1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

Dec 25, 2015

Download

Documents

Lorin Lester
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

1

FINANCIAL ANALYSIS

Page 2: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

2

GOVERNMENT vs. PRIVATE GOVERNMENT vs. PRIVATE PROJECTSPROJECTS

PROJECTS

GOVERNMENT PRIVATE

PROFITABILITY

NO OR RARELY YES

YES

SUSTAINABILITY

YES YES

Page 3: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

3

GOVERNMENT vs. PRIVATE GOVERNMENT vs. PRIVATE PROJECTSPROJECTS

GOVERNMENT PROJECTS

IS MORE FOCUS ON SERVICE

PRIVATE PROJECTS IS

MORE FOCUS ON PROFIT

Page 4: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

4

WHAT IS FINANCIAL WHAT IS FINANCIAL ANALYSIS?ANALYSIS?

Usually done after the market and technical studies

To quantify or put costings to the various inputs in the technical and market studies as basis in pursuing the project

Entails the preparation of the financial statements which are prepared, analyzed and forecasted

Page 5: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

5

•It is concerned with determining the income that the project would generate for the project-operating entity; e.g. water supply

•If there is no income, how to finance and sustain its operation e.g. FMR

WHAT IS FINANCIAL WHAT IS FINANCIAL ANALYSIS?ANALYSIS?

Page 6: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

6

•Government does not have enough money to pursue all projects.•Government can only afford only the best project proposals.•For private projects, there is a need to recover investments.

WHY THE NEED FOR FINANCIAL WHY THE NEED FOR FINANCIAL STUDY?STUDY?

Page 7: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

7

•To ensure financial sustainability

– Availability of funds to finance investment up to operation stage

– Projects with high economic returns may still fail when funds to finance its operation is not enough (water supply, irrigation and public transport)

WHY FINANCIAL STUDY FOR WHY FINANCIAL STUDY FOR GOVERNMENT PROJECT?GOVERNMENT PROJECT?

Page 8: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

8

•To determine project’s financial profitability

– Government approaches a project like a private sector does, especially when privatization is considered.

– To estimate true value of the project– To know if project is profitable or

not

WHY FINANCIAL STUDY FOR WHY FINANCIAL STUDY FOR GOVERNMENT PROJECT?GOVERNMENT PROJECT?

Page 9: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

9

• Sustainability- a project can continue to pay its bills throughout its entire life, whether these funds come from user charges or from regular budget sources.

• Profitability- a project can generate more than enough revenues to cover annual expenditures and service obligations and still post profit

PROFITABILITY AND PROFITABILITY AND SUSTAINABILITYSUSTAINABILITY

Page 10: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

10

•Revenues and cost items

•Sources of financing

•Financial viability

IMPORTANT VARIABLES IN IMPORTANT VARIABLES IN FINANCIAL ANALYSISFINANCIAL ANALYSIS

Page 11: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

11

1. Cash Flow Statement;

2. Income or Profit and Loss Statement;

3. Balance Sheet Statement.

FINANCIAL STATEMENTSFINANCIAL STATEMENTS

Page 12: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

12

Profile of project’s receipts and expenditures overtime

Shows the expected annual movement of cash into (receipts) or out (expenditures) of the project

1. CASH FLOW 1. CASH FLOW STATEMENTSTATEMENT

Page 13: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

13

1.Cash inflows- detail the expected financial receipts generated by the projects

TWO MAJOR SECTIONSTWO MAJOR SECTIONS

2.Cash outflows- shows the expected financial expenditures to be incurred to generate the cash inflows of the project.

