Top Banner
1 2 nd ISS Treadmill Development “T2 Project “ 3 rd Annual Countermeasures Summit March 7, 2007 Kevin MacNeill, NASA Deputy Project Manager Curt Wiederhoeft, Bioastronautics Contract, Project Manager NASA Johnson Space Center https://ntrs.nasa.gov/search.jsp?R=20070011772 2019-07-06T03:47:52+00:00Z
24

1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

Jul 06, 2019

Download

Documents

buidieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

1

2ndIS

S T

read

mill

Dev

elop

men

t“T

2 Pr

ojec

t “3rd

Ann

ual C

ount

erm

easu

res S

umm

itM

arch

7, 2

007

Kev

in M

acN

eill,

NA

SA D

eput

y Pr

ojec

t Man

ager

Cur

t Wie

derh

oeft

, Bio

astr

onau

tics C

ontr

act,

Proj

ect M

anag

er

NA

SA J

ohns

on S

pace

Cen

terhttps://ntrs.nasa.gov/search.jsp?R=20070011772 2019-07-06T03:47:52+00:00Z

Page 2: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

2

Purp

ose/

Age

nda

•Se

cond

Tre

adm

ill, T

2 D

evel

opm

ent

–P

roje

ct O

verv

iew

–D

evel

opm

ent P

lan

and

Sche

dule

–P

roje

ct C

halle

nges

–Al

ignm

ent o

f app

roac

h to

“u

ncon

stra

ined

” MM

OP

Req

uire

men

ts

AG

END

A

Page 3: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

3

Proj

ect O

verv

iew

•Th

e Sp

ace

Stat

ion

Prog

ram

Con

trol

Boa

rd (S

SPC

B) a

ppro

ved

Cha

nge

Req

uest

01

0318

A o

n Fe

brua

ry 1

6 20

07, a

utho

rizin

g th

e de

velo

pmen

t of a

sec

ond

trea

dmill

fo

r the

ISS.

–Th

e se

cond

ISS

trea

dmill

is re

quire

d to

mee

t the

ope

ratio

nal n

eeds

of a

6 m

an c

rew

. –

Del

iver

y of

the

certi

fied

syst

em is

requ

ired

by 9

/30/

08.

•Th

e SS

PCB

CR

was

ver

y sp

ecifi

c w

ith re

spec

t to

desi

gn a

ppro

ach

and

T2 lo

catio

n.

•D

irect

ive

Sum

mar

y:–

The

T2 s

hall

be lo

cate

d in

the

JEM

, JP

M1A

5–

SA/ S

pace

Life

Sci

ence

s D

irect

orat

e th

roug

h th

e B

ioas

trona

utic

s C

ontra

ct (B

C) s

hall:

•Pe

rform

flig

ht c

ertif

icat

ion

of a

Com

mer

cial

Off

the

She

lf (C

OTS

) Woo

dway

Pat

h tre

adm

ill.

•D

evel

op a

nd c

ertif

y a

crew

dat

a in

terfa

ce.

The

crew

inte

rface

sho

uld

optim

ize

use

of th

e C

OTS

des

ign

and/

or e

xist

ing

NA

SA

des

ign

(suc

h as

the

AR

ED

Pac

eboo

k) w

hen

reas

onab

le

to d

o so

. •

Iden

tify,

dev

elop

(onl

y as

requ

ired)

and

cer

tify

a po

wer

sup

ply

to p

rovi

de p

ower

from

the

ISS

V

ehic

le to

the

tread

mill

syst

em (c

rew

inte

rface

s, m

otor

, con

trolle

r and

sub

ject

load

ing

devi

ces)

. •

Iden

tify,

dev

elop

(as

requ

ired)

a c

ontin

genc

y us

e pa

ssiv

e su

bjec

t loa

ding

dev

ice.

•In

tegr

ate

all e

lem

ents

of t

he C

OTS

bas

ed tr

eadm

ill–

ESA

prov

ided

Sub

ject

Loa

ding

Dev

ice

(SLD

)–

Boei

ng p

rovi

ded

Vib

ratio

n Is

olat

ion

Sys

tem

bas

ed u

pon

PaR

ISde

sign

and

har

dwar

e–

CO

TS o

r Gov

ernm

ent F

urni

shed

Equ

ipm

ent (

GFE

) Avi

onic

s

Page 4: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

4

Trea

dmill

Bila

tera

l Dev

elop

men

t Con

cept

Sub

ject

Loa

ding

Dev

ice

(SLD

)

