1. CPPA was created by Government of Pakistan under Restructuring of Power Sector, in 1992. 2. Working as an agent of NTDC, CPPA is mandated to buy each unit of generated electricity for DISCOs. 3. It is a seller of electrical energy to whole sale purchasers i.e. DISCOs and Bulk Power Consumers including KESC. 4. CPPA is an entity with Zero Asset and Zero Liability; it manages its business through wheeling charges. CPPA Important Facts CPPA 1
21
Embed
1. CPPA was created by Government of Pakistan under Restructuring of Power Sector, in 1992. 2. Working as an agent of NTDC, CPPA is mandated to buy each.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1. CPPA was created by Government of Pakistan under Restructuring of Power Sector, in 1992.
2. Working as an agent of NTDC, CPPA is mandated to buy each unit of generated electricity for DISCOs.
3. It is a seller of electrical energy to whole sale purchasers i.e. DISCOs and Bulk Power Consumers including KESC.
4. CPPA is an entity with Zero Asset and Zero Liability; it manages its business through wheeling charges.
CPPA Important Facts
CPPA1
Managing Director
Chief Engineer Settlement
Central Power Purchasing Agency (CPPA) CPPA2
CPPA Existing Organizational Structure
Staff Officer Technical
Director GeneralIT
Chief Operating Officer/General Manage.0r
D.M (5)A.M (5)
Manager Tech(3)
Manager Tech(2)
D.M (4)A.M (4)
Manager IT(2)
Manager(4)
D.M (4)A.M (4)
D.M (7)A.M (13)
D.M (2)A.M (2)
Manager L&CA(4)
Chief Engineer Procurement
Deputy G. M.Finance
Manager HR&A(4)
Pakistan has the immense potential to emerge,
sustain and be acknowledged as the best
electric power market, in South Asia, facilitating
win-win-win situation for investors,
customers as well as utility professionals.
Vision
3 CPPA
We undertake to procure each
unit of electricity produced from
different sources and to sell it to
DISCOs and bulk consumers to
offset the prevailing demand-
supply contrast.
Mission
4 CPPA
Strategic Goal
Central Power Purchasing Agency5
CPPA to be acknowledged as a
trusted, professional and efficient
agency owing to its internationally
accepted working procedures, non-
discriminatory and transparent
business operations, and excellent
performance standards.
5 CPPA
1. Ensure verification of invoices from generators (IPPs, GENCOs and WAPDA Hydel plants)
2. Execute settlement functions (Billing to DISCOs and bulk consumers including KESC under NEPRA determined mechanism)
3. Monitor functioning of different role players (Generators, NTDC and Purchasers); suggest changes in the SOPs
4. Enter into Energy Purchase Agreements with sponsors of RE projects
Objectives
CPPA6
CPPA is primarily responsible
for purchasing power from all
generators located throughout
Pakistan excluding Karachi
and selling it to all DISCOs
and bulk consumers including
KESC.
Core Responsibility
CPPA7
Hydel
Thermal
–
Furn
ace O
il
RenewableTherm
al -
Nuclear
Thermal - Natural Gas
Thermal - Coal
1. Manage networking of CDPs for collection of energy data
2. Monitor functioning of meters installed at CDPs with grid
users (GENCOs, IPPs and DISCOs)
3. Undertake corrective measures for metering systems
errors
4. Establish Operating Committees, Metering Committees and
Interconnection Committees for all IPPs
5. Reconcile and process energy data received from Metering
Committees (NTDC, IPPs & DISCOs)
6. Monitor compliance with respective PPA/EPA
CPPA’s Functions
8 CPPA
7. Setup teams to witness generators’ Commissioning
Tests and Annual Dependable Capacity Tests
8. Process and execute necessary amendments to PPAs
9. Co-ordinate with Planning Power for technical studies
10.Participate in NEPRA public hearings on multiple