Implementation of Application Portfolio Management

OverviewJuly 2006

Page 2: 1 Implementation of Application Portfolio Management Overview July 2006.

2

Portfolio ManagementPortfolio management is: a strategic and dynamic decision-making process to assess value, prioritize actions, and allocate resources to meet key enterprise objectives. A portfolio is: a collection of items grouped together to facilitate efficient and effective management so that fiscal, staffing, and other scarce resources can be optimally allocated to provide the most benefits or greatest value for investments made. The objective of portfolio management is: to optimize the enterprise’s IT portfolios in order to contribute to the organization’s successful performance and its sustained viability, value, and growth. The major tasks of portfolio management are: inventory and classify items in the portfolios, identify problems and opportunities, develop viable options, determine relevant criteria and weights, evaluate alternatives using pertinent information, and make reasoned and appropriate decisions. The results of portfolio management are: fact-based, data-driven, and analytics-oriented management decisions, using a consistent and disciplined approach within a well-defined governance structure.

Page 3: 1 Implementation of Application Portfolio Management Overview July 2006.

3

Portfolio Management GoalsInvestment Portfolio Management:

Identify, evaluate, and prioritize candidate investment opportunities that meet strategic business goals and objectives in the most effective and productive manner by appropriately considering and weighing key factors, such as alignment with agency missions or governmental initiatives, satisfaction of compliance mandates, delivery of desired returns or public value, initial and life cycle costs, architectural fit, risk profiles, staffing availabilities, and the inter-relations among investments.

Project Portfolio Management:Advance the management of IT implementation projects by assisting to clarify roles and responsibilities; provide for well-understood and comparable oversight; ensure they are planned well and researched thoroughly prior to starting; facilitate the management and monitoring of them to achieve, budget, schedule, scope, and quality expectations; and complete them successfully so that proposed business goals and objectives are realized and anticipated benefits and value accrue.

Page 4: 1 Implementation of Application Portfolio Management Overview July 2006.

4

Portfolio Management Goals (Cont’d)

Inventory applications; assess them using a variety of criteria (such as agreement with agency business strategies or governmental priorities, benefits and value to agency missions or business processes, costs to maintain and operate, ability to meet current and future agency business requirements, operational performance, technical status, and risks; and develop a management strategy for continued investments in them over their useful lives to optimize benefits-costs. This is done by: a) analyzing present and future status from business, financial, operational, technical, and risk perspectives; b) determining business-criticality of applications and risk-urgency of results from assessments; c) identifying areas of over- and under-investments and reallocating funds to give the most benefits or greatest value for monies spent; and d) developing the best approaches, priorities, and timeframes for enhancement, renovation, consolidation, elimination, or replacement. Assets should be retired when they no longer are cost-justified or risk-acceptable.

Applications Portfolio Management:

Page 5: 1 Implementation of Application Portfolio Management Overview July 2006.

5

Definition of Applications Portfolio Management

Portfolio management is a competency of applying structured processes to evaluate selected classes of application assets or resources, determine issues or variations for defined standards, and implement appropriate actions to resolve these issues. The objective of applications portfolio management is to maintain good awareness of the portfolio and to optimize life cycle cost, quality, risks, and value creation across each class of applications and integration assets/resources.

Source: Gartner Research Note titled The Application Management Activity Cycle dated 21 July 2006.

Page 6: 1 Implementation of Application Portfolio Management Overview July 2006.

6

Summary of Findings of Keane/Gartner Legacy Applications Study – December 2004

• In the portfolio of approximately 900 applications: 40% are considered critical for department mission/strategy; 17% are enterprise (statewide) applications; and 75 of the applications processed by the state data center require 1-day return-to-service capability.• The statewide portfolio is relatively young, with an average age of 7.5 years – since 1997, from 70 to 90 new or replacement applications have been added each year to bring down the average age.• Health status is: 23% presenting functional, technical, or both problems; 50% with some problems, but manageable; and 27% healthy, with a prescription for continuing on-going operations and maintenance.• Remediation timeframes are: 11% require action immediately (within next two years), 35% require action in the near term (2 to 4 years), and 54% require action in the long term (4 to 6 years).• Although the immediate needs of the portfolio appear to be manageable, projections of its future status, if no remediation actions are taken, indicate an increasingly deteriorating condition as the applications age.

