1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area GLAST Large Area Telescope: Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard Space Flight Center Subsystem Manager/Instrument Manager [email protected] [email protected]
11

1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

1GLAST LAT ACD FTF 3/17/05

GLAST Large Area Telescope:GLAST Large Area Telescope:Face to Face MeetingMarch 17, 2005AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

David J. ThompsonThomas E. JohnsonNASA Goddard Space Flight CenterSubsystem Manager/Instrument Manager

[email protected]@nasa.gov

Page 2: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

2GLAST LAT ACD FTF 3/17/05

Significant Accomplishments

All flight phototubes are complete.

Flight Electronic Chassis 4R installed on ACD.

Completed vibration and TVAC testing of Flight Electronics Chassis 2L, 1L, and 3L. 2L is ready for integration to ACD.

Upgraded to LATTE 4.7.3. Enlisted help for test software development.

Page 3: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

3GLAST LAT ACD FTF 3/17/05

Electronics Chassis Assembly and Test Plan

Base Electronics Assembly (1)Electronics Chassis (8) (4 double + 4 single)

Electronics Chassis Assembly EMI/EMC Vibration Thermal Vacuum

Qualification / Flight Spare

Complete Qualification

(completed)

Qualification

(completed)

12 cycles

(completed)

#1 Complete Not planned Complete Complete

#2 Complete Not planned Complete Complete

#3 Complete Not planned Complete Complete

#4 Complete Not planned Complete Complete

#5 Complete Not planned In progress 3/10/05 > 3/21/05

#6 Complete Not planned 3/9/05>3/23/05 Descoped

#7 3/1/05>3/16/05 Not planned 3/11/05>3/25/05 Descoped

#8 3/2/05>3/17/05 Not planned 3/11/05>3/25/05 Descoped

8X

Page 4: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

4GLAST LAT ACD FTF 3/17/05

InitialTDA/TSA I&T in B7

ACD SubsystemEfficiency

Verification test(include rotate

ACD 90 degree)(10d)

EMI/EMC Test(9d)

Pre-shipReview (PSR)

Vibration Test(5d)

Thermal Balance/Thermal-Vac

Test(20cd)

Mass Properties(2d)

Pre-EnvironmentalReview (PER)

Acoustic Test(3d)

Install & test 1st flight

Chassis ontoACD

Qual Electronics

ChassisEnvironmental

Test

1st flight chassis

Environmental Acceptance

Test (8d)

The remaining Seven Flight

Chassis Environmental

Acceptance tests (25d)

10/4 – 2/5/05 2/7 - 2/15

ACD FullFunctionalTest(6d)

Install ThermalBlanket &MMS(4d)

4/12 (TBR)

Assemble last 2 rows of

TDAs & WSF (124-130, 224-230, 324-330, 424-430)

onto TSA

ACD Integrationcomplete

2/16-3/23

3/24 – 3/30

6/10/04 – 1/28/05 2/15 – 2/22

Install & test remaining flight

Chassis ontoACD

2/28 – 3/18

3/23/053/31 – 4/94/11 – 4/12descoped4/14 – 4/19

4/20 – 4/22 4/23 – 5/12 5/13 – 5/14 5/17 5/28

Schedule Flow

Post shipCheck out

(5d)ACD RFI

ACD ship to SLAC

(5d)

5/18 – 5/23 5/24 – 5/28

Page 5: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

5GLAST LAT ACD FTF 3/17/05

Issues and Concerns

The principal issue is schedule, which drives cost.

Anything that affects our extremely aggressive schedule is a concern.

•Snow

•EGSE

•EMI

•Magnetic Shields

•Additional vibration testing

•Documentation (CMMI, test reports, data packages etc..)

Page 6: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

6GLAST LAT ACD FTF 3/17/05

EGSE – Test Stands

Recent Activities

– Crashes in long runs traced to memory leaks, mostly in third-party software. Fixed as of LATTE 4.7.3.

– We have modified ACD software to handle the new features and are running LATTE 4.7.3. ACD software development has been more time-consuming than expected (ACD issues, not related to LATTE 4.7.3).