Page 14: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

14

NET CASHFLOW

= Cash inflows

Cash outflows-

Page 15: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

15

Page 16: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

16

0 21 3 54 6 87 9 10 11 1312 14 1615 17 1918 20 21

(+)

(-)

RECEIPTSLESS

EXPENDITURES

Initial Investment Period

Operating Stage

YEAR OF PROJECT LIFE

Different Financial Project Different Financial Project ProfilesProfiles

Cessation Stage

Page 17: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

17

A. Formulation of an Investment Plan

B. Formulation of an Operating Plan

C. Formulation of End of Project Operations Plan

STEPS IN CASH FLOW STEPS IN CASH FLOW STATEMENTSTATEMENT

Page 18: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

18

Combines information from the market and technical analysis to establish a detailed plan for annual incremental expected capital expenditures during project’s investment phase:

LandBuildingsMachineryEquipmentBuilding materials and constructionManagement labor

A. FORMULATION OF AN A. FORMULATION OF AN INVESTMENT PLANINVESTMENT PLAN

Page 19: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

19

2 sections of the Investment Plan

a.Expenditure on new acquisition of assets (e.g. equipment)

b.Financing aspect of Proposed Investment

A. FORMULATION OF AN A. FORMULATION OF AN INVESTMENT PLANINVESTMENT PLAN

Page 20: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

20

Page 21: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

21

AMORTIZATIONAMORTIZATION

Page 22: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

22

AMORTIZATIONAMORTIZATION

Loan Balance – Rate (R)

Amortization-Interest

Previous Loan Balance- Principal

Page 23: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

23

AMORTIZATIONAMORTIZATION

Page 24: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

24

B. DEVELOPMENT OF AN B. DEVELOPMENT OF AN OPERATING PLANOPERATING PLAN

Combines information from the market and technical analysis to establish a detailed plan for the project’s operating phase

Provides projection of expected sales revenues and expected operating costs (i.e. operating material inputs and operating labor) for each year during the operations phase;

Page 25: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

25

To determine the flow of cash in the operation of the project.

The plans include all cash receipts generated from the operations of the business/project and all operating expenditures.

B. DEVELOPMENT OF AN B. DEVELOPMENT OF AN OPERATING PLANOPERATING PLAN

Page 26: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

26

Page 27: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

27

It shows the financial operation of a project for a given period. Various items of expected revenues/income and expenses are determined thereby permitting calculation of the project’s or firm’s net profit on a periodic basis

2. INCOME OR PROFIT 2. INCOME OR PROFIT AND LOSS STATEMENTAND LOSS STATEMENT

Page 28: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

28

1. Income/Revenue

total sales/receipts (cash and credit basis) earned in a given period For sales of goods (e.g. commodity products), the cost of the goods should be deducted from the gross sales to get the net sales.

2. INCOME OR PROFIT 2. INCOME OR PROFIT AND LOSS STATEMENTAND LOSS STATEMENT

Page 29: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

29

2. Expenses

total expenses (cash and credit) incurred during the year

Profit - the excess of revenues over expenses Loss - the excess of expenses over revenues

2. INCOME OR PROFIT 2. INCOME OR PROFIT AND LOSS STATEMENTAND LOSS STATEMENT

Page 30: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

30

Page 31: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

38

It is not correct to simply add the total annual net revenues from year 1 to year 20 to get the total returns from project.

Money that is worth a peso today is less than a peso in the future

A. DISCOUNTING AND A. DISCOUNTING AND ALTERNATIVE INVESTMENT ALTERNATIVE INVESTMENT

CRITERIACRITERIA

Page 32: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

39

The essence of this concept is that money received or consumed at a particular time has greater value than the same money received or consumed at some future time.

Time Value of MoneyTime Value of Money

Page 33: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

40

•Normal preference for present versus future consumption

•Resources on hand may be invested during the intervening period to generate income or earn interest

•Risk of uncertainty factor of the future

Explanations / ReasonsExplanations / Reasons

Page 34: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

41

•Allows comparison of revenues/costs occurring in different time periods in the future, at the initial year of the project.

•It is a process of translating future values into their present worth

What is discounting?What is discounting?

Page 35: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

42

•The nature of a project is such that benefits and costs occur at different points in time

•A given sum of money now is considered more valuable than the same amount received in a future period.

