BBM
PROJECT
Maintenance Operating Standards Project & Compliance Inspection
PPM(main visit)
PPM
PPM
ANNUAL BUDGET
RR
RR
RR
CMI
CMI
RR=Reactive Repair CMI=Premises Audit PPM=Planned Preventative Maintenance (i.e. servicing & testing)
REGULAR REPORTING
THE ANNUAL CYCLE….•Event frequency is indicative only•The sequence of events may differ from site to site.FY11
ABM
POLICY & STANDARDS
= Transfer of Data
Page 2
2BMD INTERACTIVE DAISY WHEELS
PROJECT
CMI
BUDGETS
ABM INSPECTION
PPM
REACTIVE REPAIRS
REGULAR REPORTING
Page 3
3
FRA
BBM/ ABMCA
FRA
BBM/ ABMCA
Outlet Fact File
BBM/ABM/ CA
Outlet Fact File
BBM/ABM/ CA
PROJECT
PROJECT PRE-BRIEF
PROJECT BRIEF
PROJECT APPROVAL
PROJECT HANDOVER
PDC MINUTE/APPROVAL
Strategic Planning
PDC MINUTE/APPROVAL
Strategic Planning
CONDITION INSPECTION REPORT/ FMR
BBM/ABM/CA
CONDITION INSPECTION REPORT/ FMR
BBM/ABM/CA
Handover Document
BBM/ ABM/CA
Handover Document
BBM/ ABM/CA
PROJECT
OPERATIONAL STANDARDS PROJECT INFO PACK
BBM/ABM/CA
OPERATIONAL STANDARDS PROJECT INFO PACK
BBM/ABM/CA
Budget Report by Outlet
BCM
Budget Report by Outlet
BCM
AMENITY UPGRADE/CONVERSION PROJECT INFO PACK
BBM/CA
AMENITY UPGRADE/CONVERSION PROJECT INFO PACK
BBM/CA
PROJECT FINALACCOUNT & CLOSEDOWN
Page 4
4
AccomFRS
BBM
AccomFRS
BBM
Maximo Reactive Order List
BMD
Maximo Reactive Order List
BMD
JDE Order List
BMD
JDE Order List
BMD
PROJECT INFORMATION PACK- OPERATIONAL STANDARDS
Asbestos Report
BMD
Asbestos Report
BMD
Security Checklist
BMD
Security Checklist
BMD
LicenseConditions/Drawings
BMD
LicenseConditions/Drawings
BMD
FRA
BMD
FRA
BMD
Condition Inspection Report
BBM
Condition Inspection Report
BBM
MINOR PROJECT BRIEF
BBM/ABM CA
MINOR PROJECT BRIEF
BBM/ABM CA
• Documents owner by BBM/ABM/CA
• PIP issued by BMC
•Documents assist the Project Brief to be completed by Contract Administrator and Cost Plan completed by QS.
• All information to be updated and returned to BMCor posted on to extranet
Duct Clean Survey
ABM
Duct Clean Survey
ABM
CMI Report
CMI
CMI Report
CMI
Outlet Fact File
BBM/ABM CA
Outlet Fact File
BBM/ABM CA
FMR/MAXIMO INPUT DOC
BMD
FMR/MAXIMO INPUT DOC
BMD
FORWARD MAINTENANCE REGISTER
BMD
FORWARD MAINTENANCE REGISTER
BMD
PPM BY SITE REPORT
BMD
PPM BY SITE REPORT
BMD
PEST REPORT
BMD
PEST REPORT
BMD
BLANK OUTLET FACT FORM
BMD
BLANK OUTLET FACT FORM
BMD
BOYCE DRAWING (EDA’s)
BMD
BOYCE DRAWING (EDA’s)
BMD
MinimumFacilitiesStandards
BMD
MinimumFacilitiesStandards
BMD
Page 5
5
JDE Order List
BMD
JDE Order List
BMD
MinimumFacilitiesStandards
BMD
MinimumFacilitiesStandards
BMD
Handover Document
BBM/CA
Handover Document
BBM/CA
PROJECT MATRIX
BMD
PROJECT MATRIX
BMD
Security Checklist
BMD
Security Checklist
BMD
LicenseConditions/Drawings
BMD
LicenseConditions/Drawings
BMD
FRA
BMD
FRA
BMD
AsbestosReport
BMD
AsbestosReport
BMD
PROJECT INFORMATION PACK- AMENITY UPGRADE/CONVERSION
Condition Inspection Report
BBM
Condition Inspection Report
BBM
Maximo Reactive Order List
BMD
Maximo Reactive Order List
BMD
MAJOR PROJECT BRIEF
BBM/CA
MAJOR PROJECT BRIEF
BBM/CA
AccomFRS
BBM
AccomFRS
BBM
• Documents owner by BBM/CA
• PIP issued by GAA
•Documents assist the Project Brief to be completed by Contract Administrator and Cost Plan completed by QS.
