1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001
12

1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

Dec 28, 2015

Download

Documents

Darren James
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

1

ATLAS TileCal Production at UIUC

Maggie Geppert, UIUC

Dr. Steven Errede, project head

July 9th, 2001

Page 2: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

2

Overview

• Project Background

• Submodule Production

• Photomultiplier Tube (PMT) Testing

• What’s Next

Page 3: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

3

Overview of ATLAS

• Located at Cern in Switzerland, ATLAS will be largest Particle Accelerator in the World

• Five Stories Tall

• Accelerates Protons to 7 trillion eV

• Scheduled to be Completed in 2005

Page 4: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

4

Submodule Production

• Submodules are the framework of the detector.

• Hold the detector plates that glow in the presence of radiation from subatomic particles.

Page 5: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

5

Submodule Production

• Seven easy steps to a submodule– Washing spacers and masters

– Sanding and drying

– Gluing

– Welding

– Measuring

– Painting

– Banding

Page 6: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

6

Production Pictures

• Submodule assembly with glue machine

• Banding and wrapping

Page 7: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

7

Photomultiplier Tubes (PMT’s)

• Signals from the detector array are amplified using PMT’s

• Currently testing 3,000 of the 10,000 to be used in ATLAS

• Run the tubes through a series of computer programs

• Right now finishing STEP 1– DC light used during testing process

Page 8: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

8

What do We Test?

• Drift– The % change in current over ~30 hrs

– Not to be greater than +/- 2%

• Dark Current– Current through tubes when light isn’t on

– must be < 2 nAmps at 800 Volts

– must be < 4 nAmps at 900 Volts

• These are the 2 most important factors

Page 9: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

9

Testing

• Problem– Systematic increase in the Drift of all tubes, including

the reference tubes

• Solution– Look for external causes for the problem

– Check testing setup for flaws in circuits or fiber-optic cable

Page 10: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

10

First Look

• Looked at temperature, humidity, and other external factors– Little correlation

Change in Drift vs. Change in Humidity

-3

-2

-1

0

1

2

3

-10 0 10 20 30

Change in Drift

Ch

an

ge

in

Hu

mid

ity

delta #1

delta #2

delta #3

delta #4

Change in Drift vs. Change in Temperature

-3

-2

-1

0

1

2

3

-1.5 -1 -0.5 0 0.5 1 1.5

Change in Temperature (C)

Ch

an

ge

in

Dri

ft

delta #1

delta #2

delta #3

delta #4

Page 11: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

11

Next Steps

• Check hardware for internal problems– Currently running diagnostic tests

– Then change the circuit setup in the light source

• After problem is fixed, run STEP 2 tests– Use pulsed light to test PMT’s

• Continue Submodule Production

Page 12: 1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.

12

Questions?