Top Banner

of 14

1. Blank BoQ - Temporary Toilet Pekanbaru

Jul 06, 2018

Download

Documents

veridaus
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    1/14

    Location

    (Pla! "#" to all $o"%! #ollo$i

    NO

    T,-o"a". Toilt Con!t"/ctio

    1

    a.

    b. Plastering wor

    c.

    d.

    e.

    f.

    g.

    Supply and ins

    h.

    2

    Supply and install wall

    a.

    b. Supply and ins

    menyediakan

    'oo" In!tallation Woa.

    S+T S-01 Site sur%ey shcontractor.

    Floo" Wo"%! 3 Pekerj

    (ricks work +ns

    )ompacted Sa

    )oncrete Floor

    Floor Tile instal

    S8uatting Toile

    Floor Drain / $l

    Supply and indrainase di are

    Toilt! Wall In!tallati

    &enyediakan dan me

    dengan ketebalan 0)*Roo#in& In!tallation

    Supply and inscorrugated &in

    &enyediakan penutup atap

    Supply and insand joining

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    2/14

    Location

    (Pla! "#" to all $o"%! #ollo$i

    NO

    b. Supply and ins

    &enyediakan

    4

    Supply and install wall

    6 Paintin& $o"%!

    Supply paint material

    3enyediakan material

    5

    a. )able

    Supply and ins

    b. 6ight bulb

    : Supply and ins

    c.

    Supply and ins

    a.

    Supply and ins

    b.

    c.

    Supply and ins

    &enyediakanyang dibutu'k

    Wall 7o")" In!tallat

    &enyediakan dan medengan ketebalan 0)*

    Elct"ical In!tallatio

    6amp Switch /

    Pi-lin in!tallation

    )lean 7ater di

    7ater Tap / Ke

    Supply and insand all accesomerek onda 1-

    (ack 7ater Pi

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    3/14

    Location

    (Pla! "#" to all $o"%! #ollo$i

    NO

    :

    8 '"aina& in!tallation

    10

    a.

    Supply and insclean out diam

    3aking of drainage at$ >. Drainage si&e wi

    &embuat saluran drarapi) %rainase 'arus

    Acc!!o"i! in!tallti

    7ater bucket /

    Supply water b

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    4/14

    Location

    (Pla! "#" to all $o"%! #ollo$i

    NO

    b.

    c.

    @ote 1

    Transportation of all material

    atatan7

    +emua 'arga pengangkutan

    7ater Dipper /

    Supply water b

    )loth hanger in

    +upply and ins

    "'e estimated scope of (ort'e specified period of const

    Received by:IOM Sta 

    Nama :Position

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    5/14

    REQUEST FOR QUOTATIONTEMPORARY TOILET CONTRCUTION WORKS

    APRIL 2016

    I'C PEKAN7ARU

    & '!i&n '"a$in& attac)*

    ACTI+ITIES UN

    n Wo"%!

    s / Pekarjaan plaster 

    -

    all Floor Drain, the material from Stainlees stell

    6

    for Toilet, the frame is made from ollow bar !"#!"#$ mm and wall co%er from corrugated &inc thickness ".' mm

    all Fascia (oard at front of toilet roofing, the material is made from )alciboard Thickness *mm

    an memasang Listplank di bagian depan atap toilet, material terbuat dari Kalsiboard 6 mm

    %!

    all be performed prior to the start of any appointed sites and thereby pre determines the possibility of change order o

    aan Lantai 

    allation for floor frame works/Pekerjaan pemasangan batu bata untuk frame lantai  m

    m

    nd mi# with gra%el, thickness 45 cm / 6apisan sirtu yang dipadatkan ketebalan 15 cm m