• All information to be updated and returned to GAA or posted on to extranet
Duct Clean Survey
ABM
Duct Clean Survey
ABM
CMI Report
CMI
CMI Report
CMI
Outlet Fact File
BBM/CA
Outlet Fact File
BBM/CA
PEST REPORT
BMD
PEST REPORT
BMD
BLANK OUTLET FACT FORM
BMD
BLANK OUTLET FACT FORM
BMD
BOYCE DRAWING (EDA’s)
BMD
BOYCE DRAWING (EDA’s)
BMD
PPM BY SITE REPORT
BMD
PPM BY SITE REPORT
BMD
FORWARD MAINTENANCE REGISTER
BMD
FORWARD MAINTENANCE REGISTER
BMD
FMR/MAXIMO INPUT DOC
BMD
FMR/MAXIMO INPUT DOC
BMD
Page 6
6
REACTIVE REVENUE CALLS
ReactiveRevenue
Calls
Contractor called and assess call
Contractor raises order on Maximo
Maximo generates Auto e-mail
Contractor attends to site and assess H&S and actions repair within parameters
A BMC approves work or e-mails Brand GAA to update CIR and aborts job.
JCC Issued
JCC Issued or Follow on order reviewed by ABM if value is questioned.
Maximo generates Auto e-mail for “best value” job
Contractor attends to site and assess H&S and actions repair
FOLLOW-ONORDER
ABM/BMC
FOLLOW-ONORDER
ABM/BMC
Job Completion Certificate
Contractor
Job Completion Certificate
Contractor
MinimumFacilitiesStandards
BMD
MinimumFacilitiesStandards
BMD
MAXIMOORDER
ABM/BMC
MAXIMOORDER
ABM/BMC
MAXIMOE-MAIL
ABM/BMC
MAXIMOE-MAIL
ABM/BMC
H&SCategoryAssessment
ABM
H&SCategoryAssessment
ABM
MAXIMOE-MAIL
ABM/BMC
MAXIMOE-MAIL
ABM/BMC
H&S Cat AssessOr SWP
ABM
H&S Cat AssessOr SWP
ABM
Job Completion Certificate
Contractor
Job Completion Certificate
Contractor
ABORTE-MAIL
ABM/BMC
ABORTE-MAIL
ABM/BMC
A BMC Request to Log E-mail
BMC
A BMC Request to Log E-mail
BMC
From FY11 contractor will assess call against MFS Checklist
Page 7
7
PLANNED PREVENTATIVE MAINTENANCE
PPM
Maximo PPM programme for the FY
Programme Generated with Actual Dates downloaded from Maximo
Contractor Completes Testing/Service and downloads Certificate to Maximo
Follow-on works assessed by ABM for value.
Maximo
PMC
Maximo
PMC
Actual Dates and orders
PMC/ABM
Actual Dates and orders
PMC/ABM
Follow-on works Order
ABM/BMC
Follow-on works Order
ABM/BMCCertificates
ABM /
Contractor
Certificates
ABM /
Contractor
Certificates
ABM /
Contractor
Works can be completed on site up to an agreed value To ensure a clean certificate is issued.
If work approved by ABM, BMC raises order. If not approved, BMC e-mails Brand GAA to update CIR and aborts job.
Follow-on works Order
ABM/BMC
Follow-on works Order
ABM/BMC
A BMC Request to Log E-mail
BMC
A BMC Request to Log E-mail
BMC
Check to establish if Legislation has changed
Schedules checked by ABM & BBM amended & feed back
Budget issued for approval by Brand and Company
Orders raised in Maximo
Page 8
8
AccomFRS
BBM
AccomFRS
BBM
Maintenance Operating Standards Project & Compliance Visit
ABM MOS Project
&Compliance Visit
Contractor Pricing Document
OS MAINTENANCEPROJECT BRIEF
OS PROJECT Information Pack
ABM
OS PROJECT Information Pack
ABM
Managing QuantitySurveyor Pricing Check
OS Project Handover & Compliance Visit
Handover Document
ABM
Handover Document
ABM
Document Update
FRA
ABM
FRA
ABM
Outlet Fact File
ABM
Outlet Fact File
ABMCONDITION INSPECTION REPORT/ FMR
ABM
CONDITION INSPECTION REPORT/ FMR
ABM
ABM Compliance Visit
ABM
OS PROJECT Priced Schedule of Rates
ABM
OS PROJECT Priced Schedule of Rates
ABM
OS PROJECT MQS Checked Document
ABM
OS PROJECT MQS Checked Document
ABMOS PROJECT Approved Document
BBM
OS PROJECT Approved Document
BBM
ApprovalMaint ProjectCompleted incPPM follow onWork
Page 9
9
FRA
Click on this icon to take you to the form.
Firesafe Solutions
FRA
Click on this icon to take you to the form.
Firesafe Solutions
Fire Risk Assessment
• Document owner by ABM
• Input by ABM
•New Full FRA are completed on 20% of the estate every year.
•FRA are to be issued as part of OS PIP.
•FRA are updated following the completion of every project.
•ABM to type in amendments and e-mail to Fire Risk Controller
•All FRA are saved on FRA system and e-mailed to the house by FRC.