Page 7: 1 Implementation of Application Portfolio Management Overview July 2006.

7

Framework for Managing IT InvestmentsI. Strategic Business I. Strategic Business and IT Planning and and IT Planning and Investment Selection Investment Selection

and Budgetingand Budgeting- Investment Portfolio - Investment Portfolio

Management (IPM) – Build, Management (IPM) – Build, Buy, and/or Implement the Buy, and/or Implement the

Right AssetsRight Assets

III. Investment III. Investment Operation and Operation and

Maintenance, and Maintenance, and Renewal, Retirement, Renewal, Retirement,

or Replacement or Replacement - - Applications Portfolio Applications Portfolio

Management (APM) – Maintain Management (APM) – Maintain and Operate Assets in the and Operate Assets in the Right Ways and Retire or Right Ways and Retire or

Replace Them at the Right Replace Them at the Right Times Times

II. Project ImplementationII. Project Implementation -- Project Portfolio Project Portfolio Management (PPM) – Build and Implement Assets in Management (PPM) – Build and Implement Assets in

the Right Mannerthe Right Manner

Life Cycle of IT

InvestmentsIdentify investments that best:

• Enable governmental initiatives or agency missions and strategies

• Result in financial returns – revenue generation or cost savings

• Provide better constituent services or program effectiveness

• Fit technical architectures

• Satisfy budget, staffing, and other constraints

• Meet risk profiles

• Clarifying roles and responsibilities

• Providing appropriate oversight

• Ensuring they are well planned and thoroughly researched prior to starting

• Defining, tracking, and evaluating project progress frequently to achieve budget, schedule, scope, and quality expectations

• Completing them successfully so that business goals and objectives are realized

Manage projects by:

Operate and maintain assets so that:

• Benefits/costs are optimized over their useful lives through astute and timely renovations, consolidations, or eliminations

• Services offered meet availability, reliability, security, quality, and recoverability expectations within acceptable budgets

• Retirements and replacements are effected when assets are no longer cost-justified or risk-acceptable

Page 8: 1 Implementation of Application Portfolio Management Overview July 2006.

8

Why Lifetime Management of Applications is Important – Causes of Value Dissipation

As s

e t L

ife

Cyc

le V

alu

e

Phase of Investment Life CyclePotential or Expected Value

Selection Implementation Operation

100%

Lose 10 – 15%

Lose 5 – 10%

Lose 20 – 25%

Actual Value Realized

50-65%

• Lack of strategic business plan

• Not strategically aligned with business goals and objectives

• Business cases deficient in tenuous benefits, overly optimistic costs, too ambitious schedules, unrealistic staffing, optimistic risk assessments, and/or unachievable benefits/returns

• Poor architecture fit

• Inadequate investment evaluation, ranking, and selection processes (pick wrong investments)

• Lacking executive support• Weak project manager• Deficient project planning, monitoring, and reporting• Insufficient or inadequate requirements definition; contracting; and management of risks, vendors, testing, training, scope, quality, change, data conversion, communications, etc.• Failure to reengineer business processes• Over-customizing COTS packages• No or inadequate post implementation assessments (PIAs)

•Lacking service management best practice framework (e.g., ITIL) and not implementing associated good processes• Inadequate asset management best practices – current and complete inventories; periodic assessments; management plans for useful lives; and business cases for renovations, replacements, or retirements • Assets are not cost justified or risk acceptable, but are not being remodeled, retired, consolidated, or replaced

Adopted from PMO Executive Council Research

Page 9: 1 Implementation of Application Portfolio Management Overview July 2006.

9

Processes andInformation

Business

Data and Work Tools

Applications

Technical Infrastructure

Drives

Prescribe

Enabled by

Supported by

Business / IT Alignment

Definition of an Application – Business / IT Alignment View

Applications are inventoried, analyzed, and reported in the applications portfolio management system

Infrastructure assets are inventoried, analyzed, and reported in the asset management system

Some of the criteria used to evaluate applications

Page 10: 1 Implementation of Application Portfolio Management Overview July 2006.