Why discounting is done?Why discounting is done?

Page 36: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

43

Ao = An x 1/(1+r)n

where: Ao = present value of An

An = expected amount at year n r = discount rate n = no. of years between year 0 and year n, i.e., discounting period

Concept of DiscountingConcept of Discounting

Page 37: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

44

The discount rate could be the weighted

average cost of capital (WACC) or the prevailing

market interest rate

THE DISCOUNT RATETHE DISCOUNT RATE

Page 38: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

45

• Usually used for most public sector projects since these projects have multiple sources of financing, which have varying interest rates.

• Cost of borrowing, for borrowed capital (i.e., interest rate of loan)

• The yield of alternative opportunities, for equity capital (i.e., interest rate of savings, other investments)

Weighted average Weighted average cost of capital (WACC)cost of capital (WACC)

Page 39: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

46

Example:Total project cost P100,000Fund 1: (Loan-60%) 60,000Cost of capital (10%)Fund 2: (Equity-40%) 40,000Cost of capital (5%)

WACC = (60%x10%)+(40%x5%) = (0.06)+(0.02) = 8%

Weighted average Weighted average cost of capital (WACC)cost of capital (WACC)

Page 40: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

47

Example:Total project cost P500,000Fund 1: (Loan-50%) 250,000Cost of capital (15%)Fund 2: (loan-40%) 200,000Cost of capital (18%)Fund 3: (Equity-10%) 50,000Cost of capital (10%)

WACC = (50%x15%)+(40%x18%)+(10%x10%)

= (0.075)+(0.072)+(0.01) = 15.7%

Weighted average Weighted average cost of capital (WACC)cost of capital (WACC)

Page 41: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

48

A revenue of P85 is expected 2 years from now. Assuming a discount rate (WACC) of 10 percent, the present value is:

Ao = 85 x 1/(1+0.10)2

= 85 x 1/(1.21) = 85 (0.826) = 70.2

EXAMPLE OF EXAMPLE OF DISCOUNTINGDISCOUNTING

Page 42: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

49

• Net Present Value (NPV)

• Benefit-Cost Ratio (BCR)

• Internal rate of return (FIRR)

B. MEASURES OF PROJECT B. MEASURES OF PROJECT WORTHWORTH

Page 43: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

50

The difference between the present values of project benefits and projectcosts

n n

NPV = ∑ bi /(1+r)i - ∑ ci /(1+r)i

i = 0

i=0

where bi= benefits in period i

ci= costs in period i r = discount rate n= discounting period

Net Present Value (NPV)Net Present Value (NPV)

NPV=B-C

Page 44: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

51

In case of competing projects, select the project with the highest NPV.

NPV Decision RuleNPV Decision Rule

If NPV > 0

If NPV < 0

ACCEPT PROJECT

REJECT PROJECT

Page 45: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

52

- the ratio of the present value of gross

benefits to the present value of gross costs:

n n

BCR = ∑ bi /(1+r)i / ∑ ci /(1+r)i

i=0 i=0

Benefit Cost Ratio (BCR)Benefit Cost Ratio (BCR)

BCR=B/C

Page 46: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

53

- In case of competing projects, select project with the highest BCR.

BCR Decision RuleBCR Decision Rule

If BCR > 1

If BCR < 1

ACCEPT PROJECT

REJECT PROJECT

Page 47: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

59

Compute and compare the BCR, NPV, and IRR using 15% discount factor and recommend the better

project.• Project A

Year Costs Benefits 1 1,400 700

2 100 600 3 100 500

4 100 400 5 100 300

• Project B 1 1,400 300 2 100 400 3 100 500 4 100 600 5 100 700

EXERCISESEXERCISES

Page 48: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

60

Computations: (Project A)

Year Costs Benefits DF (15%) PVc PVb

1 1400 700 0.869565 1217 6092 100 600 0.756144 76 4543 100 500 0.657516 66 3294 100 400 0.571753 57 2295 100 300 0.497177 50 149