• FRA review date recorded against project on DES.
Page 10
10
Condition Inspection Report/FMR
Click on this icon to take you to the form.
ABM
Condition Inspection Report/FMR
Click on this icon to take you to the form.
ABM
Condition Inspection Report/Forward Maintenance Register
•“LIVE DOCUMENT”
• Document owner by ABM
• Input by BBM/ABM/BMC/GAA
•All non-reactive/Non-essential works to be added to FMR/Maximo Input Doc and added to Maximo.
•All outstanding/follow-on works MUST BE transferred from this document to FMR to ensure they are captured by the budget process and the next project.
• BMC will update following any project.
• FMR date recorded on DES.
Page 11
11
Area Building Manager Compliance Visit
ABMCompliance Visit
Click on this icon to take you to the checklist.
ABM
ABMCompliance Visit
Click on this icon to take you to the checklist.
ABM
• Document owned by ABM
• Input by ABM
•The ABM Compliance Checklist allows the ABM to confirm that PPM & Statutory works are complete and satisfactory.
•All Statutory Checklists to be down loaded on to the BMD Data Warehouse Outlet File.
Page 12
12
OS Project Brief
OS Project Brief Information Pack
Click on this icon to take you to a report.
ABM
OS Project Brief Information Pack
Click on this icon to take you to a report.
ABM
• Document owned by ABM
• Input by ABM/Contract Administrator
•The document contains a Contractor schedule of rates and allows works to be coded to a Project Expenditure Summary.
•The document also contains a Expenditure Request Form & a Matrix.
•The document provides the basis for Project Costing & Approval.
•All completed briefs to be down loaded onto the Extranet
• Brief date/approval recorded against project on DES.
Page 13
13
OS Project Pricing
OS Project Pricing Schedule of Rate
Click on this icon to take you to a report.
ABM
OS Project Pricing Schedule of Rate
Click on this icon to take you to a report.
ABM
• Document owned by ABM
• Input by Contract Administrator
•The document contains a Contractor schedule of rates and allows works to be coded to a Project Expenditure Summary.
•The Contractor must complete and return the document to the Managing QS within 14 days.
•The document also contains a Expenditure Request Form, a Matrix and a reference sheet for the Health and Safety Plan.
•The document provides the basis for Project Approval.
•All completed briefs to be down loaded onto the Extranet
Page 14
14
OS Project QS Check
OS Project MQS Checked Document
Click on this icon to take you to a report.
ABM
OS Project MQS Checked Document
Click on this icon to take you to a report.
ABM
• Document owned by ABM
•The MQS checks the priced document for rates, rouge items, & % adjustments.
• The document is emailed to the ABM who checks the brief.
•The document contains a Contractor schedule of rates and allows works to be coded to a Project Expenditure Summary.
•The checked document is to be forwarded by ABM to the Channel aligned BCC.
•All completed briefs to be down loaded onto the Extranet and recorded on DES.
Page 15
15
OS Project Approval
OS Project Approved Document
Click on this icon to take you to a report.
BBM
OS Project Approved Document
Click on this icon to take you to a report.
BBM
• Document owned by BBM
•The checked document should then be forwarded by the BCC to the BBM.
•The BBM will then seek approval for the Maintenance Project dependant of value.
•ROD < £30k, CPE > £30k, PDC > £100k
•All Approved Project Cost Summaries to be down loaded onto the Extranet and recorded on DES.
•BCC issues approved PCS to BBM/ABM/QS/Contractor.
•Maintenance Cost Manager, on a period basis, confirms ROD approvals to the Channel Exec and seeks approval for projects above threshold.
•The MCM will report on overall Project Budget spend to date.
•QS issues approved orders to suppliers and send matrix to ABM to arrange HoB signature, before budget is loaded and project started.
Page 16
16
Outlet Fact File
Outlet Fact File
Doc Ref: P07
Click on this icon to take you to a report.
ABM
Outlet Fact File
Doc Ref: P07
Click on this icon to take you to a report.
ABM
• Document owned by ABM
• Issued in PIP.
• Data Collection by ABM/BBM/CA
• Input by ABM/GAA/BMC
• A capture of site specific data on an outlet following the completion of a OS, Amenity, Conversion or Acquisition Project.
• All completed reports to be updated on the MFS Property Data collection site by GAA/BMC
• Updated OFF recorded against project on DES.
•All Exception Reports depend on good data.
Page 17
17
Maintenance Project Completed inc PPM Follow-on Work
•Document owned by ABM
•All PPM inspections are completed prior to the Maintenance Project taking place.
•All Follow-on works identified on the various PPM inspections to be completed on the Maintenance Project unless deemed urgent.
•All works to be checked for statutory compliance on the Handover of the Project by the ABM as part of the compliance visit.
Page 18
18
BUDGET
ANNUAL BUDGET
Budget Report by Outlet
Budget Report by Outlet
BCM
Budget Report by Outlet
BCM
Current PPM schedules downloaded from Maximo
PPMCheck to see if legislation has changed
Schedules checked by ABM & BBM amended and fed back.
