1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

Mar 27, 2015

Download

Documents

Morgan Casey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 1

Nepal Red Cross Society-DRR-CBA

By Krishna Kumar K.C.DRR Project Coordinator

Page 2: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 2

Nepal Red Cross Society (NRCS) came into being 1963

The Government of Nepal Acceded Geneva Convention

1964

Recognized by International Committee of the Red Cross (ICRC)

1964

Affiliated to the International Federation of the Red Cross and Red Crescent Societies (IFRC)

1964

Page 3: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 3

District Chapters 75

Sub-chapters 1,201

Junior Red Cross Circles 4,006

Youth Red Cross Circles 482

Total Membership 1,100,646

Page 4: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 4

Promotion of the RC Fundamental Principles and Humanitarian Values

Disaster Management- Disaster Response - rescue & relief, rehabilitation, reconstruction, assistance to the victims of conflict , tracing, emergency first aid

Disaster Preparedness - CBDP, community/school based DRR, warehouse management, logistics & network development, HR development

Health and Care in the Community Organizational Development

Page 5: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 5

NRCS CBDP/DRR Initiatives

NRCS has been engaged formally in Community Based Disaster Preparedness Program since 1997.

Coverage so far more than 700 communities/schools in more than 45 districts.

The DRR II BRCS / DFID - supported and Federation coordinated DRR II program designed in 2005-2008 and supported the Hyogo framework for Action (HFA) and had drawn on NRCS lessons learned.

Approximately 9,000 people in 15 vulnerable communities selected as a result of VCA in the disaster prone districts of Ilam, Panchthar and Saptari were benefited from DRR II

NRCS DRR II program was examined through the Cost Benefit Analysis (CBA) with the support of BRCS.

Page 6: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.
Page 7: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 7

Cost Benefit Analysis on NRCS DRR Program

BRCS-Why CBA? Contribution to the efforts of the Movement in

adopting and promoting the Disaster Risk Reduction approach

To improve the measuring of impact -- to better capture monetary terms.

CBA could advance the case for scaling up risk reduction activity and validate the investment benefits.

Page 8: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 8

NRCS –Why CBA? Useful as another tool for strengthening M&E

for measuring impact. Results are useful to help motivate and

mobilise communities. Useful for understanding more about DRR

benefits and to influence future interventions.

Cost Benefit Analysis on NRCS DRR Program

Page 9: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 9

To produce analytical evidence of the micro-level benefits (versus the costs) of Community based DRR

For the NRCS,BRCS and International Federation of Red Cross and Red Crescent Societies (IFRC) to learn about and to develop skills around the CBA methodology

Cost Benefit Analysis on NRCS DRR Program

Page 10: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 10

CBA work investigated the impacts of the program undertaken in Ilam, Nepal

The CBA work evaluated the following components:Structural activities-(mitigation works such as building gabion boxes, construction of flood containing walls and evacuation shelters). Indigenous practices were also promoted at local level.Non-structural activities-(Such as emergency (revolving) funds, first aid training, drafting of disaster preparedness plan, public awareness campaigns)Livelihood activities- Income generation (IG) activities such as buying and rearing livestock for sale in the market, and generated significant amounts of income for a number of families.

Page 11: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 11

Process of Cost Benefit Analysis

Field work and data collection and verificationMeeting and discussion with NRCS management and DM team and other relevant stakeholders

The field work was used to gather data on The risks faced by communities,The impacts of natural hazards on the communities,The affect of the NRCS DRR program in reducing the impact of these risks.

Page 12: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 12

Field work aimed to gather more detailed data to construct two scenarios:

What is the impact of hazards on the community without the DRR Program?

What is the impact of hazards on the community with the DRR program?

Data was collected through-Meeting with NRCS DM team, District Chapters, field staff and community volunteers, Field visit and stakeholders meetings.

Process of Cost Benefit Analysis

Page 13: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 13

The findings from the cost benefit analysis demonstrated that the program generated a cost to benefit ratio of 1:15 on conservative assumptions.

The impacts of the hazards and the DRR program, as described by the community, are out lined below in relation to the Sustainable Livelihood Framework.

Findings of Cost Benefit Analysis

Page 14: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 14

Findings of Cost Benefit Analysis

NaturalWithout DRR: Land eroded by Flooding, soil eroded by

poor farming practices.

With DRR: Land protected, and some land reclaimed (through re-generation from gabion boxes)

Page 15: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

Some examples of NRCS DRR initiatives

Page 16: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 16

PhysicalWithout DRR: Houses swept away in big floods, displaced households move to neighbors in the short term, drinking wells submerged and water contaminated resulting in diarrhea, restricted/no access to village. Fires/elephant attacks destroy houses and contents

Findings of Cost Benefit Analysis

Page 17: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 17

With DRR: Houses may still be swept away in big flood, but mitigation works have halted gradual erosion, protecting houses from average floods. However, impacts may be diverted to the other side of river/downstream. Evacuation shelters provide temporary shelter, with stored relief items. Wells protected from contamination. Provision of rickshaw improves access. Houses still destroyed by fires/elephants attacks, but emergency fund (cash and grain) provides security for those affected.

Findings of Cost Benefit Analysis

Page 18: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 18

SocialWithout DRR: There was not strong coordination with local authorities and no strong unity within the community.

Findings of Cost Benefit Analysis

Page 19: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 19

With DRR: Improved coordination and stronger community voice, communities liaise with local authorities and other organizations for development activities, women empowered and helping other women’s groups to form, greater sense of security through emergency funds.

Findings of Cost Benefit Analysis

Page 20: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 20

Strengths of CBA

Validation of intervention: Found to be a useful tool to measure tangible and concrete impact which validates strategies and investment.

Aids fundraising and policy making: Analysis found to be persuasive fundraising tool and for influencing policy.

Page 21: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

Some examples of NRCS DRR initiatives

Page 22: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 22

Limitations and weakness of CBA

Timing: Difficult to be undertaken until after implementation and therefore difficult to use for decision making during implementation.

Impacts measured: Dominated by ‘hard’ direct or tangible measures as opposed to ‘soft’ indirect or behavioural change / capacity building measures. Findings may be skewed in importance if used in isolation.

Page 23: 1 February 2014 1 Nepal Red Cross Society-DRR-CBA By Krishna Kumar K.C. DRR Project Coordinator.

April 10, 2023 23

Conclusions

CBA provides a key tool to aid decision-making by allowing robust analysis of the costs and benefits of different interventions.

CBA can be strongly influential to make the case and advocate for DRR interventions to improve human wellbeing.

The findings from the cost benefit analysis demonstrate that the program generates a cost to benefit ratio of 1:15.