    / Beton Lantai  m

    ation 7orks si&e $"#$" cm/Pekerjaan Pemasangan Keramik Lantai 20!0 cm m

    +nstallation 7orks / Pekerjaan pemasangan "oilet #ongkok 

    oor %rain Lantai 3

    tal drainage grill co%er at toilet compound entrance si&e1 445 # $5 cm /  &enyediakan dan memasang penutupa masuk toilet ukuran 115 cm 25 cm

    on Wo"%! 3 Pekerjaan Dinding Kamar Mandi

    mmasang dinding untuk toilet, rangka terbuat dari besi 'ollo( !0!02 mm dan seng gelombang sebagai penutup

    mmo"%! 3 Pekerjaan Pemasangan Atap

    all the roofing material for Toilet, the roofing structure is made from ollow bar !"#$"#$ mm and co%ered with hotThickness ".' mm

    man memasang material atap untuk toilet) +truktur atap terbuat dari besi 'ollo( !0202 mm dengan ba'an

    ari seng gelombang ketebalan 0)* mm

    m

    all corrugated &inc Door 9 Door Frame, the cost to include Door hinge, door lock, latch and all material for fi#ing

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    6/14

    REQUEST FOR QUOTATIONTEMPORARY TOILET CONTRCUTION WORKS

    APRIL 2016

    I'C PEKAN7ARU

    & '!i&n '"a$in& attac)*

    ACTI+ITIES UN

    -

    all aluminium angle plate si&e $ # $ cm at the door and door opening to co%er the end sharp of the metal &inc

    an memasang plat siku aluminium pada pintu dan area bukan pintu untuk menutup ujung seng

    for Toilet, the frame is made from ollow bar 5"#5"#$ mm and wall co%er from corrugated &inc thickness ".' mm

    and paint all the hollow metal frame toilets and fence, colour white.

    6cat dan cat semua struktur rangka toilet dan pagarnya

    all lectrical cable for lighting, cable Supreme $ # 4.5 mm

    Pcall light bulb Philip ;enie 44 watt. To include cost for fitting lamp and other installation accessories

    Pcall lamp switch double.

    all pipeline installation works, materials is ;al%anis dia 4 inc. to include cost for accessories installation.

    -

    all P) Pipe dia ! +nch, to include cost for accessories installation

    an memasang pintu seng gelombang dan rangkanya, 'arga termasuk engsel, kunci, pacok dan semua materialn untuk pemasangan dan penyambungan)

    m

    on Wo"%! 3 Pekerjaan Pemasangan Pagar batas toilet 

    mmasang dinding untuk toilet, rangka terbuat dari besi 'ollo( 50502 mm dan seng gelombang sebagai penutupmm

    Wo"%! 3 Pekerjaan Pemasangan instalasi Listrik 

    3

    +(itc' Lampu

    $o"%! 3 Pepasangan Pemipaan

    stribution pipe / Pekerjaan Pemasangan Pipa air bersi'

    3

    ran ir 

    all 7ater Tap 4/$ inc. 3aterial is bron&e

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    7/14

    REQUEST FOR QUOTATIONTEMPORARY TOILET CONTRCUTION WORKS

    APRIL 2016

    I'C PEKAN7ARU

    & '!i&n '"a$in& attac)*

    ACTI+ITIES UN

    -

    $o"%! 3 P%"9aan P,:/atan )"aina!

    all clean out P) pipe diameter ! inch, including Tee, )ab and accessories / &enyediakan dan memasang pipaeter 5 inc'i, termasuk "ee, %op dan asesorisnya

    the front and side of toilet as per design drawing. The drainage surface is plastered and tidy, The slope minimumth 45 cm

    mnase dari pasangan bata di depan dan samping toilets seperti gambar rencana) Permukaan drainase di plasteremiliki kemiringan minimum 2 4) Lebar besi' saluran 15 cm

    on 3 Pekerjaan Pembuatan Septic tanks

    mber ir Plastik 3

    ucket capacity ?" 6 / &enyediakan ember plastik kapasitas 0 Liter 

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    8/14

    REQUEST FOR QUOTATIONTEMPORARY TOILET CONTRCUTION WORKS

    APRIL 2016

    I'C PEKAN7ARU

    & '!i&n '"a$in& attac)*

    ACTI+ITIES UN

    -

    COUNTE' ;T/9/ P/l/ '/a

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    9/14

     

    UNIT

    PRICE (I'R*+OLUME PRICE

    ( I'R *

    $!.5! B!,"5"."" $,'"C,B?C.""