Budget issued for approval by Brand & Company
PPM report by order, site and brand
PPM team
PPM report by order, site and brand
PPM team
Page 19
19
PREMISES AUDIT (CMI)
CMI
Essential BRAG rated itemsIdentified on CMI Report
Print off of Black, Red & Amber items.LHM to make immediate reactive callouts made
Monthly CMI Report issued to BMCTo audit that Black and Red items haveBeen actioned
Green items issued to Brand GAA for input on to the Condition Inspection Report
Monthly CMI Report
CMI
Monthly CMI Report
CMI
CMI Report
CMI
CMI Report
CMI
CMI Print off Black Red Amber Items
CMI
CMI Print off Black Red Amber Items
CMI
Job Completion Certificate
Contractor
Job Completion Certificate
Contractor
Where there are a large number ofworks, the ABM will review for value
Monthly CMI Report
CMI
Monthly CMI Report
CMI
Page 20
20
DATA STORAGE
Outlet FactFile
ConditionReport
MinimumFacilitiesStandardsChecklist
ABMStatutoryChecklist
Certificate Of Inspection
Certificate Of Inspection
Data is to be filedand recorded via the BUN number / Outlet name and reference number on to the BMD Data Warehouse and the Extranet.
Outlet Project A Project B
Photos
Drawings
Bldg Regs
Brief
Planning Approv
Drawings
Photos
Brief
Planning Approv
Bldg RegsClick for Files
Page 21
21
Franchise, Estates And NTP
FRANCHISE, ESTATES AND NTP
Reactive Repair
Franchise Change of ownership
Project Approval
PPM
ABM Statutory Inspection
Data Collection
Page 22
22
AMENITY UPGRADE PROJECT BRIEF
Doc. Ref: P01
Click on this icon to take you to the form
BBM/CA
AMENITY UPGRADE PROJECT BRIEF
Doc. Ref: P01
Click on this icon to take you to the form
BBM/CA
Amenity Upgrade Project Brief
• Document owner by BBM/BM
• Input by BBM/Contract Administrator/QS/Designer/GAA
•Document consists of Project Brief to be completed by Contract Administrator and Cost Plan completed by QS.
• All Project Briefs to be down loaded to Outlet File on the Extranet and recorded on DES.
AMENITY UPGRADE PROJECT COST PLAN
Doc. Ref: P02
Click on this icon to take you to the form
BBM/CA
AMENITY UPGRADE PROJECT COST PLAN
Doc. Ref: P02
Click on this icon to take you to the form
BBM/CA
Page 23
23
Minimum Facilities Standards Checklist
Doc Ref: P04
Click on this icon to take you to the form.
BBM/ABM/CA
Minimum Facilities Standards Checklist
Doc Ref: P04
Click on this icon to take you to the form.
BBM/ABM/CA
Minimum Facilities Standards Checklist
• Document owner by BBM/ABM/CA
• Input by BMD
• This is an aide memoir checklist.
• All projects must ensure that all items on this list are repaired/replaced and brought up to standard on completion of any project.
Page 24
24
PDC Minute/Approval
Doc Ref: P05
Click on this icon to take you to the form.
Strategic Planning
PDC Minute/Approval
Doc Ref: P05
Click on this icon to take you to the form.
Strategic Planning
Project Approval
• Document owner by PDC
• Input by Strategic Planning/BCM
• All PDC Minutes and approvals to be down loaded to Outlet File on the Extranet and approval date recorded on DES.
•Matrix signed by Head of Building Development before budget is leaded and project started and recorded on DES.
Page 25
25
Amenity Upgrade Project Handover Document
Doc Ref: P06
Click on this icon to take you to the form.
BBM/CA
Amenity Upgrade Project Handover Document
Doc Ref: P06
Click on this icon to take you to the form.
BBM/CA
Amenity Upgrade Project Handover Document
• Document owner by BBM/CA
• Input by BBM/Contract Administrator/GAA
• All Amenity Upgrdade Projects to have a Handover Document which must be down loaded to Outlet File on the Extranet and recorded on DES.
Page 26
26
Asbestos Report
Asbestos Report
Doc Ref: P09
Click on this icon to take you to a report.
BBM/ABM
Asbestos Report
Doc Ref: P09
Click on this icon to take you to a report.
BBM/ABM
• Document owned by BBM/ABM
• Input by GAA Asbestos
• Forms part of the PIP.
• A summary of asbestos on any given site and risk category
• All completed reports to be held on Asbestos Database and used on every project to identify risks
Page 27
27
FRA
Doc Ref: P08
Click on this icon to take you to the form.
Firesafe Solutions
FRA
Doc Ref: P08
Click on this icon to take you to the form.
Firesafe Solutions
Fire Risk Assessment
• Document owner by BBM/CA
• Input by BBM/Contract Administrator /GAA
• FRA are completed on 20% of the estate every year.
• FRA are to be issued as part of PIP.
• FRA are updated following the completion of every project.