10

NC is not Alone in Implementing APM - Gartner Prediction for 2006

Gartner predicts that 40% of large public and private enterprises will implement application portfolio management in the next two years. The reason for the rapid growth in the use of APM is other companies and government entities have achieved successes in cost reduction, managing the complexities of hundreds of established assets, and improving budget process effectiveness.

Applications portfolio management is critical to understanding and managing the 40 percent to 80 percent of IT budgets devoted to maintaining and enhancing software. Most organizations don’t track established applications over time to ascertain return on investment (or to determine which should be disposed of), and few manage application portfolios with tools. In other words, these organizations haven’t truly associated the substantial amount of money they’re spending with what they are spending it on.

Gartner Research Note “Predicts 2006 Reacting to Application Development Challenges With Management and Automation” dated November 15, 2005

Page 11: 1 Implementation of Application Portfolio Management Overview July 2006.

11

Why the Management of Legacy Applications is Important

1. Risks – Consequences of unanticipated failures may be severe (due to operations or technical problems or inability to meet future business needs)

2. Costs – Applications require significant $ to operate, maintain, and enhance; thereby, necessitating scrutiny and justification of these expenses

3. Investment Planning – Improve accuracy, effectiveness, and timeliness of planning for replacements, renovations, and consolidations

4. Benefit/Cost optimization – Limited fiscal resources must be allocated to the assets and investments offering the most benefits and value.

5. Fiscal liability – Funding bodies must know future $ requirements to anticipate and plan for covering O&M, enhancement, and remediation costs.

6. Performance and capacity – Must be measured and monitored and appropriate actions taken to ensure applications continue to meet business needs (adaptability, availability, reliability, maintainability, scalability, etc.)

7. Disaster recovery and business continuity – Enable the development of viable plans and support recovery actions

Ongoing and long-term management of:

Page 12: 1 Implementation of Application Portfolio Management Overview July 2006.

12

Reasons for Applying APM Concepts and Disciplines to Existing Applications

1. Identify and catalogue all applications – know what you have and what they do in order to manage them.

2. Track and communicate technical and business status of applications to identify problems and take advantage of opportunities.

3. Enhance the alignment of applications with agency strategies and technical architectures to improve support of business processes.

4. Identify and eliminate or replace applications that are redundant, high-risk, low-performance, or high-cost (especially O&M).

5. Develop a multi-year management decision roadmap to optimize benefits/costs and minimize risks over application useful lives.

Page 13: 1 Implementation of Application Portfolio Management Overview July 2006.

13

Primary Goals for Managing Applications

• Identify high-risk applications (serious vulnerabilities with severe impacts) and assist in developing remediation approaches.

• Identify areas of over- and under-investments and reallocate budgets to more appropriately mitigate risks and maximize benefits.

• Achieve all possible savings through eliminations of duplications and unnecessary applications, reduce complexities of underlying infrastructure through remediation efforts (achieve better fit with state and agency technical architectures), and employ savings as a source of funds for new investments.

• Align IT with business priorities – better satisfy business strategies and evolving goals and objectives of governmental programs.

• Create a disciplined ongoing approach for the life cycle management of applications – there is not enough money to do everything, so do the right things.

Page 14: 1 Implementation of Application Portfolio Management Overview July 2006.

14

Seems to run forever, but ultimately has a finite business, economic, operational, and/or technical life

Sources of Risks

Issues Surrounding Systems ObsolescenceOver time, sustainability of applications becomes questionable due to age and

technology advances, combined with changed business needs. They no longer:a) support business goals and objectives, b) are cost-effective to operate or maintain, and/or c) are risk-acceptable by presenting too much security vulnerability and/or too

great a likelihood of failure with cataclysmic consequences.Business Issues

Impediment to the implementation of new and more cost-effective service delivery models – unable to respond to demands for new functionality or expanding user base, support business processes, or provide adequate and secure information access

Becomes a constraint in meeting regulatory or compliance requirements

Staffing Issues - Unavailability of Skills Unavailability of staff skills or expertise to maintain Unavailability of third party vendors Dependency on individual contractors

Technology and Operational Issues Expired warranties, with no vendor support Can not handle increased usage or volumes of data Does not run anymore on available platforms Inefficient IT resource utilization Used beyond original intent, and cannot be enhanced Cannot meet security, privacy, or confidentiality requirements Are not easily recoverable for disaster recovery and business continuity System can fail, with untraceable error Inconsistent or inadequate information and data quality Not compliant with state or agency technical architectures

Page 15: 1 Implementation of Application Portfolio Management Overview July 2006.