Trea

dmill

Vib

ratio

n Is

olat

ion

Sys

tem

(VIS

)

SLD

Con

trolle

rSL

DIn

stru

men

tatio

n

Phys

ical

Inte

rface

Phys

ical

Inte

rface

Phys

ical

Inte

rface

Trea

dmill

Con

trolle

rTr

eadm

illIn

stru

men

tatio

n

Cre

wIn

terfa

ce(A

RE

D

pace

book

)

Stru

ctur

e

Dat

a In

terfa

ce

ESA

Res

pons

ibilit

y

SA

/BC

Res

pons

ibilit

y

ISS

Vehi

clePo

wer

Inte

rface

Boei

ng R

espo

nsib

ility

Ops

Lan

Pow

er

Pow

er C

onve

rter

Page 5: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

5

Ove

rall

conc

ept

•Th

e tre

adm

ill c

an fi

t with

in th

e in

terio

r env

elop

e of

an

Inte

rnat

iona

l Sta

ndar

d P

aylo

ad

Rac

k w

ith s

uffic

ient

spa

ce a

nd

volu

met

ric m

argi

ns to

mak

e th

e in

tegr

atio

n of

har

dwar

e fo

r m

ount

ing

of th

e tre

adm

ill,

VIS

/Rac

k in

terfa

ce, s

ubje

ct

Load

ing

Sys

tem

and

rack

st

ruct

ural

rein

forc

emen

t co

mpo

nent

s fe

asib

le.

Page 6: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

6

Har

dwar

e El

emen

ts

•C

OTS

Woo

dway

trea

dmill

as

the

exer

cise

mac

hine

(han

drai

l will

be

rem

oved

)

Page 7: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

7

•R

atio

nale

to u

se C

OTS

har

dwar

e w

as c

aptu

red

in th

e B

ioas

trona

utic

s C

ontra

ct’s

Fin

al R

epor

t on

the

Find

ings

of t

he C

OTS

Tr

eadm

ill, N

ovem

ber,

2006

–A

sses

smen

t was

per

form

ed p

er N

AS

A E

ngin

eerin

g st

anda

rds

(EA

-WI-

016,

Har

dwar

e U

tiliz

atio

n in

Flig

ht H

ardw

are

Dev

elop

men

t) –

Ass

essm

ent e

stab

lishe

d th

at th

e w

oodw

aytre

adm

ill m

et c

riter

ia fo

r use

of

CO

Tsha

rdw

are

in a

flig

ht d

evel

opm

ent

•R

obus

t mec

hani

cal a

nd e

lect

rical

des

ign

coup

led

with

hig

h te

rres

trial

relia

bilit

y of

sys

tem

wer

e ke

y fa

ctor

s in

the

Woo

dway

Trea

dmill

pas

sing

the

CO

TS a

sses

smen

t for

flig

ht h

ardw

are

–Th

ousa

nds

of u

nits

bei

ng u

sed

in th

e fie

ld u

nder

“hea

vy” w

ork

cond

ition

s (P

rofe

ssio

nal s

ports

trai

ning

, etc

.)