• FRA will be checked and updated at the ABM Compliance Visit
• Contract Administrator/GAA to type in amendments and e-mail to FR Controller
• All FRA are saved on FRA system and e-mailed to the house by FRC.
• FRA review date to be recorded on DES.
Page 28
28
Condition Inspection Report/FMR
Doc Ref: P10
Click on this icon to take you to the form.
BBM
Condition Inspection Report/FMR
Doc Ref: P10
Click on this icon to take you to the form.
BBM
Condition Inspection Report/Forward Maintenance Register •“LIVE DOCUMENT”
• Document owner by BBM
• Input by BBM/CA/GAA
•The CIR is to held at the individual Outlet File on this database.
• All non-reactive/Non-essential works to be added to FMR/Maximo Input Doc and added to Maximo.
• All outstanding/follow-on works MUST BE transferred from this document to FMR to ensure they are captured by the budget process and the next project.
• GAA will update following project.
• FMR date recorded on DES.
Page 29
29
BSD Invoice Approval Process
QS fees submitted to Building Cost Manager (BCM) for approval. QS raises invoice
Invoice received by Property Accounts & logged on Invoice Report
INVOICE APPROVAL
QS FEE Approval Form.xls
BCM
QS FEE Approval Form.xls
BCM
Sample Invoice Report.pdf
Generator
Sample Invoice Report.pdf
Generator
Invoice report returned to Property Accounts in writing to process as appropriate
QS Approval form signed by BCM and QS invoice attached (no payment unless attached
Invoice Report Issued to all owners for approval
Start point
Supplier paid within MAB terms of agreement
Page 30
30
BSD Standard Procedure for Tendering Building Works
Award Criteria & Evaluation
Contract Award
Building Services Dept Tender Strategy
Award Criteria and Evaluation
Commercial / HoD’s
Award Criteria and Evaluation
Commercial / HoD’s
TENDERING
Inviting & Receiving Tenders
BBM/ABM
Inviting & Receiving Tenders
BBM/ABM
Tender Process Criteria
BBM/ABM
Tender Process Criteria
BBM/ABM
Tender Strategy Doc
Dir of BS/ Dir of CP
Tender Strategy Doc
Dir of BS/ Dir of CP
Inviting & Receiving Tenders
Tender Selection Criteria
BBM/ABM
Tender Selection Criteria
BBM/ABM
Tender ProcessPost Tender Negotiations
Tender Selection
Start point
Post Tender Negotiations
Commercial / Cost Management
Post Tender Negotiations
Commercial / Cost Management
Contract Award
Commercial / HoD’s
Contract Award
Commercial / HoD’s
Legal & Commercial Sign Off
Commercial / HoD’s
Legal & Commercial Sign Off
Commercial / HoD’s
Legal & Commercial Sign Off
Page 31
31
Specification & Buying Process
Spec & Buying
Scope produced for Specification or Equipment
Tender DocumentsProduced and Issued
Tender Return AnalysisAnd RecommendationsDecision Review
Meeting
Decision Paper toOps Board & APE
Agreement and/orContract in place Scope
HoBP&S
Scope
HoBP&S
Tender
Comm Buyer
Tender
Comm Buyer
Tender Return
Comm Buyer
Tender Return
Comm Buyer
StakeHolder Mtg
HoBP&SComm Buyer
StakeHolder Mtg
HoBP&SComm Buyer
Paper
HoBP&S
Paper
HoBP&S
Agreement
Comm Buyer
Agreement
Comm Buyer
Page 32
32
SCOPE
Click on this icon to take you to the form.
Head of Building Policy&Standards
SCOPE
Click on this icon to take you to the form.
Head of Building Policy&Standards
Scope for Tender
• Document owner by Head of Building Policy & Standards
• Scoping document that details all the information and specifications required to tender the element or equipment.
• Passed to Commercial Buyer
Page 33
33
Tender
Click on this icon to take you to the form.
Commercial Buyer
Tender
Click on this icon to take you to the form.
Commercial Buyer
Tender Documents
• Document owner by Commercial Buyer
• Document, letter or e-mail used to tender, prove or establish best value costs based on scope and requirements
Page 34
34
Tender Return Analysis
Click on this icon to take you to the form.
Commercial Buyer
Tender Return Analysis
Click on this icon to take you to the form.
Commercial Buyer
Tender Return Analysis
• Document owner by Commercial Buyer
• Analysis and Recommendations based on cost and services return.
• To be issued to Head of Building Policy & Standards for review
Page 35
35
Recommendation Review Meeting
Head of Building Policy & Standards / Commercial Buyer / Stakeholders
Recommendation Review Meeting
Head of Building Policy & Standards / Commercial Buyer / Stakeholders
Recommendation Review Meeting
• Meeting owned by Head of Building Policy & Standards and Commercial Buyer.
• A meeting extended to key stakeholders; energy, maintenance, specification advisory team to agree recommendations and decision selection.
•Recommendations to form basis of formal papers.
Page 36
36
Operating Board / Asset Planning Exec
Click on this icon to take you to the form.
Head of Building Policy & Standards
Operating Board / Asset Planning Exec
Click on this icon to take you to the form.