Unfinished Work: 31 scripts needed. 28 working, 3 in development.

– The unfinished scripts are those needed to test detectors and full ACD.

– Software for handling calibration files and establishing baselines is still in development (not just scripts)

Some help from the GLAST Project and the Calorimeter

– GLAST Project has extended funding for our lead software developer, who was scheduled to move off ACD due to funding limitation.

– GLAST Project funded a short-term test conductor, freeing up time for our other test conductors to concentrate on script and calibration file development

– Byron Leas of the Calorimeter group has agreed to help with software to handle calibration files. Thanks, Neil and Byron!

Page 7: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

7GLAST LAT ACD FTF 3/17/05

EMI – Waivers and Additional Tests

•The ACD qualification chassis did not meet all the EMI/EMC requirements. Emissions are higher at some frequencies than the LAT specification, including one in the GPS band. There are no simple fixes. GLAST Project may request a re-test.

•CSCM test, which was skipped at recommendation of Goddard EMI personnel, has been replaced with CS114 test (a safer version of the same test). This test can be run in the lab.

•The principal ACD descope is to eliminate EMI testing at the full ACD level, which requires a waiver of this test requirement. The basic rationale is that we do not have a flight interface and would have to do testing with our unshielded GASU under the ACD (for cable lengths), making any test results suspect.

•CR has been submitted to the LAT. No action yet. Rebaseline savings of cost and schedule have assumed this CR is approved.

Page 8: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

8GLAST LAT ACD FTF 3/17/05

Magnetic Shielding

Phototube Cap Magnetic Shield. ACD tried to save some money by using a combination of stainless steel (154 locations) and mu-metal (40 locations) magnetic shields, based on preliminary tests that indicated this approach was practical. The stainless steel shields did not work well enough (became more magnetized over time than expected). Back-up of getting limited quantity of mu-metal shields was delayed in the Goddard shop for various reasons. An order was placed ($20K), but first shields did not arrive last week when expected. We cannot complete final integration of the light-transmitting fibers to the chassis without these shields. Schedule impact to integration. Tom Johnson spoke to the fabrication shop and they promised to deliver (overnight) the first 40 shields on March 14.

Page 9: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

9GLAST LAT ACD FTF 3/17/05

Additional Vibration Testing

- A small frequency shift has been seen during X axis vibration testing of the qual chassis and the first 4 flight chassis (shifts ranged from 7 -11% which is about 8-13 Hz) . The theory explaining this drop has been a slip/settling between the two PMT rails as they are not pinned together (and do not need to be pinned together)

-We are confident it is not a failure or major fatigue but wanted to explain the shift if possible-Analysis predicts a frequency drop of 10% if the preload on the PMT rail fasteners is removed. This is consistent with our theory and test results.- Repeated x axis vibration testing using the Qual chassis confirms that the shift is due to settling of assembly, not failure. After numerous tests (-12dB, -6dB, full level and 4 at -6dB), the frequency dropped from the initial level of 97Hz to 87Hz, with no change seen following the full level test.- This test was not part of our schedule.

Page 10: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

10GLAST LAT ACD FTF 3/17/05

CMMI

ACD is one of three projects chosen by Goddard management to participate in a NASA-Headquarters-mandated assessment of “Capability Maturity Model Integration” system (CMMI). CMMI is described as covering more topics than ISO. Michael Amato (Systems Engineer) and Lorna Londot (Configuration Management lead) were in CMMI training and workshops for four days last week. Tom Johnson was tied up for a day. Many members of the ACD team are preparing for extensive interviews and reviews of documentation, to be held next week.

These are the same people who should be working on all the documentation (including the Acceptance Data Package) we need for upcoming reviews. Needless to say, the ACD schedule will take a hit.

Page 11: 1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J.

11GLAST LAT ACD FTF 3/17/05

Other Issues

- IDD sheet with harness brackets LAT had requested we add reveal a possible conflict with a blanket ground plate we need to add to the BEA covers.

-Sent LAT a drawing for them define any interferences so we can modify or move plate (or harness) if possible