•M

inim

al m

odifi

catio

ns re

quire

d to

mee

t maj

ority

of M

MO

P

requ

irem

ents

and

allo

w fo

r int

egra

tion

into

PaR

ISra

ck

Har

dwar

e El

emen

ts

Page 8: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

8

Har

dwar

e El

emen

ts

•In

tern

atio

nal S

tand

ard

Pay

load

Rac

k (IS

PR

) will

be

the

T2 “c

onta

iner

Page 9: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

9

Har

dwar

e El

emen

ts, c

ontin

ued

•IS

PR

will

requ

ire s

truct

ural

m

odifi

catio

ns to

sup

port

T2

inte

grat

ion

and

oper

atio

ns–

Sam

e m

odifi

catio

n m

ade

to th

e M

ARES

(Mus

cula

r A

troph

y R

esis

tive

Exe

rcis

e Sy

stem

)–

Mod

sw

ill pr

ovid

e ad

ditio

nal s

treng

th,

stiff

ness

and

pro

visi

ons

to

hard

mou

nt th

e T2

in th

e ra

ck–

To m

eet v

ibra

tion

requ

irem

ents

, T2

will

requ

ire b

alla

st to

incr

ease

in

ertia

Page 10: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

10

Cha

nge

Def

initi

on/B

ackg

roun

d

Low

er Is

olat

ion

Ass

embl

y w

ithK

ick

Pla

te R

otat

ion

•P

assi

ve R

ack

Isol

atio

n S

yste

m (P

aRIS

), or

igin

ally

des

igne

d to

pr

otec

t sen

sitiv

e R

ack-

inst

alle

d pa

yloa

ds fr

om v

ehic

le v

ibra

tions

, us

ed “i

n re

vers

e” to

atte

nuat

e R

ack

vibr

atio

ns b

ack

to th

e ve

hicl

e—B

oein

g D

esig

n

Har

dwar

e El

emen

ts/ P

aRIS

Page 11: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

11

Har

dwar

e El

emen

ts, c

ontin

ued

•P

ower

to th

e Tr

eadm

ill

subs

yste

ms

will

be

prov

ided

usi

ng

the

Spa

ce S

tatio

n P

ower

Con

trol

Mod

ule

(SS

PC

M)

–C

apab

le o

f pow

er u

p to

10

payl

oads

w/in

a ra

ck–

Har

dwar

e cu

rrent

ly in

ISS

in

vent

ory

(HH

R R

ack)

, the

refo

re

max

imiz

es u

se o

f exi

stin

g in

vent

ory

to re

duce

T2

syst

em

cost

–C

an b

e us

ed a

s-is

or

“can

niba

lized

” for

veh

icle

pow

er

dist

ribut

ion

SSPC

M

Page 12: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

12

Har

dwar

e El

emen

ts, c

ontin

ued

•T2

sys

tem

will

gen

erat

e si

gnifi

cant

am

ount

s of

hea

t dur

ing

oper

atio

n–

Avio

nics

Air

Ass

embl

y (A

AA

) is

desi

gned

to c

ool u

p to

10

payl

oads

with

in a

rack

–C

an b

e ad

apte

d fo

r tre

adm

ill co

olin

g–

“AA

A” a

lso

curre

ntly

in IS

S

inve

ntor

y, m

axim

izin

g us

e of

ex

istin

g in

vent

ory

to re

duce

T2

syst

em c

ost

Page 13: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

13

Har

dwar

e E

lem

ents

•To

uchs

cree

nTa

blet

PC

, cer

tifie

d as

the

user

inte

rface

for t

he

Adv

ance

d R

esis

tive

Exe

rcis

e D

evic

e (A

RE

D),

used

as

a co

ntro

l pa

nel

–Al

so c

urre

ntly

in IS

S in

vent

ory—

redu

cing

T2

Sys

tem

Cos

t

Page 14: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

14

Har

dwar

e El

emen

ts, c

ontin

ued

•P

assi

ve, c

ontin

genc

y S

LDs

will

mak

e us

e of

exi

stin

g de

sign

s.

Con

side

ratio

ns in

clud

e: T

VIS

bun

gees

, or T

VIS

sty

le w

ith in

crem

enta

l im

prov

emen

ts, R

ussi

an S

ubje

ct L

oadi

ng D

evic

e (B

D1)

or m

odifi

ed R

ED

ca

nist

ers.