Head of Building Policy & Standards
Approval Papers
• Document owner by Head of Building Policy & Standards
• Paper formalising reasons, specification, analysis and recommendations to adopt policy, specification, equipment or guidelines.
• Approval sought.
Page 37
37
Supply Agreement
Click on this icon to take you to the form.
Commercial Buyer / Head of Building Commercial
Supply Agreement
Click on this icon to take you to the form.
Commercial Buyer / Head of Building Commercial
Agreement
• Document owner by Commercial Buyer & Head of Building Commercial
• Supply Agreement set up to manage price, stock, supply and delivery.
• Matrix contract to be established as appropriate.
•All final documentation to be head by Building Supply Controller.
Page 38
38
Policy & StandardsFLOODS ACCIDENTS
SECURITY
LICENSING
HIMO
ENERGY
ACCOMMODATION
HEALTH & SAFETY Specification & Buying
WHITE GOODS
Page 39
39
Houses in Multiple Occupation
HIMO REPORT
Doc Ref: P11
Click on this icon to take you to the form.
Firesafe Solutions
HIMO REPORT
Doc Ref: P11
Click on this icon to take you to the form.
Firesafe Solutions
• Document owner by BBM/ABM/CA
• Input by BBM/ABM/CA/FSS
• Following the identification of a HIMO, FSS complete a survey and issue to the BBM for review.
• Works are approved or aborted by MD at Channel Property Exec.
•Remedial works are completed or staff are removed.
•A Final inspection and certificate issued to site.
• All HiMO reports to be down loaded to Outlet File on the Extranet.
•All HiMO sign-off certificates to be down loaded onto Extranet.
• Wendy Wharton (OPS) notified of change and master records updated.
HIMO SITE CERTIFICATE
Doc Ref: P12
Click on this icon to take you to the form.
Firesafe Solutions
HIMO SITE CERTIFICATE
Doc Ref: P12
Click on this icon to take you to the form.
Firesafe Solutions
Accomm Status Change Process
Click on this icon to take you to the form.
BBM
Accomm Status Change Process
Click on this icon to take you to the form.
BBM
Page 40
40
Floods
Record of Flood concerns
Doc Ref: P13
Click on this icon to take you to the fact file.
BBM/ABM
Record of Flood concerns
Doc Ref: P13
Click on this icon to take you to the fact file.
BBM/ABM
• Document owner by BBM/ABM/CA
• Input by BBM/GAA/ABM/BMC/CA
• Incidents of flooding to be recorded in the Outlet Fact File on the BMD Data Warehouse.
•To highlight future defence mechanisms i.e. hard floor finished, flood defence.
Page 41
41
Incidents
Incident Report
Doc Ref: P14
Operations
Incident Report
Doc Ref: P14
Operations
• Document owner by Operations
• Input by Operations
• A record of the incident reports logged against sites.
•A Contractor inspects property issues and raises order for minor works. Works completed and final inspection completed.
•Reporting tool
Page 42
42
Licensing Conditions/Drawings
Licensing Conditions
BBM
Licensing Conditions
BBM
• Document owner by BBM/ABM
• Input by BBM/ABM/Contract Administrator
•Licensing Drawings and conditions are to be issued as part of PIP.
•All existing licensing drawings and license conditions can be obtained via Poppelston Allen/Blake Lapthorn/Hill Brown Solicitors.
• All amended licensing drawings to be drawn up and issued to solicitors for filling.
•Web Addresses: https://bllxtra.bllaw.co.uk
http://l2v.popall.co.uk/mab/login.asp
Licensing Drawings
BBM
Licensing Drawings
BBM
Page 43
43
Security AlarmsDoc Ref: P16d
Lock Up
Chubb
Security AlarmsDoc Ref: P16d
Lock Up
Chubb
Security
CCTV ReportDoc Ref: P15a
Chubb Rampart
CCTV ReportDoc Ref: P15a
Chubb Rampart
• ISSUED IN PIP
•Document owner by HOD’s
• Input by Supplier
• Basic Security Standards checklist to be completed on every project.
•Contractor/Supplier Maintains data base of information on each site.
•A rolling 5 year programme to bring all sites up to MFS.
• All Security reports to be down loaded to Outlet File on the Extranet.
Security AlarmsDoc Ref: P16e
Live In
Chubb
Security AlarmsDoc Ref: P16e
Live In
Chubb
SafesDoc Ref: P17a
In-Safe
SafesDoc Ref: P17a
In-Safe
Basic Security StandardsDoc Ref: P18
To view security checklist, please click here
Security
Basic Security StandardsDoc Ref: P18
To view security checklist, please click here
Security
Page 44
44
Energy
ENERGY AUDITDoc Ref: P19
Click on this icon to take you to an audit.
Energy Management Team
ENERGY AUDITDoc Ref: P19
Click on this icon to take you to an audit.
Energy Management Team
• Document owner by Energy Management Team.
• Input by EMT
• Regular Energy Audits completed on sites based on unusual trends, data or energy costs.