15

Business

Technology Operational

Application Portfolio Application Portfolio Analysis PerspectivesAnalysis Perspectives

• Do we have the right capabilities in place to support business processes?

• Are they aligned with business priorities?

• Where are potential synergies?

• Are there duplications?

• Do they provide quality and timely information?

• Do they fit the desired technical architecture?

• What is the technical migration road-map?

• What risks are presented by outdated technology?

• How do we maximize overall value, especially by redirecting funds to other applications or uses offering more value?

• Can costs be optimized across the organization, especially by eliminating or renovating costly applications?

• To what extent can innovation and new applications be funded by cost savings?

• Do they cost too much to operate or maintain?

Key Concepts: Analysis PerspectivesBusiness, technology, operational, and financial perspectives are combined to determine the posture of the application, indicate the appropriate remediation strategy, and to provide recommendations for managing the application portfolio over time

General idea – action is required when an asset is not cost-effective or risk-acceptable (it is worn out, no longer technically fits, or costs to much to keep)

Technology / Operational

Financial

• Are applications sustainable?

• Are they risk-acceptable?

• Do they present security, privacy, or disaster recovery vulnerabilities?

• Do they meet availability, reliability, and maintainability requirements?

• Is there long-term staffing support?

• Do they require a supporting infrastructure that is too complex or diverse?

• Are updates current with vendor releases?

• Do they support interoperability and information exchange among applications?

• Are they scalable, extendable, and adaptable – can they accommodate change easily?

• Do they help standardize underlying infrastructure to simplify operations and reduce costs?

Page 16: 1 Implementation of Application Portfolio Management Overview July 2006.

16

Applications Portfolio Inventory and Classification

• General – ID, business owner, age, etc.• Business processes enabled/supported• Business value/criticality• User information• Functional quality

– Present business requirements– Future business growth and new business needs

• Technical quality– Architectural compliance– Operations and maintenance – support of or detriment to

• Costs– Operations– Maintenance and technical support

• Risk profile• Disaster recovery/business continuity status

Key Attributes for Each Application

Attributes can be unlimited – use potential for compelling analyses (usefulness) and ability for consistent refresh as decision criteria for the selection of them.

Page 17: 1 Implementation of Application Portfolio Management Overview July 2006.

17

Applications Portfolio Inventory and ClassificationWho Knows About Particular Attributes:•Public Users (State’s Citizens and Businesses)•Users From Other Government Entities•Business Users•Managers and Executives•IT Managers•Technical Architects•Application Developers•Application Maintainers•IT Operations•Help Desk•Business and IT Security and DR/BC Staff•Financial, Accounting, and Budgeting Personnel

Sources of information can (and maybe should) be numerous – don’t overcomplicate, but ensure that all perspectives are offered and data is fact-based, reliable, and complete.

Page 18: 1 Implementation of Application Portfolio Management Overview July 2006.

18

Analysis of Applications Portfolio - Basics• Business leaders

– What are strategic business drivers?– Which apps fit drivers (are mission critical)? Which do not?

• Users– Which apps meet business needs? Which are lacking?– How many users are dependent on app? What are the

vulnerabilities and what are the impacts of outages.• Business analysts

– Which apps have accessible, complete, actionable, accurate, timely, and useful data? Which do not?

– Which apps enable business process reengineering? Which do not?• Applications maintenance

– Which apps require the most maintenance effort and expense? Which are scalable and adaptable? Which are not? Which are most reliable and maintainable? Which are not?

• Help desk– Which apps generate the most trouble tickets?

Page 19: 1 Implementation of Application Portfolio Management Overview July 2006.

19

Analysis of Applications Portfolio - Basics• Technical architects

– Which apps contain components that comply with agency and statewide technical architectures? Which do not?

– Which apps contain components that are beyond vendor support – aged releases and/or removal of product support?

• IT managers– Which apps have reliable and dependable vendor maintenance support

– either in-house or outsource? Which do not?– Which apps do not integrate (share data) well? How critical are the

these apps to the performance of other applications supporting critical business processes?

