Top Banner
1 OROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open Content
8

1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

Jan 11, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

1

COROT: Scientific comity Sept 15 2006

Calibrations during the commissioning and beforethe first run.

Calibrations cover closedCalibrations cover open

Content

Page 2: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

2

COROT: Scientific comity Sept 15 2006

Cover closed.

Goals.

Effect of the temperature on:The dark current.The electronic offset

Page 3: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

3

COROT: Scientific comity Sept 15 2006

Gain measurement of the 8 electronic chains.

µ = σ2 (Poisson)

gain . µgain2 . σ2

ADC:

gain = σ2 / µ

CCD:

Precision ~1%

Cover closed.

Page 4: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

4

COROT: Scientific comity Sept 15 2006

Bright pixels:

Position and intensityFunction of the integratedradiations flux

Cover closed.

Page 5: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

5

COROT: Scientific comity Sept 15 2006

Calibration of the cross-talk between: Exoplanet <-> Asteroseimology CCDAsteroseimology CCD A1<-> A2

PF channel

AS channel

Cover closed.

Page 6: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

6

COROT: Scientific comity Sept 15 2006

South Atlantic Anomaly• Verify that the shielding eliminate the electrons of the polar belts.• Protons flux measurement.• Validate the SAA limits.• Statistics on:

Intensity of the impacts.Number of pixels perturbed.Brightest pixel in an impact.

Statistic on MOST data

Cover closed.

Page 7: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

7

COROT: Scientific comity Sept 15 2006

Cover opened

Rough calibrations of the baffle efficiency.may imply a modification of the runs planning.

Page 8: 1 COROT: Scientific comity Sept 15 2006 Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.

8

COROT: Scientific comity Sept 15 2006

PSF reconstruction on the seismology channel.Resolution of 1/3 pixel. Cannot be done in the same way on the PF channel

acqu

ired

dat

apr

ojec

ted

imag

esp

line

inte

rpo

latio

n

Image with jitter

Designed tooptimize a PSFfitting on imagettes

ReconstructedImage

Cover opened