•Trial of Capital initiatives through out the year to drive innovation and energy costs down.
• All Energy Audits to be down loaded to Outlet File on the Extranet.
LOW ENERGY BRAND LIGHTING
Click on this icon to take you to the list of brand lights
Energy Management Team
LOW ENERGY BRAND LIGHTING
Click on this icon to take you to the list of brand lights
Energy Management Team
Page 45
45
Accommodation
AccommodationStandardsChecklistDoc Ref: P20
To be developed
BBM/ABM/CA
AccommodationStandardsChecklistDoc Ref: P20
To be developed
BBM/ABM/CA
• Document owner by BBM/ABM/CA
• Input by BBM/ABM/GAA/BMC
• Accommodation standards to be checked at every project and annual Statutory Inspection.
•Rolling Programme to bring accommodation up to MAB standard and maintain it.
• All Accommodation ratings to noted on Outlet Fact File:
•RED – High Risk; AMBER – Medium Risk; GREEN – Low Risk
• Managers Accommodation form uploaded to outlet on Extranet.
Page 46
46
Health and Safety
Health & SafetyWeb page
BBM/ABM
Health & SafetyWeb page
BBM/ABM
• Document owner by BBM/ABM/CA
• Input by BBM/ABM/GAA
• A Web Link direct link to the H&S Operations manual and SWP form
•All SWP to be held on H&S Web site.
•Web Address: www.mabcdm.co.uk
• H&S sign off date recorded on DES.
Page 47
47
Job Completion Certificate
JCC
Doc Ref: P23
Click on this icon to take you to a JCC.
Contractor
JCC
Doc Ref: P23
Click on this icon to take you to a JCC.
Contractor
• Document owned by Contractor
• Input by Contractor
•JCC copy to be left on site
•JCC copy only to be downloaded onto the Outlet File on the Extranet if acting as a PPM record of completion.
•JCC copy to be held by Contractor
Page 48
48
Maximo PPM Master Programme
Maximo PPM Master Programme
Doc Ref: P24
Click on this icon to take you to the spreadsheet
PMC
Maximo PPM Master Programme
Doc Ref: P24
Click on this icon to take you to the spreadsheet
PMC
• Document owned by PMC
• Input by PMC
•Database updated and held on Maximo.
•Drives PPM Contracts and Actual Inspection dates.
Page 49
49
Follow – on Works Order (Maximo)
Follow-on Works Order
PMC/BMC
Follow-on Works Order
PMC/BMC
• Document owned by PMC/BMC
• Input by PMC/BMC
•Follow-on works order placed via Maximo
Page 50
50
Reactive Repair System (Maximo)
Maximo
ABM/PMC/BMC
Maximo
ABM/PMC/BMC
•Document owned by ABM/PMC/BMC
• Input by PMC/BMC/Contractor
•Maximo is a independent computer program and process system that places, manages and process works orders for reactive job calls.
•It acts as a reporting tool for driving value and auditing contractors.
•This system will remain independent and accessed via ABM/PMC/BMC
Page 51
51
Maximo - Email
Maximo E-mail
PMC/BMC
Maximo E-mail
PMC/BMC
• Document owned by PMC/BMC
• Input by PMC/BMC/Contractor
•Maximo E-mail provides instruction and order to complete or abort work
•Maximo is a independent computer program and process system that places, manages and process works orders.
•This system will remain independent and accessed via PMC/BMC
Page 52
52
Area Building Manager Compliance Visit
ABMCompliance VisitDoc Ref: P25
Click on this icon to take you to the checklist.
ABM
ABMCompliance VisitDoc Ref: P25
Click on this icon to take you to the checklist.
ABM
• Document owned by ABM
• Input by ABM
•The ABM Compliance Checklist allows the ABM to confirm that PPM & Statutory works are complete and satisfactory.
•All Statutory Checklists to be down loaded on to the BMD Data Warehouse Outlet File.
Page 53
53
Budget Report by Outlet
Budget Report by Outlet
Click on this icon to take you to the budget report.
BCM
Budget Report by Outlet
Click on this icon to take you to the budget report.
BCM
• Document owned by BCM
• Input by BCM
•A summary report of the Condition cost of all outlets, discretionary amenity maintenance and top down initiatives.
•Used as the basis for annual budget setting.
Page 54
54
Premises Report (CMI)
CMI Report
Doc Ref: P20
Click on this icon to take you to a report.
CMI
CMI Report
Doc Ref: P20
Click on this icon to take you to a report.
CMI
• Document owned by CMI
• Latest report issued in PIP
• Input by CMI
•A regular independent statutory inspection
•Identifies Premises Defects and Inspects Statutory Compliance
•All Black, Red and Amber items generate a reactive call to resolve defects immediately.