– Which apps have performance problems? What are the business and cost impacts of these? Can they be rectified?

– Which apps are subject to determinable vendor mergers or acquisitions? What are the consequences, and how can they be mitigated?

– Which apps have questionable risk profiles – security; DR/BCP; vendor viability; regulatory compliance; HR risk from staff retirement; privacy and confidentiality; and/or information availability, quality, and retention?

Page 20: 1 Implementation of Application Portfolio Management Overview July 2006.

20Date Modified

3/15/2006

Major ActivitiesIdentify

Dependencies on other applications andprojects

Costs/fiscal requirements Personnel resource requirements Technical infrastructure requirements Benefits/value to accrue

Applications Portfolio Management (APM) Process

Identify

Major Activities

Problems/opportunities Alternative approaches Best actions for managing applications overexpected life spans

Determine Whether To

Step 1Collect, Validate

and Maintain Data(Build and

Maintain Inventory)

Step 2Perform

Assessments(Analyze Portfolio)

Step 3Determine

Dispositions andTransition Roadmaps

(Manage Portfolio)

Step 4Determine Priorities,

Timeframes, Costs andBenefits (Optimize

Portfolio)

Iterative Steps for Analysis of Applications

Tool Assisted Decisions Subjective Business DecisionsTransition toExecutive DecisionMaking Processes

Invest additional funds Technical renovation/enhancement Functional enhancement Replace (COTS, GOTS, or custom) and

retire Sunset/eliminate Consolidate Replace and consolidate as part of anagency wide or state wide initiative

Continue maintenance

Cost-effectiveness

Risk acceptability - status of :

Current and projected O&M costs andreasonableness with industry standards

Support for current business process andenabling of future business needs

Opportunities for savings in businessprocess operations (process efficiencies)

Opportunities for citizen serviceimprovements

Opportunities for savings in systemsmanagement and operations processes

Opportunities for savings in duplications ofbusiness functions

Opportunities for savings in the use ofshared technical infrastructure andcommon technical services

Opportunities to move to target agency andstatewide technical architectures

Opportunities to standardize andconsolidate technical infrastructure

Opportunities to eliminate or consolidateapplications

Opportunities to support / improve DR/BCP

Consider

Technology / Operations risks Business risks Continuing funding risks DR/BCP risks Regulatory compliance risks Security, privacy, and/or confidentiality risks

InvestmentPortfolio

Management(IPM) Process

IdentifyMajor Activities

Business problems/issues

Relations to and support of business processes Support of key business or political drivers Criticalities to agency missions and business goals

and objectives Key users and importance to them Resident business knowledge Enable/support regulatory compliance Dependences on and support for other applications Business continuity preparedness Gaps in business support - current and future

Technical problems/issues

H/W and S/W vendor support Resident technical knowledge Warranty expirations Availability, reliability, and maintainability Obsolete or dated technology Information availability and data quality/integrity Usability Enterprise architecture fit Adequacy of supporting technical infrastructure Use of shared technical infrastructure and/or common

technical services Security, privacy, and confidentiality Recoverability from disasters/failures (DR status)

Risk vulnerabilities, probabilities, and impacts Funding dependability and reliability Technical / Operational Business DR/BCP

Other problems/issues Cost performance (excessive costs and areas for

potential savings) Duplications of business functions among applications

Evaluate Status/Health (Good, Bad, Moderate)

Business Technical / Operational DR/BCP Funding

Value (High, Moderate, Low) Strategic for agency mission or governmental initiative Essential for business criticality or regulatory compliance Enterprise architecture fit

Risk of unrecoverable failure (High, Medium, Low)

Select priority for action (High, Medium, Low)Determine Priorities and Timeframes

Risks to be avoided/mitigated Strategic value Criticality to operations Savings generated Other benefits/value offered Costs Funding availabilities

Transfer and validate selectedrelevant data from Keane/GartnerStudy to software support tool

Perform initial collection andvalidation of remaining data

Major ActivitiesOne-Time Work

Ongoing Work

Perform data changes andvalidations as they occur

Collect and validate data forimplementation projects transitioningto applications assets

