1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment & Systems
10

1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

Mar 30, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

1

INTRODUCTIONCABLE YARDING OPERATIONSHIGHLEAD, LIVE SKYLINE, RUNNING SKYLINEDEMONSTRATION/CONTEST

FOR 420Feb 1, 2001

James Hart

Cable Logging, Equipment & Systems

Page 2: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

2

CABLE YARDING• CABLE YARDING - MOVEMENT OF LOGS FROM

STUMP SITE TO LANDING USING A MACHINE

EQUIPPED WITH MULTIPLE DRUMS (OR

WINCHES) OPERATED FROM STATIONALRY

POSITIONS IN THE LANDINGS.

• FIRST STEAM DONKEY (SMALL YARDER WITH A

VERTICAL BOILER) WAS INVENTED ~1881 BY

JOHN DOLBEER TO GROUND SKID LOGS IN

OREGON

• FIRST SKYLINE CABLE SYSTEM USED IN

MICHIGAN ~ 1886 BY HORACE BUTTLER.

• SYSTEMS STILL IN USE

OLD PNW YARDER

Page 3: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

3

BASIC CABLE YARDING SYSTEM COMPONENTS

• YARDER - TYPICALLY A RECTANGULAR FRAME BUILT FROM I BEAMS, WITH ENGINE AND DRUMS

• TOWER, WITH GUY LINES

• WIRE ROPE 6 STRANDS OF 19 WIRES EACH– MAIN LINE 1-1.25” -- HAULBACK LINE 3/4-7/8”

– SKYLINE 1.5-2” -- OTHER MISC.

• BLOCKS - PULLEYS

• CKOKER - SHORT FLEXIBLE WIRE ROPE

• BUTT RIGGING - COMBINATION OF CHAINLINKS, CLEVISES, AND SWIVELS CONNECTING

– MAIN HAUL LINE

– CHOKER OR GRAPPLE, AND

– HAUL-BACK LINES

• CARRAGE - COMBINATION OF PULLEYS, CABLE, ETC. THAT RIDE ON SKYLINE, ARE PULLED BY MAINLINE AND MAYBE A HAUL-BACK LINE, HAVE CHOKERS OR A GRAPPLE; AND PERHAPS A SLACKLINE

Page 4: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

4

HIGHLEAD SYSTEM

• CLEARCUTS

• CONSTANT SLOPES

• 30-70% SLOPES, 1000’

DISTANCES

• UPHILL YARDING

• 2 DRUM YARDERS

• DRUM -- MAINLINE --

BUTT RIGGING (with

CHOKERS/GRAPPLE) --

HAUL-BACK LINE (with

BLOCKS) -- DRUM

• 20 LOGS/DAY

Page 5: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

5

HIGHLEAD SYSTEM [CONT]

SKAGIT 3-DRUM PORTABLE TOWERWITH GUY LINES

CABLE LOGGED CORRIDOR IN PNW

Page 6: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

6

Page 7: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

7

LIVE SKYLINE SYSTEM• SKYLINE LIFTS LOGS • LIVE SKYLINE MOVES

UP/DOWN TO GET CARRAGE TO LOGS

• 2-DRUM YARDER IS ELEVATED, USES GRAVITY AND NO HAUL-BACK LINE

• 30-90% SLOPES, 500-4000’ • DRUM -- SKYLINE --ANCHOR

(or TAIL-SPAR TOWER)• DRUM -- MAINLINE --

CARRAGE (with CHOKERS OR GRAPPLE)

• ELEVATED OPERATION– ALLOWS PARTIAL CUTS – DECREASES DISTURBANCE

• 470 LOGS/DAY

Page 8: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

8

RUNNING SKYLINE SYSTEM• 3rd DRUM FOR HAULBACK

LINE • DRUM -- SKYLINE --ANCHOR (or

TAIL-SPAR TOWER)

• DRUM -- MAINLINE -- CARRAGE (with CHOKERS OR GRAPPLE) - HAUL-BACK - DRUM

• ELEVATED SKYLINE– ALLOWS PARTIAL CUTS

– DECREASES DISTURBANCE

• UPHILL OPERATION

• 4th-DRUM CAN ADD SLACK-PULLER TO LOWER/RAISE CABLE AND KEEP SKYLINE STATIC

• 30-90% SLOPES, 500-4000’

SLACK-PULLER CARRAGE

Page 9: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

9

CABLE LOGGING SYSTEMS------------------------------------------ ADVANTAGES DISADVANTAGES• can yard logs over ground

on which tractors cannot operate

• Running skylines operate in any direction– up-slope– down-slope

• operate in any weather• less damaging to soil than

tractor skidding• operates faster than tractor

on same terrain

• limited primarily by the line capacities of the yarder drums

• the high-lead is used for only clear-cut

• the cost of moving, and changing yarding road are fixed, not efficient for low volumes of harvesting

• High costs per unit for low values per acre discriminates against small log operations

Page 10: 1 INTRODUCTION CABLE YARDING OPERATIONS HIGHLEAD, LIVE SKYLINE, RUNNING SKYLINE DEMONSTRATION/CONTEST FOR 420 Feb 1, 2001 James Hart Cable Logging, Equipment.

10

27

OPTIMUM DISTANCES AND SLOPES FOR LOGGING SYSTEMS

HORSES?0-10%, 200-400’>10%, 100’

ENVIRONMENTAL IMPACTS?EROSION / SEDIMENTATIONLONG-TERM PRODUCTIVITY LOSSHIGH STREAM TEMPERATURESSPECIES HABITAT LOSS