•All Green items are recorded on the Condition Inspection Report
Page 55
55
PPM Certificate Filing References
PPMCertificates
DISCRETIONARY
PPMCertificates
DISCRETIONARY
PPMCertificates
STATUTORY
PPMCertificates
STATUTORY
PPMCertificates
ESSENTIAL
PPMCertificates
ESSENTIAL
PPMCertificates
NOT YET IN PLACE – TO BE CONSIDERED
PPMCertificates
NOT YET IN PLACE – TO BE CONSIDERED
Page 56
56
REGULAR REPORTING
• MFS Reporting from GCAD hierarchy• BMD TDI status from GCAD hierarchy• PPM status report from GCAD hierarchy• Ad-hoc Reporting from Outlet Fact File data
Page 57
57
Asbestos Report
Asbestos Report
Doc.Ref: P09
Click on this icon to take you to a report.
BBM/ABM
Asbestos Report
Doc.Ref: P09
Click on this icon to take you to a report.
BBM/ABM
• Document owned by BBM/ABM
• Input by GAA Asbestos
• Forms part of the PIP.
• A summary of asbestos on any given site and risk category
• All completed reports to be held on Asbestos Database and used on every project to identify risks
Page 58
58
Project Matrix
Matrix
Doc.Ref: P26
Click on this icon to take you to a report.
BBM/ABM/CA
Matrix
Doc.Ref: P26
Click on this icon to take you to a report.
BBM/ABM/CA
• Document owned by BBM/ABM/CA
• Input by Contract Admin/GAA
•The building contract by which the project will be managed.
•The Project Matrix MUST BE signed and communicated to the contracting parties BEFORE the budget is loaded and the project begins.
•The completed Project Matrix MUST BE posted to the specific site project file and held on the Extranet
• Signed Matrix to be recorded on DES.
Page 59
59
Change of Ownership Workbook
Doc. Ref: P27
Click on this icon to take you to the form
BBM Franchise
Change of Ownership Workbook
Doc. Ref: P27
Click on this icon to take you to the form
BBM Franchise
Franchise - Change of Ownership
• Document owner by BBM Franchise
• Input by BBM Franchise/ABM Franchise
• All Change of Ownership Workbooks to be down loaded to Outlet File on the 4 Projects Extranet
•Workbook to be used on
•Managed to Franchise Change
•Franchise to Franchise Change
•Franchise to Managed Changed
Page 60
60
BMC Request to Log E-mail
Ref. Doc. P28
BMC
BMC Request to Log E-mail
Ref. Doc. P28
BMC
BMC Request to Log E-mail
• Document owner by BMC
• Input by BMC
• All outstanding non-reactive works are to be e-mailed to the Brand GAA for input onto the Condition Inspection Report.
Page 61
61
• All Bar One• Browns• Castle• Community & Cornerstone• Crown Carveries• Ember• Harvester• Miller & Carter• Nicholson's• O'Neill's• SPC• Toby• Town Pubs• Vintage• VPK
Low Energy Brand Lighting
Click on Brand to open brand doc.
Page 62
62
JDE Orders Raised
Ref. Doc. P29
BCM
JDE Orders Raised
Ref. Doc. P29
BCM
JDE Orders Raised
• Document owner by BCM
• Input by BCM
• A Webi report that details the actual orders raised in JDE against an individual site.
• Forms part of Project Information Pack
Page 63
63
Maximo Reactive Orders Raised
Ref. Doc. P30
PMC
Maximo Reactive Orders Raised
Ref. Doc. P30
PMC
Maximo Reactive Orders Raised
• Document owner by PMC
• Input by PMC
• A report detailing all reactive calls to a site to assist in identifying and re-occuring problems.
• Forms part of Project Information Pack.
Page 64
64
AccommodationFire RiskSurvey
Ref. Doc. P08b
BBM
AccommodationFire RiskSurvey
Ref. Doc. P08b
BBM
Accommodation Fire Risk Survey
• Document owner by BBM
• Input by BBM/ABM/GAA/BMC
• A survey of the MAB Fire Risk Standards that apply to the LHM and Staff Accom.
• Forms part of Project Information Pack.
• Must be completed a part of the brief and works identified completed as part of project via MFS.
• Managers Accommodation form uploaded to outlet on Extranet.
Page 65
65
Duct Clean Survey
Ref. Doc. E01
ABM
Duct Clean Survey
Ref. Doc. E01
ABM
Duct Clean Survey
• Document owner by ABM via PPM
• Input by PPM Contractor
• A survey of the MAB kitchen duct highlighting defects, access panels and inadequate ducting
• Forms part of Project Information Pack.
• Must be reviewed as part of the brief and works identified completed as part of project via MFS.
Page 66
66
White Goods
White Goods List
Click to Approved Specifications
P&S
White Goods List
Click to Approved Specifications
P&S
• Document owner by Head of Building Policy & Standards
• Change only by HoBP&S
• All white goods can only be ordered by Building Services Department – Project or Reactive Replacement
•No Operations led repairs or replacement can be instigated. All issues MUST BE directed via the Building Services Department for budget and audit purposes.
•Agreed Operating Board 29 June 2010 -White Goods Policy – Tumble Dryers
Page 67
67
Approved Specifications(click to follow link)
• Tumble Dryers• Washing Machines• Kitchen Resin Floors• Toilet Resin Floors• Customer Toilet Was
h-hand taps