    4".*? C4,5""."" C*',*$".""

    B.5C 4"4,$""."" B*?,!?!.""

    $.'B 544,5""."" 4,$$',C*'.C5

    5?.$5 4'C,55"."" ?,"4$,$?C.5"

    !."" !4$,5""."" 4,*5",""".""

    ?."" $5,5C5."" $"!,*"".""

    4."" 5CC,5""."" 5CC,5"".""

    B"."" BC,'5"."" ?,C*4,5"".""

    $C."B BC,'5"."" $,*'C,$44.5"

    $C."" $B,BC5."" ?"B,'$5.""

    ion, shall be attended by +23 representati%e, +mmigration epresentati%e and the

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    10/14

     

    UNIT

    PRICE (I'R*+OLUME PRICE

    ( I'R *?."" $,"'5,"""."" 4*,$?",""".""

    !'.$" 45,B5"."" *?B,"!".""

    5'."! 4$C,'$5."" *,C5','4?.""

    4."" C,!$5,"""."" C,!$5,""".""

    C5."" 45,B5"."" 4,4B*,$5".""

    4$."" !B,5""."" 5B!,""".""

    4$ $!,C5"."" $BC,""".""

    !5."" 4?,45"."" ?4*,C5".""

    ?."" B*,$5"."" CC",""".""

    '5."" 4$*,5""."" !,!$C,5"".""

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    11/14

     

    UNIT

    PRICE (I'R*+OLUME PRICE

    ( I'R *

    $."" 4'C,5""."" $C5,""".""

    4?."" 4!?,5""."" $,*C',""".""

    ?."" 4C5,"""."" 4,!"",""".""

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    12/14

     

    UNIT

    PRICE (I'R*+OLUME PRICE

    ( I'R *

    ?."" 4"?,B5"."" ?C4,*"".""

    ?."" '",$5"."" $!$,""".""

    ="an) Total 52>626>5654

    Ro/n)) 52>626>00000

    ia

    to the construction site

    ue and correct and s'all not claim for etra 9uantities or price increase during

    Name of com%any: &'( Ni)ita *aya+ate: 2$ ,%ri- 2$1

    Nama : 'i)tor Mamosi Na%it.%.-. *abatan : +ire)t.r

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    13/14

    'o-.me &a-c.-ation

    No( /or)s +escri%tion Pan0ang ebar

    1Floor works

    a( ric) or)s "1(" $(3

    b( P-astered 35( $(3b( &om%acted sand and grave- 14(5 3(3

    c( &oncrete or)s 14(5 3(3

    d( -oor ti-e insta--ation 14(5 3(3

    e( S.ating toi-ets

    f( -oor drain

    g( +rainage gri-- cover

    2Toilets Wall Installation Works 3!(5 2(4

    3a. Roofng installtion 12( 2(15

    b. Fascia board

    4Door Installation worksa( +oor insta--tion or)s

    b( ,-.mini.m ang-e %-ate 4(" #

    5Wall border installtion works 22(1 2(4

    6Painting works

    !lectrical Installation Works

    a( &ab-e

    b( ig6t b.-b

    c( am% Sitc6

    "#i#eline installation

    a( &-ean ater distrib.tion %i%e

    b( /ater %i%e insta--ation

    c( -ac) ater %i%e

    d( &-ean o.t

    $Drainage installtion works 1"

    1%&ccessories installtion works

    a( 7mber

    b( 8ay.ng

    c( 8ant.ngan ba0.

  • 8/17/2019 1. Blank BoQ - Temporary Toilet Pekanbaru

    14/14

    tinggi

    24(54

    1$("$(2 #(5!

    $($5 2(3#

    5"(25

    4($$

    "($$

    1($$

    #$($$

    2!($#

    2!($$

    "($$

    43(2$

    53($4

    1($$

    !5($$

    12($$

    12($$

    5$($$

    12($$

    35($$

    2($$

    1"($$

    "($$

    "($$

    "($$