1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety
15

1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

Jan 01, 2016

Download

Documents

Brook Barrett
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

1

Cleaner Environment

CHALLENGES IN DEVELOPMENT

OF

ERDMP

MAHARASHTRA NATURAL GAS LTD, PUNE

28.09.2012

Sagar VarmaSenior Manager( Fire & safety)

Page 2: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

2

Cleaner Environment

MAHARASHTRA NATURAL GAS LIMITED (MNGL)

A Joint Venture promoted by

• GAIL (India) Limited; and

• Bharat Petroleum Corporation Limited

MAHARASHTRA NATURAL GAS LTD.

To implement

City Gas Distribution Project in

Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)

Page 3: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

3

Cleaner Environment

DAHEJBARUCH

HAZIRA

NAVSARI

VALSAD

SILVASA

APTI BUDRUK

HAJIMALANGWADI

DAHANU

VASAI

BORIVALI

TROMBAY

GHOTAW`ADE

CHINCHWADETHAL

DABHOL

PUNE

VAPI

SURAT

PANVEL

URANIIL

USARAMBEWADI

NASIK

SAFALE

GAIL’S TRANSMISSION PIPELINES

1. DAHEJ – URAN PIPELINE

2. DABHOL – PANVEL PIPELINE

3. GHOTAWADE – CHINCHWAD PIPELINE

Page 4: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

4

Cleaner Environment

DFR prepared by MECON in 2002

MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004

Date of Incorporation - 13.01.2006

Date of Commencement of Business - 24.03.2006

Authorised by PNGRB on 15.04.2009

Page 5: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

5

Cleaner Environment

City Gate Station

19 Bar Steel Network

4 Bar PE Network

Mother Station Chinchwad

DRS

GI Installation Service RegulatorDomestic Kitchen

100 mbar PE Network

21 mbar CU

Network

Page 6: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

6

Cleaner Environment

Customer Base

Domestic

4000 customers

Vehicles

24000 auto

10000 cars

530 buses

Industrial

37 nos.

Hotels/Small Commercial

13

commercial

Page 7: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

7

Cleaner Environment Major Challenge CGD companies

operate as utilities and operate in city conditions.

Our typical response to emergency is based on customer complaints.

Page 8: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

8

Cleaner Environment Major Challenge

Common regulation for midstream as well as downstream.

Page 9: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

9

Cleaner Environment

Documentation challenge

Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists.

Supports in the form of annexure included to give sense to the content

Page 10: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

10

Cleaner Environment

Documentation challenge

To include Risk analysis and

consequence mapping.

Collection of data from various departments

Page 11: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

11

Cleaner Environment challenges

Site visit and mockdrills

Three mockdrills conducted in span to 2 hours.

resource constraints. Offsite department

involvement

Page 12: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

12

Cleaner Environment Other challenges

Perception of TPI delegates

Repeated Micro level changes

Page 13: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

13

Cleaner Environment

contents

Other Challenges

Flow of document

Longtime taken for each stage of accreditation

Foreword Definitions Executive Summary 11 chapters ( covering each

and every schedule) 20 Annexures 7 Checklists

Page 14: 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

14

Cleaner Environment Benefits of the exercise Involvement lead to knowledge up gradation Various areas of safety management system

come to surface Comprehensive documentation Knowledge sharing with other CGD Tying of loose ends