1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE
17

1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

Dec 22, 2015

Download

Documents

Aubrey Gibson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

1

FUTURE EXPLOITATION OF THE EAST AREAInfrastructure and Equipment - Civil Engineering issues.

Jonathan Carr – GS / SE

Page 2: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

INTRODUCTION

GS / SE were asked to investigate the practical improvements that can be achieved to improve the external envelope of Building 157.

Page 3: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

Building 157 is a 112x43.5m Steel framed experimental hall on the Meyrin site which is conected to Buildings 156 and 263.

Building 157 is accessed from the north by Route Crookers, from the east by Route Wu and the south by Route Newton. Building 157 is enclosed by car parking to north, east and south.

Designed and constructed between 1959 and 1963 Building 157 utilises a number of cladding systems to form its external envelope with mass concrete external walls at low level, aerated concrete and asbestos cladding panels together with ribbon glazing at higher levels.

BUILDING 157 OVERVIEW

Page 4: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

CONSTRAINTS

There are several constraints that can define what can be practically achieved.

• Asbestos.• Roof.• External cladding.• Insulation panels.

• Adjacency of near by buildings.• Services and external structures affixed to the external envelope.• Building cannot be completely emptied.• Closure of car park during construction phase.• Budget.

Page 5: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

PROPOSAL – A: Complete external envelope replacement.

• Complete removal of existing roof covering and cladding and installation of new roof covering and cladding system.

• This proposal requires large scale Asbestos removal.

Page 6: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• Approximate budget required circa 4m CHF (± 30%) excluding:• Asbestos removal.• Scaffolding.• Immediate Health and Safety issues approximate 200k CHF.

• Replacement of two gallery floors.• Localised asbestos removal.

Page 7: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

Asbestos removal at Building 185.

Asbestos removal cost in the region of 250k CHF

Page 8: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

PROPOSAL – B: Remedial works.

• Improve air and weather tightness of building by correcting defects in the external envelope. In short repair and or replace defective materials, fill holes and cracks, re-seal junctions and joints.

Page 9: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• MAIN ROOF

• Existing roof covering and insulation to remain.

• Junctions and joints re-sealed.• Junctions with other external

envelope elements to be sealed.

Page 10: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• WALLS AT HIGH LEVEL – Asbestos sheet cladding

• Existing asbestos sheet cladding to remain.

• Broken sheets replaced if possible.

• Existing joints re-sealed.• Junctions with other external

envelope elements to be sealed.

Page 11: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• WALLS AT INTERMEDIATE LEVEL – Aerated concrete panels

• Existing aerated concrete panels to remain.

• Holes and cracks filled and sealed.• Existing joints re-sealed.• Junctions with other external

envelope elements to be sealed.

Page 12: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• WALLS AT LOW LEVEL– Mass concrete

• Holes and cracks filled and sealed.• Existing joints re-sealed.• Junctions with other external

envelope elements to be sealed.

Page 13: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• SERVICE PENETRATIONS AND EXTERNAL STRUCTURES.

• Redundant service routes in the existing external envelope to be sealed.

• Junctions with external envelope to be sealed.

Page 14: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• GLAZING

• Existing glazing units could be replaced to improve thermal performance.

• Sealing of existing opening windows improved by installing new gaskets.

• Junctions with other external envelope elements to be sealed.

Page 15: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• DOORS

• Defective doors replaced with well sealed units.

• Sealing of existing doors improved by installing new gaskets.

• Junctions with external envelope to be sealed.

Page 16: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• Approximate budget required circa 1.5m CHF (± 30%) excluding:• Asbestos removal.• Scaffolding.• Immediate Health and Safety issues approximate 200k CHF.

• Replacement of two gallery floors.• Localised asbestos removal.

Page 17: 1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.

• ACTIONS REQUIRED.

• Full condition survey of external envelope.↓

• Locate air and water infiltration. ↓

• Identify methods and materials to correct defects. ↓

• Gain HSE approval of working methods and materials. ↓

• Request enterprises provide detailed estimated cost and planning of remedial works.

NOTE:

• The proposed remedial works have not been entered into GS Planning and GS resources have not been allocated.