Page 15: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

15

TRD

ML2

, JP

M1A

5

TRD

ML2

, JP

M1A

5

RM

S,

JPM

1A6

EPS2

, JP

M1D

5 AVC

O,

JPM

1F5

Page 16: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

16

Impa

cts

Maj

or M

ilest

ones

•A

utho

rizat

ion

to P

roce

ed re

quire

d by

2/1

6/07

•S

yste

ms

Req

uire

men

ts R

evie

w-3

/16/

07•

ES

A S

LD F

easi

bilit

y R

evie

w -4

/07

•E

SA

SLD

ATP

Rev

iew

-5/0

7•

Avi

onic

s E

lem

ent P

DR

/ sys

tem

leve

l con

side

ratio

n-Ju

ly 2

007

•A

vion

ics

Ele

men

t CD

R/S

yste

m S

DR

-Oct

ober

200

7•

Trea

dmill

Ele

men

t SD

R-J

uly

2007

•IS

PR

Ele

men

t (w

ith p

assi

ve S

LD) S

DR

-Nov

embe

r 200

7•

Sys

tem

Inte

grat

ion

Rea

dine

ss R

evie

w-J

anua

ry 2

008

•E

lem

ent L

evel

Cer

tific

atio

n Te

stin

g-D

ecem

ber 2

007-

Mar

ch 2

008

•S

yste

m A

ssem

bly-

Janu

ary

-Apr

il 20

08•

Inte

grat

ed S

yste

m C

ertif

icat

ion-

Apr

il 20

08-A

ugus

t 200

8•

Sys

tem

s A

ccep

tanc

e R

evie

w-S

epte

mbe

r 200

8•

Han

dove

r for

MP

LM In

tegr

atio

n-S

epte

mbe

r 200

8

Sum

mar

y Sc

hedu

le

Page 17: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

17

Inte

grat

ed

BCC/

T2

Elem

ent

Boein

g/VI

S

ESA/

SLDAT

P2/1

6/07

SRR

3/16

FY’07

FY’08

Syst

emIn

tegr

atio

nRe

adin

ess R

eview

1/08

Syste

m As

semb

lyInt

egra

ted S

ystem

Cer

t

FCA/

PCA

Avi

onic

s PD

R7/

07A

vion

ics

CD

R10

/07

ISPR

SD

R(w

/ pas

sive

SLD

)11

/07

TM E

lem

ent

SDR

7/07

Elem

ent L

evel

Cert

Tests

Elem

ent L

evel

Cert

Tests

Inte

grat

ed a

naly

sis

(Str

uctu

ral I

nteg

rity

/Dyn

amic

s / S

afet

y)

3/14

(ten

t) Sy

stem

Req

uire

men

ts R

evie

w

11/3

0 R

ack

DD

250

(Tra

nsfe

r to

Bio

astr

onau

tics)

2/28

Vis

/ um

bilic

al D

D25

0 (T

rans

fer t

o B

ioas

tron

autic

s)∼

Test

Isol

ator ∼

∼ISPR

mod

ifica

tions

for P

aRIS

VIS

/ um

bilic

als

man

ufac

ture

Mod

Tes

t Art

icle

∼∼

HH

R D

e-in

tegr

atio

n

∼Detai

l Des

ign

Boe

ing

only

Des

ign

Rev

iew

∼Ra

ck M

ods

Star

t

Elem

ent T

ests

Com

plet

e

Elem

ent T

ests

Com

plet

e

Inte

grat

ed T

2 Pro

ject S

ched

ule

FY’09

Requ

. Def

Preli

mina

ry De

sign P

hase

Detai

led D

esign

Pha

sePr

oduc

tion &

Ass

embly

Certif

icatio

n Tes

ting

Deplo

ymen

t

SLD

Feas

ibilit

yRe

view

4/07

SLD

ATP

5/07

TBD

TBD

Page 18: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

18

T2 P

roje

ct C

halle

nges

•JA

XA is

in fu

ll ag

reem

ent w

ith th

e de

velo

pmen

t of a

sec

ond

ISS

trea

dmill

. H

owev

er, t

hey

are

conc

erne

d ab

out m

icro

grav

ity d

istu

rban

ces

that

will

resu

lt fr

om T

2 op

erat

ions

in th

e JE

M a

s w

ell a

s m

odifi

catio

ns to

the

exis

ting

MO

U fo

r re

sour

ce a

lloca

tions

and

acc

omm

odat

ion

right

s in

the

Japa

nese

Ele

men

t.–

NA

SA

is n

egot

iatin

g w

ith J

AX

A to

inte

grat

e th

e T2

und

er e

xist

ing

payl

oad

agre

emen

ts a

nd

allo

catio

ns. A

ntic

ipat

ed m

icro

grav

ity d

istu

rban

ces

and

the

utiliz

atio

n im

pact

s w

ill be

wor

ked

with

JA

XA

as

they

bec

ome

furth

er c

hara

cter

ized

.–

Nod

e 3

is a

pot

entia

l bac

k up

loca

tion

for t

he T

2 bu

t wou

ld re

quire

som

e m

odifi

catio

ns to

ac

com

mod

ate

the

stru

ctur

e.

•Th

e ES

A d

esig

ned

activ

e SL

Ds

will

ver

y lik

ely

not b

e la

unch

ed w

ith th

e re

st o

f the

T2

sys

tem

. Min

istr

y ap

prov

als

and

cont

ract

ing

with

indu

stry

will

dela

y st

art o

f SL

D d

evel

opm

ent.

A d

eliv

ery

sche

dule

for t

he S

LDs

is n

ot a

ntic

ipat

ed u

ntil

late

20

07.

–N

AS

A a

nd E

SA

will

com

mun

icat

e re

gula

rly o

n sc

hedu

le a

nd in

terfa

ce re

quire

men

ts. A

n IC

D o

r ID

D w

ill be

pro

vide

d fro

m N

AS

A to

ES

A to

aid

in S

LD d

esig

n.–

NA

SA

will

laun

ch c

ontin

genc

y/in

terim

pas

sive

SLD

sfo

r cre

w u

se u

ntil

such

a ti

me

that

the

activ

e S

LDs

are

read

y.–

NA

SA

will

mai

ntai

n a

seco

nd fl

ight

-like

T2

syst

em fo

r int

egra

ted

test

ing

of th

e E

SA

SLD

sw

hen

they

are

del

iver

ed.