In-house or outsource COTS, GOTS, or technical or

business enhancement Phases of work

Confirm and/or Develop Implementation approach

FundingRequests

Select timeframe for action Immediate (with in next 2 years) Near-term (between next 2 to 4 years) Long-term (after next 4 years)

Major Data Elements

ID Name and description Business and IT owners Application type Business processes

enabled Business value/criticality User information

Costs (Internal Personnel,External Personnel, Hardware,Software, Other External Costs)

Functional quality

Data quality Application business

quality Technical / Operational quality

Architecture Operational

Risk profile

Security DR/BCP Vendor viability Regulatory compliance Business and IT staffing Information Privacy and confidentiality

Potential Benefits for Selected Actions Consolidate/eliminate applications

Operational cost savings (licenses, staff, etc.) Simplify DR/BCP, security, privacy, and

confidentiality Remove deviant from agency/state technical

architecture - reduce complexity Create funds for new projects/investments from

savings Functional/technical renovation or replacement

Transition to agency/state technical architecture Operational cost savings Better availability, reliability, and maintainability Improved citizen services Improved/reengineered business processes Improved data accessibility, action ability, and

quality/integrity Improved DR/BCP, security, privacy, and

confidentiality Easier adaptability and scalability Better enable/support regulatory requirements More reliable, available, and economical vendor or

agency support Enable/support business drivers or political

initiatives

Page 21: 1 Implementation of Application Portfolio Management Overview July 2006.

21

Application Portfolio Management - Action Approaches

Tolerate:

• Evaluate costs and business, technical, and operational quality

• If low costs and/or no business, technical, and/or operational problems, may consider elimination or consolidation or continue as is

Eliminate:

• If low business value or high costs, probably doesn’t justify replacement or renovation

• Consider decommissioning or consolidation

Reengineer/Modernize or Replace:

• Consider renovation, retirement and replacement, or consolidation

Risks

Importance to the

Organization / Strategic Alignment

Maintain/Evolve:

• Evaluate costs and business, technical, and operational quality

• If provides value as is and costs reasonable, continue regular support and maintenance

High/Good Alignment

High

Low/Bad Alignment

Low

Page 22: 1 Implementation of Application Portfolio Management Overview July 2006.

22

Application Portfolio Management - Action Approaches

Eliminate:

• Evaluate risks and cost

• If high risk and/or high cost, consider elimination or consolidation

Tolerate:• Evaluate risks and cost• If low risks and low cost, continue regular support and maintenance• If high risks and/or high cost, consider remediation, elimination or consolidation

Maintain/Evolve:

• Evaluate risks and costs

• If low risks and costs, continue regular support and maintenance

Technical Architecture Fit or Operational Quality

Importance to the

Organization / Strategic Alignment

Reengineer/Modernize or Replace:• Consider renovation, consolidation, or retirement and replacement

High/Good Alignment

Good

Low/Bad Alignment

Bad

Page 23: 1 Implementation of Application Portfolio Management Overview July 2006.

23

Application Portfolio Management - Action Approaches

Tolerate:

• Evaluate risks and business, technical, and operational quality

• If low risk and/or no business, technical, and/or operational problems, may consider elimination or consolidation or continue as is

Eliminate:

• If low business value or high risks, probably doesn’t justify replacement or renovation

• Consider decommissioning or consolidation

Reengineer/Modernize or Replace:

• Consider renovation, retirement and replacement, or consolidation

Operations and Maintenance Costs

Importance to the

Organization / Strategic Alignment

Maintain/Evolve:

• Evaluate risks and business, technical, and operational quality

• If provides value as is and risks low, continue regular support and maintenance

High/Good Alignment

High

Low/Bad Alignment

Low

Page 24: 1 Implementation of Application Portfolio Management Overview July 2006.

24

Application Portfolio Management - Action Approaches

Technical Architecture Fit or Operational Quality

Importance to the

Organization / Strategic Alignment

High/Good Alignment

Good

Low/Bad Alignment

Bad

High Risk and High

Cost

Medium Risk and Medium

Cost

Low Risk and Low Cost

Maintain/Evolve:

Eliminate:

High Risk and High

Cost

Reengineer/Modernize or Replace:

Tolerate:

Low Risk and Low Cost

Risk is indicated by color of bubble: red is high, yellow is medium, and green is low

Cost is indicated by size of bubble: large is high, medium is medium, and small is low

Choice of Actions ???

