1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

Jan 17, 2016

Download

Documents

Colleen Sparks
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

1

Integrated Development Programme

Permanent Secretary MINAGRI

DPCG

15 November 2007

Page 2: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

2

Content

Background & Objectives of the programme Main activities, Implementation Strategy and

Components Risks Conclusion

Page 3: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

3

Background and Objectives

Programme builds on ongoing efforts, policies and programmes and aims to support farmers in what they do best

MDG targets Vision 2020 EDPRS PSTA CAADP Investment recommendations Vision 2020 Umurenge National Decentralisation Strategy

This programme is implemented Across sectors, led by MINALOC, with MINAGRI, MINITERRE,MINICOM, MININFRA, MIFOTRA, MINEDUC ….

Page 4: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

4

Main Components of IDP

1. Increased Agricultural Productivity: “Crop intensification”, “Green Rev” etc (MINAGRI)

2. Value addition and marketing (MINICOM)3. Ecosystem Rehabilitation (MINITERE)4. Resettlement: grouped settlement Imidugudu

(MINITERE)5. Development of off-farm activities (MINICOM)6. Strengthening of rural financial systems

(MINECOFIN)7. Social protection and vulnerability management

(MINALOC)

Page 5: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

5

IMPLEMENTATION STRATEGY

Coordination-MINALOC Roll out meetings held between all sectors Meetings held at all levels of local

administration including Umudugudu Umurenge-implementing unit though

Umudugudu Technical Assistance from relevant Sectors

and Agencies-RADA, the OCIRs etc

Page 6: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

IMPLEMENTATION AT LOCAL LEVEL

6

1. Sensitization on land preparation by sector agronomist

2. Farming demonstration by group leaders

3. Input distribution4. Planting

5. Follow up on activities by Extension services during the whole season

Page 7: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

7

Responsibilities at different levels

Level Responsibilities

Central Gvt Availing inputs (Fertilizer, seeds, pesticides, etc)

Province Coordination of activities in districts & advocacy

Districts Planning, Coordination, monitoring, training, sensitization, reporting and accountability

Umurenge Storage & distribution of inputs

Akagari Mobilisation, Monitoring the distribution/supply of inputs

Umudugudu Collect list of farmers who need inputs and process, follow-up of program at households level

Household Efficient use of inputs, pay back inputs used at harvest, and organise into cooperatives

Page 8: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

8

Umurenge: Storage and Distribution

Contracts between different levels

On Availability & Distribution

of Inputs

MINAGRI/RADA

Households

Contracts specifying: Crop, Area and Quantity of Inputs

DistrictsOn Distribution

Imidugudu:Farmer registration (HHs)

AkagariFarmer consultation and organization

Page 9: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

9

Monitoring and Evaluation This programme in monitored by the National Steering

Committee lead by MINALOC

Local government teams composed of Governors and Mayors

Technical teams at decentralized levels supervise activities

Economic Change facilitators have been trained at all levels from Districts, Umurenge, Akagari and Umudugudu

Page 10: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

10

Selected crops and targeted production in 2008A

Province Crop Area ( ha )

Targeted productionYield Total

production ( T/ha ) 2008 (MT)

EDPRS 2012 Production Target (MT)

Eastern Maize 20 000 5 100 000 199 400

Northern Wheat 600 3 1 800 22 481

Irish 160 15 2 400 1 500 000

Southern Cassava 5 000 30 150 000 956 300

Budget = 5.2 Billion FrR

Page 11: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

11

Supported activities in the programme: 2008 A

Maize: 20.000 ha in Eastern Province, planted

Cassava: 5.000 ha in Southern Province, planting on going

Wheat: 600 ha In Northern Province, planted

Irish Potato: 160 ha In Northern Province, planted

Page 12: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

12

1. Maize Planting

Maize cultivation Kirehe District

Page 13: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

13

District Area Seeds DAP Urea

  planned cultivated planted planned distributed planned distributed planneddistributed

  Ha Ha Ha MT MT MT MT MT MT

Kirehe 10,000 10,000 9,400 300 300 1,000 975 1,000 0

Kayonza 2,300 2,300 2,300 60 60 200 200 200 0

Gatsibo 640 640 256 20 20 64 70 64 0

Bugesera 4,500 4,500 4,500 140 140 450 425 450 0

TOTAL 17,440 17,440 16,456 520 520 1,714 1,670 1,714 0

Maize Intensification

CIP up to 06/11/2008

Page 14: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

14

Cassava Intensification

District Area CuttingsProduction targeted

  PlannedAlready planted Planned Distributed

  Ha Ha MTKamonyi 700 278 7 000 000 2 780 000 21 000Muhanga 200 184 2 000 000 1 840 000 6 000Ruhango 1 725 508 17 250 000 5 080 000 51 750Nyanza 980 378 9 800 000 3 780 000 29 400Huye 1 025 519 10 250 000 5 190 000 30750Gisagara 500 291 5 000 000 2 910 000   15 000TOTAL 5 130 2 158 51 300 000 21 580 000 153 900

Page 15: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

15

Wheat and Potatoes Intensication

Wheat is being cultivated in Gicumbi on 600 ha

60 of hybrid wheat seed imported from Kenya and all distributed in Gicumbi

135 tons of NPK 17.17.17 distributed in Gicumbi for wheat growing.

Page 16: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

16

2. Value addition and marketing: Cooperative Development & Storage

In all districts farmers are sensitized to be grouped in cooperatives and their capacity strengthened

Farmers will be trained in storage and conditioning of produce to minimize post harvest losses

Hermetic storage will be imported and storage facilities constructed

Storage facilities of ex-OPROVIA will be rehabilitated

Page 17: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

17

3. Ecosystem rehabilitation and watershed management: Activities

Activities of concern: forestation of bare mountains, road sides, rehabilitation of degraded lands, etc

Protections of rivers, lakes, marshlands and protection of fragile ecosystems

Page 18: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

18

4. Resettlement: Imidugudu

An Umudugudu will have between 100 and 150 HHs and will be located where there are infrastructures or where they can be developed easily

Trials for getting roofing materials (tiles) burnt with peat are underway in Muhanga (Southern Province)

Modern kilns will be constructed in all districts

especially using youth cooperatives.

Page 19: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

19

5. Development of off-farm jobs and Social Protection

MINICOM, MIFOTRA and MINEDUC have an important role in training

An inventory of off-farm jobs will be done and targeted training conducted

Those engaged in these jobs will be given/facilitated to get Off farm credit packages

Those having land without means to put it to use will be sensitized to lend to those able to use

Landless but having strength will be assisted to get off-farms jobs through HIMO and will be facilitated to get off farm credit packages

Landless having no strength will receive special social assistance to help get food, Mutuelle de sante, education for children, handcraft jobs

Page 20: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

20

6. Development of rural financial systems

The team comprising of MINAGRI, MINECOFIN,

MINICOM, BNR, BRD, UBPR and Cooperative

Task Force will develop the strategy for this

program. The first draft is ready this Monday

Farmers received seeds and fertilizers on credit

Farmers are organized in cooperatives

Page 21: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

21

Challenges

Communication between different levels leading to misunderstanding of goals of the programme concerning prioritization

Page 22: 1 Integrated Development Programme Permanent Secretary MINAGRI DPCG 15 November 2007.

22

Murakoze cyaneThank you