•Th

e Pa

RIS

has

been

unt

este

d fo

r atte

nuat

ing

the

type

s of

forc

es a

ntic

ipat

ed b

y cr

ews

runn

ing

on th

e tr

eadm

ill.

Of s

peci

al in

tere

st a

re th

ose

forc

es g

ener

ated

at

very

low

freq

uenc

ies.

–Th

e ex

istin

g P

aRIS

mod

el is

bei

ng s

uppl

emen

ted

from

dat

a re

cent

ly c

olle

cted

at J

SC

usin

g th

e W

oodw

ayPa

th a

s a

runn

ing

plat

form

. Dat

a fro

m th

e te

stin

g is

exp

ecte

d to

be

read

y to

sup

port

the

SR

R o

n M

arch

15t

h.

Page 19: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

19

Cha

nge

Def

initi

on/B

ackg

roun

d

•S

ee A

ttach

men

t

Alig

nmen

t of C

OTS

Des

ign

App

roac

h w

ith U

ncon

stra

ined

M

MO

P R

equi

rem

ents

Page 20: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

20

Bac

k U

p S

lides

Page 21: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

21

Cha

nge

Def

initi

on/B

ackg

roun

d

•Pa

RIS

ISPR

Mod

ifica

tion

Req

uire

men

ts–

Upp

er Is

olat

or A

ssem

bly

Atta

chm

ent P

oint

s•

Dril

l Hol

es in

Com

posi

te S

kin

(cur

rent

on

‘402

dra

win

g)•

Atta

ch B

acki

ng P

late

to S

kin

usin

g E

ddie

Bol

ts (c

urre

nt o

n ‘4

02 d

raw

ing)

•A

dd 2

Vel

cro

Stri

ps (H

ook;

2 in

ch x

1.5

”)–

Low

er Is

olat

or A

ssem

bly

Atta

chm

ent P

oint

s•

Dril

l Hol

es in

Com

posi

te S

kin

(qty

4) f

or S

pace

r/Iso

latio

n P

late

Atta

chm

ent (

new

in

terfa

ce)

•A

ttach

Z-a

xis

Isol

ator

Atta

chm

ent B

rack

et to

Ski

n us

ing

Edd

ie B

olts

(cur

rent

on

‘402

dra

win

g)–

Com

posi

te S

kin

Rel

ief f

or Z

-axi

s Is

olat

or (c

urre

nt o

n ‘4

02 d

raw

ing)

–A

ccom

mod

atio

n of

Z-a

xis

Rot

atio

n S

nubb

ers

(new

inte

rface

)–

Acc

omm

odat

ion

of Is

olat

ion

Pla

te re

ar S

tand

offs

(new

inte

rface

)

Page 22: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

22

Cha

nge

Def

initi

on/B

ackg

roun

d

Upp

er Is

olat

ion

Ass

embl

y

•Exi

stin

g Pa

RIS

Har

dwar

e

Page 23: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

23

Cha

nge

Def

initi

on/B

ackg

roun

d

Airp

el A

ssem

bly

2.5#

Spr

ing

Sprin

g A

dapt

er C

ap

Left

Han

d A

djus

tmen

t C

ap

Sprin

g A

dapt

er C

ap

Orif

ice

Fitti

ng w

ith 1

5 M

icro

n Sc

reen

Rig

ht H

and

Adj

ustm

ent

Cap

with

Bal

l Plu

nger

G

roov

es

Ret

aini

ng R

ing

Bal

l Plu

nger

Cre

w A

djus

tmen

t Ada

pter

(fo

r Upp

er Is

olat

ors

only

)

Bre

athe

r Fitt

ing

with

15

Mic

ron

Scre

en

Set S

crew

for A

dapt

er

atta

chm

ent (

Qty

2)

Wire

Rop

e 2

PL

Kno

b w

ith

reta

inin

g rin

g 2

PL

Atta

chm

ent

guid

e 2

PL

•Exi

stin

g Pa

RIS

Har

dwar

e

Page 24: 1 ISS Treadmill Development “T2 Project - NASA · • The treadmill can fit within the interior envelope of an International Standard Payload Rack with sufficient space and volumetric

24

Cha

nge

Def

initi

on/B

ackg

roun

d

MTL

Sup

ply

Hos

eM

TL R

etur

n H

ose