TOTAL 1466 1769

NPV = 1769 - 1466 = P303 BCR = 1769 / 1466 = 1.21

Page 49: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

61

Year Costs Benefits DF (15%) PVc PVb

1 1400 3002 100 4003 100 5004 100 6005 100 700

TOTAL

NPV = PVb - PVc = P_____ BCR = PVb/ PVc = ____

Computations: (Project B)

Page 50: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

69

Year Costs Benefits DF (15%) PVc PVb

1 1400 300 0.870 1217 2612 100 400 0.756 76 3023 100 500 0.658 66 3294 100 600 0.572 57 3435 100 700 0.497 50 348

TOTAL 1466 1583

NPV = 1583 - 1466 = P117 BCR = 1583 / 1466 = 1.08

Year Costs Benefits DF (15%) PVc PVb

1 1400 700 0.869565 1217 6092 100 600 0.756144 76 4543 100 500 0.657516 66 3294 100 400 0.571753 57 2295 100 300 0.497177 50 149

TOTAL 1466 1769

NPV = 1769 - 1466 = P303 BCR = 1769 / 1466 = 1.21

PROJECT

A

PROJECT

B

In case of competing projects, select the project with the HIGHEST NPV and/or the HIGHEST BCR

Page 51: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

70

THEREFORE:WE RECOMMEND

PROJECT A THAN PROJECT B

Page 52: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

73

•It means testing how sensitive a project’s outcomes (cash flows, NPV, IRR) are to changes in key variable at a time.

•“What if” analysis

D. SENSITIVITY ANALYSISD. SENSITIVITY ANALYSIS

Page 53: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

74

D. SENSITIVITY ANALYSISD. SENSITIVITY ANALYSIS

GIVEN: GIVEN: WACC=5.6%WACC=5.6%

Page 54: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

75

D. SENSITIVITY ANALYSISD. SENSITIVITY ANALYSIS

GIVEN: GIVEN: WACC=5.6%WACC=5.6%

IRR

Page 55: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

77

ECONOMIC ANALYSIS

Page 56: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

78

• It is closely related to other phases of project development:

•Much of the data required in the identification and valuation of economic costs and benefits are derived from the market, technical and financial aspects of the project study.

WHAT IS ECONOMIC WHAT IS ECONOMIC ANALYSIS?ANALYSIS?

Page 57: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

79

•It is directed towards establishing the net returns that the project would generate for the economy/society as a whole.

•Determines a project’s viability in terms of its net contribution to the economic and social welfare of the country

WHAT IS ECONOMIC WHAT IS ECONOMIC ANALYSIS?ANALYSIS?

Page 58: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

80

•A method by which the net effect (whether favorable or unfavorable) of a project maybe determined.

• It can also be undertaken to rank projects in their order of importance with respect to the development goals. Its outcome is a solid basis for accepting, rejecting or modifying projects.

WHAT IS ECONOMIC WHAT IS ECONOMIC ANALYSIS?ANALYSIS?

Page 59: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

81

• Deals with the Costs and benefits from the viewpoint of the economy or the country as a whole in constant or real terms.

ECONOMIC ANALYSIS

FINANCIAL/BUDGETARY ANALYSIS • Deals with the costs and benefits

measured from the viewpoint of the person/proponent, expressed in current or nominal terms.

FINANCIAL vs. ECONOMIC FINANCIAL vs. ECONOMIC ANALYSIS?ANALYSIS?

Page 60: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

82

FINANCIAL vs. ECONOMIC FINANCIAL vs. ECONOMIC ANALYSIS?ANALYSIS?

• Financial and Economic prices of outputs and inputs are the same in an economy where there are no distortions. Distortions or market imperfections include taxes, tariffs, subsidies, market power and externalities.• These distortions and imperfections, however, exist in the real market. Economic externalities exist when economic values of inputs or outputs differ from the financial prices of inputs or outputs.