Page 25: 1 Implementation of Application Portfolio Management Overview July 2006.

25

Expensive to operate or maintain None or decreasing vendor support for major components Insufficient or decreasing availability of staff support Can not enhance for new business requirements Inefficient IT resource utilization Inadequate data access and quality Vulnerable security Recoverability difficult or suspect Not compliant with state or agency tech. architectures

Cost-effective to operate and maintain Adequate vendor support for major components Adequate availability of staff support Can enhance for new business requirements Efficient IT resource utilization Adequate data access and quality Adequate security protection Resilient to human-induced or natural disasters Compliant with state and agency tech. Architectures Easily recoverable

Meets present service delivery needs Meets anticipated needs for new services,

business process reengineering initiatives, and information access

Protective of individual privacy and data confidentiality

Creates inefficient and less effective service delivery processes

Constraint on implementation of new services, expanded citizen benefits, and/or more efficient business processes

Individual privacy and data confidentialityat risk

Business Perspective

Low High

High

High Attention Zone – Both

Business and Technical Risks

Safe Zone

Warning Zone – Not Making Best Use of In-Place Technology

to Meet Business Needs

Warning Zone – High Technical

Risks

Application Portfolio Management - Determining the Posture of Applications

Technical Perspective

Safe Zone

Generic criteria are defined to assess applications from a business and technology perspective

Bad

Good

GoodBad

Page 26: 1 Implementation of Application Portfolio Management Overview July 2006.

26

Application Portfolio Management - Remediation Approaches

Replace - if possible, with Commercial or Government Package:• If low business value, probably doesn’t justify custom code renovation or replacement• Consider elimination or consolidation

No Technical Reengineering:• Re-host candidate• Functional enhancement• Tolerate or invest

Low Priority Technical Reengineering:• Low maintenance and support costs• Provides value as is• Regular support and maintenance

Technical Perspective

Business Perspective

Good Technical Reengineering Candidates:• High business value means quicker ROI• Renovation will improve support and maintenance costs

High/Good

High/Good

Low/Bad

Low/Bad

Page 27: 1 Implementation of Application Portfolio Management Overview July 2006.

27

Application Portfolio Management - Investment Selection and Prioritization

•“Very Important and At Risk/Great Urgency” are highest priority were level of risks and degree of urgency drive remediation activities

• “Very Important and Limited Risk/Less Urgent” applications are second priority compared to above due to less strategic importance and/or mission criticality

• “Less Important and At Risk/Great Urgency” applications are also second priority for remediation, but may deserve slightly higher consideration due to high risk and more pressing business urgency

• “Less Important and Limited Risk/Less Urgent” are lowest priority

Importance to the

Organization / Strategic Alignment

Low/Low High/high

High/High

Selectively

Second Priority

Risk / Business Urgency

Second Priority

First Priority

Very Important and At Risk / Great Urgency

Less Important and Limited Risk / Less Urgent

Very Important and Limited Risk / Less Urgent

Less Important and At Risk / Great Urgency

Prioritization and timeframe for action are driven by overall importance to the organization/strategic alignment of application, business urgency for remediation, and risks.

In addition prioritization is driven by:

– Specific business initiatives, programs, and/or funding streams available

– Overall risk issues, interrelationships between applications, and the general need for modernization of legacy systems

Low/Low

Page 28: 1 Implementation of Application Portfolio Management Overview July 2006.

28

Application RationalizationRationalization implies the use of logical processes, rational thought, and agreed upon principles to weed out unwanted items and effect change. The rationalization of applications portfolios involves a step-by-step process conducted on an application-by-application basis with agreed upon methodologies and criteria and within a decision-making governance model to: 1) reduce the number of applications by the consolidation of those performing similar functions and the elimination those of low value and high cost, and 2) remodel or replace those providing value but not fitting technical architectures, requiring high cost, and/or presenting exposure to unacceptable risks.

Business Value

LowBad

High

GoodArchitecture Fit and Cost-Effectiveness of Operations

High Value, Poor Architecture Fit, and High Costs – Renovate or replace

High Value, Good Architecture Fit, and Low Costs – Maintain and keep current

Low Value, Poor Architecture Fit, and High Costs – Eliminate, consolidate, or replace

Low Value, Good Architecture Fit, and Low Costs – Evaluate if really needed, consider functional enhancement

Page 29: 1 Implementation of Application Portfolio Management Overview July 2006.

