180 kW emergency genset.

Page 9: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

9March 10, 2009

Description of Electrical Supply

Vandermeer Greenhouses Ltd.

– Supplied at 27.6 kV (3 phase).

– 1,000 kVA transformer (wye-wye).

– Secondary metered.

– 600 V distribution bus (1,200 A; 18 kA).

– Distribution bus being upgraded to 50 kA.

– 200 kW emergency genset.

Page 10: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

10March 10, 2009

Description of Electrical Supply

Morningside Greenhouses Ltd.

– Supplied at 4.8 kV (single phase).

– 167 kVA transformer.

– Secondary metered.

– Two (2) emergency gensets (190 kW; 122 kW).

– Loads served off two (2) buses.

Page 11: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

11March 10, 2009

Description of Biogas Project

Bayview Flowers Ltd.

– 1,200 m3 Primary Digester.

– 1,200 m3 Secondary Digester and storage of both biogas & digestate.

– 15 m3 dry feeder (TMR type).

– Biogas Cogeneration System (250 kWe and 250 kWt).

– Retrofit an existing boiler to burn biogas (with biogas blower).

Page 12: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

12March 10, 2009

Description of Biogas Project

Bayview Flowers Ltd.

Page 13: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

13March 10, 2009

Description of Biogas Project

Vandermeer Greenhouses Ltd.

– 1,526 m3 Primary Digester.

– 1,526 m3 Secondary Digester.

– 3,184 m3 digestate storage.

– 30 m3 Dry Feeder.

– Biogas Cogeneration System (335 kWe and 400 kWt).

– 40 m3 buried tank (for liquid input).

– Digestate separator.

– Remote monitoring & control via Internet.

Page 14: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

14March 10, 2009

Description of Biogas Project

Morningside Greenhouses Ltd.

– 1,526 m3 Primary Digester.

– 1,780 m3 Secondary Digester and storage of both biogas & digestate.

– 15 m3 dry feeder (TMR type).

– Biogas Cogeneration System (1900 kWe and 320 kWt).

– Remote monitoring & control via Internet.

Page 15: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

15March 10, 2009

LDC and LDC ApprovalBayview Flowers Ltd.

– LDC was Peninsula West Utilities Ltd. at the time.

– LDC is now Niagara Peninsula Energy Inc.

– Application was based on 1 MWe (ultimate).

– Request to connect submitted August, 2006.

– Need for CIA waived December, 2006.

– 1 MWe much less than 50% of historic minimum feeder load.

– No remote trip needed.

– Metering configuration changed for two (2) meters (Series Metered).

Page 16: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

16March 10, 2009

LDC and LDC Approval

1,000.00 500.00

0.00 0.00

500.00

M1 M2~

Load

Delivered Delivered

Consumed Consumed

Consumed

Bayview Flowers Ltd.

Metering Configuration – Series Metered, Secondary Metered

Page 17: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

17March 10, 2009

LDC and LDC Approval

Vandermeer Greenhouses Ltd.

– LDC is NOTL Hydro.

– CIA application submitted October, 2007.

– CIA based on 750 kWe.

– NOTL Hydro retained AESI to do CIA.

– CIA report completed on January, 2008.

– No modification required.

Page 18: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

18March 10, 2009

LDC and LDC Approval

Morningside Greenhouses Ltd.

– LDC is Grimsby Power.

– CIA application submitted January, 2008.

– Grimsby Power retained Dromey Design Inc. (Ian Dromey) to complete CIA.

– CIA report received May, 2008.

– No remote trip required.

Page 19: 1 March 10, 2009 Electrical Interconnection Approval of NON-HONI Biogas Projects Prepared By: Martin Lensink, P. Eng. Principal-In-Charge CEM Engineering.

19March 10, 2009

Conclusions

• Two (2) CIA’s took 3-4 months to process

• In one case, CIA was not needed at all.

• Another LDC recently waived need for CIA for a 250 kWe system on a 27.6 kV 3 phase feeder in Southwestern Ontario.

• Each LDC liked our proposed protection and control system (based on SEL-451).

• In each case, we had/have to demonstrate that we are off-line in <160 ms (in event of abnormal conditions on LDC feeder).