Top Banner
1 Front End Studies- Front End Studies- International Design Study International Design Study Update Update David Neuffer FNAL February 2, 2010
15

1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

1

Front End Studies-Front End Studies-International Design StudyInternational Design Study

Update Update

David NeufferFNAL

February 2, 2010

Page 2: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

2

OutlineOutline

Front End for the Neutrino Factory/MC Concepts developed during study 2A

Concern on Vrf’ as function of Bsol

Need baseline design for IDS need baseline for engineering study

•~lower fields; medium bunch length

Other variations

Page 3: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

3

Official IDS layoutOfficial IDS layout

Page 4: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

4

Front End ReOptimizationFront End ReOptimization

Change reference B-field to 1.5T constant B to end of rotator

changing to nB =“12” example A bit longer than nB = 10 optimize with lower fields

• V’rf < 12 MV/m Will see if we can get “better”

optimum

18.9 m ~60.7 m

FE

Targ etSolenoid Drift Buncher Rotator Cooler

~33m 42m up to ~100m

m

p

π→μ

Page 5: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

5

More realistic modelsMore realistic models

For buncher & rotator replace B=1.5T with “realistic” solenoid coils (B ~1.5T) 0.5 m long, 0.25m spacing ~OK for rf feed in between

ICOOL simulation shows no change in performance (<~1%)

Next: rf smaller number of rf

frequencies• 14 ,B 16 R rf freq. OK

• 7,8 20% less Set rf power requirements

Acceptance of Mu+'s Within Atrans<0.030 m-rad & Along<0.15 m (sigma6.0, To=475.5ns, phase=25.8deg)

0

1000

2000

3000

4000

5000

6000

0 20 40 60 80 100 120 140 160 180 200 220

z (m)

Nu

mb

er

of

Mu

+'s

pe

r 1

00

k P

OT

Benchmark

Grp3RF

Grp6RF

Grp3&6RF

Grp6&3RF

Longitudinal Emittance in Study 2A-like Front End (sigma6.0, phase=25.8deg, To=475.5ns)

0.05

0.07

0.09

0.11

0.13

0.15

0.17

0.19

0.21

0.23

0.25

0 20 40 60 80 100 120 140 160 180 200 220

z (m)

Em

itta

nc

e (

m-r

ad

)

a: Tapered Solenoid

b: Drift

c: Buncher

d: Rotator

e: Match & Cool (4m)

f: Cooler (opposing solenoids)

ba c d e f

(a)

(b)

Page 6: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

6

rf requirementsrf requirements

Buncher – 13 rf frequencies 319.63, 305.56, 293.93,285.46, 278.59, 272.05,

265.80, 259.83, 254.13, 248.67, 243.44, 238.42, 233.61 (13 f)

~100MV total

Rotator – 15 rf frequencies 230.19, 226.13, 222.59, 219.48, 216.76,

214.37,212.28, 210.46,208.64, 206.90, 205.49,204.25, 203.26, 202.63,202.33 (15 f)

336MV total, 56 rf cavities

Cooler 201.25MHz –up to 75m ~750MV

•~15 MV/m, 100 rf cavities

Page 7: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

7

rf propertiesrf properties

Assume pillbox, Cu walls Q = ~58000

a=0.574m, L=0.5, f=200MHz

P0 = 1.35 MW f=200MHz, L=0.5m,

E0=10MV/m

U0 = 62J, Tfill = 63.7μs

12

00

0

2.405

2( ) (1 )arf L

ZQ

f

2 20

0 20

0.519 ( )sR E a L aP

Z

sin rf

rf

f L

ct f L

c

T

22 2 0

0 0 0.522

EU La

0ln(2.0)