29

Portfolio Management StrategyThe management of applications portfolios uses similar strategies and disciplines as those employed by financial managers. Portfolios are optimized by determining which applications receive current, lower, or increased levels of funding and which ones are targeted for renovation, consolidation, elimination, or replacement. Over time, the applications portfolios as a whole should reflect the greatest business value and closest architectural fit with the lowest costs and risks.

Business Value

LowBad

High

GoodArchitecture Fit and Cost-Effectiveness of Operations

High Value, Poor Architecture Fit, and High Costs – Renovate or replace

High Value, Good Architecture Fit, and Low Costs – Maintain and keep current

Low Value, Poor Architecture Fit, and High Costs – Eliminate, consolidate, or replace

Low Value, Good Architecture Fit, and Low Costs – Evaluate if really needed, consider functional enhancement

Page 30: 1 Implementation of Application Portfolio Management Overview July 2006.

30

APM is an Ongoing Process – Not Just a Project

• Identify expansion budget requests for:

– Long (biennial budget) session of General Assembly

– Short (2nd year of biennial budget) session of General Assembly

• Assist in the preparation of annual DR/BCPs (COOPs)

• Assist in the preparation of biennial agency IT plans

• Identify funding needs from other sources, such as federal funds

• Assist in making decisions for or documenting changes in applications due to:– New implementation projects– Additions, renovations, or

upgrades to technical infrastructure

– Renovations/modernizations to applications

• Provide answers to ad hoc questions

Examples of How APM Information Will be Used by Agencies

Page 31: 1 Implementation of Application Portfolio Management Overview July 2006.

31

Overview of IT Portfolio ManagementAgency Missions and Vision and Business Goals and Objectives

Statewide and Agency IT Plans

Application Portfolio Management

Project Portfolio Management

Investment Portfolio Management

Identify Problems and Opportunities

Funded New ProjectsManage

Portfolio

Analyze Portfolio

Optimize Portfolio

Build and Maintain Inventory

Develop Business Drivers and Business Cases

Analyze Candidate Investments

Adjust Project Portfolio

Assess Value of Projects and Portfolio

Manage Portfolio

Implement Projects

Select and Plan Investments

New or Renovated Applications

Proj

ect

Prop

osal

s for

App

licat

ions

Ren

ovat

ions

,

Ret

irem

ents

, or

Rep

lace

men

ts

Page 32: 1 Implementation of Application Portfolio Management Overview July 2006.

32

Inventory (Build and Maintain Inventory) Application identity and basic information

Financial (Analyze and Manage Portfolio) Detailed application-level costs and cost-effectiveness analyses

Assessment (Analyze and Manage Portfolio)

Risk, Operational Performance, Architectural Fit

Alignment (Optimize Portfolio) Process Inventory, contribution, function association Core Business Drivers, priorities, process

contribution

Application Portfolio Management Perspectives

Level I

(Ste

p 1

)

Level II

(S

tep

s 2

an

d 3

)

Level II

I (S

tep

s 2

an

d 3

)

Level IV

(S

tep

4)

InitialDeploymentFocus

Scope of Keane-Gartner Study

Page 33: 1 Implementation of Application Portfolio Management Overview July 2006.

33

Conclusions• Applications swallow cost, time, and management bandwidth, while

increasing risks – unless they are well managed to reduce complexity and risk and retired or consolidated in a timely fashion, the entire IT budget will be operations and DR/BCP will be unaffordable

• Creating a portfolio view of existing applications does not have to be complicated; focus on the basics and the big picture – let the software tool highlight problem areas and offer improvement opportunities for management decision making

• Benefits of APM are clear;– Investment decisions for elimination, replacement, or remediation are made in a

consistent manner considering application risks, value/importance to organization and its priorities, most effective use of personnel, and life span optimization of costs/benefits

– IT complexity is reduced; thereby, maximizing business value received while minimizing IT cost incurred

– Planning for DR/BCP is facilitated to ensure continuity of operations– Risks are managed, and stewardship for assets is facilitated