Top Banner
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project implemented by the IRIS Europe Consortium The European Union's TEN-T programme supporting …
19

1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Apr 01, 2015

Download

Documents

Dakota Bauer
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

1

IRIS Europe II – Implementation of River Information Services in Europe

This project is co-funded by the European Commission / DG-TREN / TEN-T

A project implemented by the IRIS Europe Consortium

The European Union's TEN-T programme supporting …

Page 2: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

17-11-2010

Budapest

RIS key technologies(The first thoughts)

andQuality of RIS services

Page 3: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 33 5 november 2010

RIS Key technologies and their harmonised use in RIS servicesWhy this paper?

• Common issues meeting 2009 • Request of Ivo ten Broeke

• European wide harmonised implementation of RIS requires common approach in application of RIS key technologies

• Avoid “misuse” of RIS key-technologies leading to frustration of users

• IRIS Europe II QoIS• Update of the PIANC RIS guidelines

Page 4: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 4

november 2010

RIS key technologies• Inland AIS,

• Notices to Skippers,

• Electronic Reporting and

• Inland ECDIS

Other technologies

• Radar

• VHF

• Internet

• ….

Page 5: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 5 5 november 2010

Character of the RIS information services• Type of information• Communication method• Sensitivity of the information • Direction of the information flow• Volume of the information that need to be transferred• Requirements on the age of the information

More?

Page 6: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 6

inla

nd E

CD

IS

inla

nd A

IS

Ele

ctro

nic

report

ing

Noti

ces

to S

kip

pers

VH

F (a

udio

)

radar

(navig

ati

on

)

type of information geo related land and waterway info x x x xship related information x x x xvoyage related information x x xcargo related information x x xcommercial information (x)

geo related information weather (actual and predicted) information x xice (actual and predicted) information x xActual information on infrastructure, fairway and land x x x xPredicted information on infrastructure, fairway and land x x xaids to navigation x x x xInformation on waterconditions (actual and predicted) x

ship related information dynamic (safety) information x xsemi static information (variations less then hourly or more then monthly) x xstatic ship data x x

communication method broadcast x x x xpoint to point xcooperative technology x x xnon-cooperative x x x

sensitivity commercial and privacy sensitive information xnon sensitive information x x x x x x

direction of the information flow ship to ship x xship to authority x x xauthority to authority xauthority to ship x (x) x x xauthority to bussiness xbusiness to authority x

volume of information to be tranfered Low (tbd) x x x

medium (tbd) x x xhigh (tbd) x x

age of the information: less then 1 minute x x x1 minute - 1 hour x x x1 hour - 1 day x x xmore then one day x x x x

type/character of the information

5 november 2010

First Draft

Page 7: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 7

Draft Recommendations

• The EC is recommended to base the use of RIS key technologies on the balancing as provided in the above table. • a pre-condition to the projects funded by the

European projects• The RIS authorities and their RIS providers are

recommended to base the use of RIS key technologies on the balancing as provided in the table.

Page 8: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 8

Quality of RIS

But, how to determine and define the quality aspects of RIS-Key-technology and RIS-services?

Page 9: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 9

Example of need for Quality Guidelines

The future of Vessel Traffic Management in the NL

• Setting up vessel traffic management in 2015 in NL (PL Mr. Cas Willems)

• Direct relation between VTM, calamity abatement, lock planning, E-Reporting, Vessel Tacking & Tracing, Inland ENC services

• National necessity for quality requirements is one thing, internationally it is even more important.

Page 10: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 10

VCM

’s’s

OR3: LigplaatsbeleidsplanOR3: Ligplaatsbeleidsplan

AO3: Verkeersbeleid en regels

AO3: Verkeersbeleid en regels

Nautische veranderopgave

Nautische veranderopgave

Internationale ontwikkelingen

Internationale ontwikkelingen

IDVV 2: Informatiediensten op

schepen ( IDoS )

IDVV 2: Informatiediensten op

schepen ( IDoS )

Pro

ject

s p

rovi

din

g in

pu

t

Pro

ject

to

pro

vid

e o

utp

ut

Example projects

Pre-conditional projects and developments

VTM Future

Corridor orientedoperations

MobileInformation

services

InternationalDevelopments

Rules and legislation

Natuical resource management

Calamity abatement

organisation

Management scenarios

Planning of waitting places

ENCs

Remote control Locks, bridges

FIS

AISshoreinfra

EMIS

VOS

VTSScheldt

VTM vision Rotterdam

TC future(Roads)

LIVRA

Page 11: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 11

Activity 4 Scope issue

• Business processes not standardized

• Information elements supplied by RIS service not all standardized

40 Quality aspects * 70 RIS Services * 10 information elements (avg) per service * xx business processes * yy organizational settings * zz navigational unique area’s …… etc = n dimensional array with 10000’s of quality aspects to explore

Scope had to be limited to a useful and workable subset of Services and Quality aspects to cover

Page 12: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 12

Selected RIS ServicesERI:

• STI.4 Presentation of vessel's characteristics

• STI.5 Presentation of cargo's characteristics

• LBM.2.1 / PTM 2.1 ETAs of approaching vessels

FIS:

• FIS.6 Temporary obstructions in the fairway

• FIS.7 Present and future water levels at gauges

VTT:

• TTI.1 Presentation of own vessel's position

• TTI.2 Presentation of other vessel's position

• VTS.3 / CAS.2 Assessment of traffic situation

Page 13: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 13

Selected quality aspects

• Availability

• Ability to use data and facilities

(hardware, software, network/communication facilities etc)

• Correctness

• Accuracy

• Deviation from real world (information content)

• Age

• Time passed by since measurement or creation (information age)

No further choices made on limiting the scope irt

• Navigational conditions

• Traffic conditions

• Business processes to cover

• Information elements supplied by the service

Page 14: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 14

Scope of QoIS within information chain

RIS services InformationInformationData suppliers

(services)ExternalInformation

Quality ofInformation

(output)

Quality ofServices

(Delivery facilities)

Quality ofInformation

(data sources)

Quality ofServices

(Access facilities for data sources)

Processrequirements

IRIS2 Ac4 Scope

RIS users

Datasources

Information Chain

Page 15: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 15

Evaluation

• Peer reviews with expert groups

• Workshops with Belgium authorities (central and Flemish)

• Workshop with harbor authorities

• Workshop with DE

• Workshop focused on calamity handling (NL en BE, Evegem)

• Workshop within Rijkswaterstaat addressing “Mission Critical

Systems” and “Processes vitally/critically important for society”

Page 16: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 16

Current status, September 2010 (1)

• SuAc 4 Meetings:- 9 April 2010 Budapest, 1 June 2010 Rotterdam, - 23/24 September 2010 Varna (BG), - 20 January 2011 Vienna

• There is mutual understanding of the challenges and importance of this topic and the first results are promising

• Time has come to share findings with expert groups (chairmen)

• Evaluation approach to be finalized upon in coming months

Page 17: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 17

Jos van SplunderRijkswaterstaat The Netherlands

Page 18: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 18

Figures of availability

Page 19: 1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.

Project is co-funded by the European Union (EC / DG-TREN / TEN-T)© IRIS Europe II I 19

Graphical representation of availability

Beschikbaarheid

98,6%

98,8%

99,0%

99,2%

99,4%

99,6%

99,8%

100,0%

100,2%

aug-09

sep-09

okt-09

nov-09

dec-09

jan-10

feb-10

mrt-10

apr-10

mei-10

jun-10

jul-10 aug-10

Maand

%

A

B

C