fillrf

T Qf

Page 8: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

8

Buncher rf cavity requirementsBuncher rf cavity requirements

98.085

3.57.5MV/m4 (0.45m)13.11233.61

7MV/m4 (0.45m)12.16238.42

6.5MV/m4(0.45m)11.225243.44

6MV/m4 (0.45m)10.326248.67

2.257MV/m3 (0.45m)9.405254.13

6.5MV/m3 (0.45m)8.484259.83

5.7MV/m3 (0.45m)7.565265.80

5MV/m3 (0.45m)6.664272.05

6.4 MV/m2 (0.45m)5.724278.59

5.5MV/m2 (0.45m)4.803285.46

4.25 MV/m2 (0.4m) 3.336293.93

5MV/m2 (0.4m) 3.915305.56

4 MV/m1 (0.4m) 1.368319.63

Rf Power

Gradient

cavitiesTotal voltage

RF frequency

0.2

0.60.61.01.25

1.5

1.52

2.252.5

3

MW

Page 9: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

9

Rotator rf ComponentsRotator rf Components

rf frequency

# of cav.

gradient P0/cavity Peak power

230.19 3 12 MV/m 1.68 MW 2.25 MW

226.13 3 1.71 2.3

222.59 3 1.74 2.35

219.48 3 1.76 2.35

216.76 3 1.78 2.4

214.37 3 1.80 2.4

212.48 3 1.82 2.45

210.46 3 1.84 2.45

208.64 4 1.85 2.5

206.90 4 1.86 2.5

205.49 4 1.88 2.5

204.25 5 1.90 2.55

203.26 5 1.91 2.55

202.63 5 1.92 2.55

202.33 5 1.92 2.55

Page 10: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

10

Rf Rotator/ Cooler requirementsRf Rotator/ Cooler requirements

RF Rotator 56 cavities (15 frequencies)

12 MV/m, 0.5m ~2.5MW (peak power) per cavity

Cooling System – 201.25 MHz 100 0.5m cavities (75m cooler), 15MV/m ~5MW /cavity

Page 11: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

11

Add Windows effectsAdd Windows effects

ISS had windows … 200μ Be – 7MV/m cavities

•(0.12 MeV energy loss) 395 μ Be – 10MV/m cavities

•(0.24 MeV energy loss) 750 μ Be – 12.5MV/m cavities (Rotator)

•(0.45 MeV energy loss)

MICE rf cavities 380 μ Be window design

For IDS ?? Use 200 μ Be for Buncher Use 400 μ Be for Rotator

Could use Be-grid or “open-cell” ?

Page 12: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

12

Windows EffectsWindows Effects

Added 0.4mm Be windows in Rotator ~0.24 MeV energy loss/ rf cavity

• ~13.5MeV total Similar to MICE windows

Very small change in “performance” μ/p reduced by 1—2% μ/p ~0.085 Some cooling in rotator

• εt :: 0.019 0.018

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

0 20 40 60 80 100 120 140 160 180 200 220 240 260

Series1

Series2

Series3

All μ

εt <0.03 μ

εt <0.015

0

0.004

0.008

0.012

0.016

0.02

0 50 100 150 200 250

Series1

0.0

0.08

0.16

Page 13: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

13

Effect of reduced # of freq in Effect of reduced # of freq in RotatorRotator

First try at reducing number of rf freq. in new RC

Used rf frequency/cavities of the previous table 400 μ windows in Rotator

Rf phasing set by 233.5 MeV/c particle (?)

Less adapted to actual beam conditions

Somewhat shifted from previous optimization

μ/p reduced from ~0.085 to ~0.081 at z =245m ~5% worse ?

Page 14: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

14

Variation: lower gradient coolingVariation: lower gradient cooling

Reduce cooling rf to 12 MV/m From 15 to 16 MV/m

Reduce cooling LiH from 1.1/1.15 cm to 0.8/0.85 Keep same cooling lattice

Cooling/performance reduced μ/p at z=245m: 0.0850.070

εt at z=245m: 0.0710.0845

At equal cooling ~0.0790.070• z=220 ~ z= 245m

• 65m cooling;90m cooling

Page 15: 1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.

15

Plans etc.Plans etc.

Move toward “realistic” configuration add Buncher changes

Set up design for cost algorithm rf cavity design (pillbox, dielectric) rf power requirements Magnet design

Continuing front end IDS design study

• C. Rogers, G. Prior, D. Neuffer, C. Yoshikawa, K. Yonehara, Y. Alexahin, M. Popovic, Y. Torun, S. Berg, J. Gallardo, D. Stratakis …

~Biweekly phone Conference Cost meeting at CERN March April at Fermilab (IDS meeting)

• April 8-10 ??