Page 61: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

83

FINANCIAL vs. ECONOMIC FINANCIAL vs. ECONOMIC ANALYSIS?ANALYSIS?

Results of the financial analysis are major inputs to economic analysis

Page 62: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

84

• Forms of Economic Evaluation– Cost-benefit analysis – it sums all costs

and benefits in monetary terms and compares them. The project with the largest net benefit yields the most benefit to society.

• Measures of Project worth– BCR– NPV– IRR

ECONOMIC EVALUATION ECONOMIC EVALUATION TECHNIQUESTECHNIQUES

Page 63: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

85

•Definition of the set of development objectives against which project feasibility is to be assessed

•Translation of development. variables into a common denominator (e.g., money indices) by which project benefits maybe measured

STEPS IN ECONOMIC STEPS IN ECONOMIC ANALYSISANALYSIS

Page 64: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

86

• Identification and (where possible) valuation of project costs and benefits

•Comparison of costs and benefits•Recommendation on the selection

of projects, i.e., accept, reject, defer, or modify the project

STEPS IN ECONOMIC STEPS IN ECONOMIC ANALYSISANALYSIS

Page 65: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

87

•Cost– anything that affects the project’s objectives negatively

•Benefit– anything that promotes a project’s objectives

DEFINITION OF DEFINITION OF COSTS AND BENEFITSCOSTS AND BENEFITS

Page 66: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

88

•“WITH-WITHOUT” APPROACH– Identifying and evaluating cost and benefits that would arise with the proposed investment and comparing these with a situation that would have existed without the project

IDENTIFICATION OF IDENTIFICATION OF COST AND BENEFITSCOST AND BENEFITS

Page 67: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

89

• Identification of direct costs• Identification of direct benefits• Identification of externalities,

secondary benefits and intangibles

• Adjustments to inputs from financial statements

• Comparing the “with” from the “without” the project situation

IDENTIFICATION OF IDENTIFICATION OF COST AND BENEFITSCOST AND BENEFITS

Page 68: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

90

•These are activities that involve use of real resources

•The components are identified in the technical study

•TWO TYPES–Capital Costs–Operating and maintenance costs

IDENTIFYING DIRECT COSTIDENTIFYING DIRECT COST

Page 69: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

91

• Land;• Detailed engineering and design

• Equipment, raw materials and supplies for construction;

• Building and auxiliary installation;

• Organization costs• Contingencies

CAPITAL COSTSCAPITAL COSTS

Page 70: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

92

•Raw materials and other supplies,

•Energy and fuel;•Labor,•Rent

OPERATING AND OPERATING AND MAINTENANCE COSTSMAINTENANCE COSTS

Page 71: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

93

Benefits directly attributed to the project• Examples:

– Irrigation Project: Increase in agricultural production

– Flood Control: Reduction in flood damage; improved health

– Health Projects: Decrease in mortality rate; better preventive healthcare

– Farm-to-Market Road: Reduction in vehicle operating costs; increased economic activities

DIRECT BENEFITSDIRECT BENEFITS

Page 72: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

94

Effects of the project that do not impose costs or confer benefits within the confines of the project itself.

•Examples:– Airport Construction: noise pollution– Reforestation in upstream land area:

Less flooding for people living downstream

EXTERNALITIESEXTERNALITIES

Page 73: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

95

•Secondary benefits – beneficial effects which are linked to project users either forward or backward linkages

• Intangibles – increased comfort and convenience

SECONDARY BENEFITS SECONDARY BENEFITS AND INTANGIBLESAND INTANGIBLES

Page 74: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

96

• Environmental externality (pollution, congestion)

• Monopoly externality• Tax and subsidy (excluded)• Foreign exchange externality

(demand-and-supply of forex)

• Labor externality (divergence betweenmarket wage rate (minimum wage) and cost of employment)

ECONOMIC SITUATIONS WHERE ECONOMIC SITUATIONS WHERE AN ECONOMIC EXTERNALITY MAY AN ECONOMIC EXTERNALITY MAY

ARISEARISE

Page 75: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

97

•Foreign exchange – 1.20•Labor – 0.60•Tax and subsidy – excluded from economic costs

SHADOW PRICESSHADOW PRICES

Page 76: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

98

•Also known as social discount rate (SDR) which is 15 % (used in the computation of NPV, BCR, IRR)

OPPORTUNITY COST OF OPPORTUNITY COST OF CAPITALCAPITAL

Page 77: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

99

Year Total Cost

Economic Water

Revenue1

Reduction in

Mortality2

Reduction in

Morbidity3

Savings in

Medical Expenses

4

Time Saving

s5

Total Benefit

s

Incre-menta

l Bene-

fits

1

2

3

4

5

Notes:1/ (Served popn/average hh size) X Water fee per hh x 12 months2/ (Served popn X mortality rate X LFPR X Annual Wage x 60%) 3/ (Served popn X morbidity rate X LFPR X Daily Wage Rate X days inactive X 60%)4/ (Served popn X morbidity rate x LFPR X Medical Expense x 60%)5/ (Served popn/average hh size) X LFPR X (Hours fetching water w/o proj – Hours fetching water with proj) X Wage rate per hour

Water Supply System

ECONOMIC COST AND BENEFIT ECONOMIC COST AND BENEFIT FLOWSFLOWS

Page 78: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

100

Year

(1)

Invest-ment Cost(2)

O&M Cost WIP(3)

Total Outflow (4)=2+3

Vehicle Operating Costs O&M Cost WOP(9)

Total Inflo

w(10)

Net Inflo

w(11)

WOP Volume Savings

Generated Benefits

Freight

(5)

Passengers

(6)

Freight

(7)

Passengers(8)

1

2

3

4

5

2/ Inv cost = ave eco road cost X road length X % of Total Project Cost disbursed3/ O&M WIP=annual eco maint cost WIP X road length 5/ VOC WOP Vol Savings Frt = total Frt WOP X VOC savings for Frt X ave journey length X 365 days6/ VOC WOP Vol Savings Pax = Total Pax X VOC savings for Pax X ave journey length X 365 days 7/ VOC Gen Benefits Frt = (Total Frt WIP-Total Frt WOP) X VOC savings for Frt X ave journey length X 365 days X 50%8/ VOC Gen Benefits Pax = (Total Pax WIP-Total Pax WOP) X VOC savings for Pax X ave journey length X 365 days X 50%9/ O&M Cost WOP = annual econ maint cost WOP X road length 10/ Total Inflow = 5 + 6 + 7 + 8 + 911/ Net Inflow = 10 - 4

Rural Road Project

ECONOMIC COST AND BENEFIT ECONOMIC COST AND BENEFIT FLOWSFLOWS

Page 79: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

101

WATER WATER SUPPLY SUPPLY PROJECTPROJECT

Page 80: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

102

SAMPLE PARAMETERSSAMPLE PARAMETERS

Page 81: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

103

SAMPLE PARAMETERSSAMPLE PARAMETERS

Page 82: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

104

SAMPLE PARAMETERSSAMPLE PARAMETERS

Page 83: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

105

FINANCIAL ANALYSISFINANCIAL ANALYSIS

Page 84: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

106

FINANCIAL ANALYSISFINANCIAL ANALYSIS

Page 85: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

107

ECONOMIC ANALYSISECONOMIC ANALYSIS

Page 86: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

108

Page 87: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

109

Page 88: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

110

Page 89: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

111

Page 90: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

112

Page 91: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

113

Page 92: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

114

Page 93: 1 FINANCIAL ANALYSIS. 2 GOVERNMENT vs. PRIVATE PROJECTS PROJECTS GOVERNMENTPRIVATE PROFITABILITYNO OR RARELY YES YES SUSTAINABILITYYES.

115