Top Banner
1 Agnes Water / 1770 Integrated Water Project
30

1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

Dec 13, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

1

Agnes Water / 1770 Integrated Water

Project

Page 2: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2

United Utilities Australia

Carmine Ciccocioppo

State Manager - Queensland

United Utilities Australia

Page 3: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

3

About United Utilities Australia

• United Utilities Australia was established in 1991 and now provides water and wastewater solutions and services to 11 clients and approx 4.0 million people across five states.

• Clients are both public sector (e.g. Water Authorities, local Councils) and private sector (e.g. BHP-Billiton)

• National Operations include – 35 water filtration plants – 15 WWTPs, – > 2200 km water distribution and trunk mains– >1500km sewer mains

• Experience in operating in rural and remote communities

Page 4: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

4

In Queensland: UUA delivered and has operated for eight

years a 12ML/d desalination plant for Queensland Nickel in Townsville

About United Utilities Australia

Page 5: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

5

UUA- Approach to Operations

• UUA’s operational philosophy represents industry-best practice

• Operational track record with near-perfect compliance • Best-of-Industry:

– Safety practices and emergency management systems; and – Environment practices and systems;– Systems third-party accredited to ISO9001 (QA), ISO14001

(EMS) and AS4801 (OH&S)

track record demonstrated over 15 years continuous operation across 4 states.

• Long Term community relations that are proactive, transparent and honest.

Page 6: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

6

UUA- Approach to Operations

• Operators (“Process Controllers”) that are minimum trade qualified and highly experienced

• Fully automated control (SCADA) systems that can be operated remotely from a laptop anywhere in the world

• Extensive on-line monitoring, alarms and back-up systems

• Duty/ standby on critical equipment• Well developed asset management systems

that maintain plant and equipment in reliable condition at all times

Page 7: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

7

Compliance Track Record

Project Samples/Tests per

annum

Typical Annual

Production (ML)

Compliance Performance

Macarthur ~6,000 11,500 100% in 10 out of 12 years;

99.99% 99.18%

Yan Yean ~9,000 30,000 99.95% average per annum

Riverland ~25,000 31,000 99.81% average per annum

Page 8: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

8

Operations for this Project

• Operations Manager and 2 Process controllers on a 24-7 on-call roster

• Operations Manager with 20 years water treatment experience including management of RO plants

• Third-party accreditation for QA, environmental management and safety within 12 months of commissioning completion

Page 9: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

9

Summary

• Company with extensive operations experience in all areas of Australia including rural and remote communities

• Track record of near-perfect contractual and statutory compliance

• Sophisticated control and monitoring systems

• Experienced Team

Page 10: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

10

Construction of the Facilities

Tim Bradshaw

Construction Manager

United Utilities Australia

Page 11: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

11

Construction of the Facilities

Three Distinct Areas of Construction

•1770 Sewer and Potable Water•Sewage Treatment Plant•Potable Water Infrastructure

-Desalination-Bore Water

Page 12: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

12

Township of 1770 Construction Works

Supply and installation of a new low pressure sewerage system

Page 13: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

13

Supply and installation of a new potable water system

Township of 1770 Construction Works

Page 14: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

14

Sewage Treatment Plant

Page 15: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

15

Sewage Treatment Plant

Page 16: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

16

Desalination Plant Construction

Page 17: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

17

Desalination Plant Construction

Seawater Intake

Page 18: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

18

Desalination Plant Construction

Brine Diffuser

Page 19: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

19

Osmoflo

Neil Palmer

General Manager Technical Services

Osmoflo

Page 20: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2020

Desalination

o Seawater desalination is very widely practiced around the globe

o More than 13,000 desalination plants are in operation worldwide

o Some plants are more than 50 years oldo The largest (Ashkelon) can produce 370 ML/do Australia’s first major seawater desalination plant in

Perth (2006) produces 145 ML/d, 17% of the city’s needs

Page 21: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2121

Current and Planned Australian Plants

Plant Location Capacity Completion

Perth 1 Kwinana 145 2006

Gold Coast Tugun 133 2008

Sydney Kurnell 250 2009

Perth 2 Bunbury 150 2011

CITIC PS Iron Karratha 175 2011

Melbourne Wonthaggi 450 2011

Adelaide Pt Stanvac 150 2011

Whyalla Pt Bonython 180 2013

Page 22: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2222

Perth Desalination Plant

Page 23: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

23

23

Osmosis and Reverse Osmosis

Semi permeable membrane

Osmosis – fresh water naturally moves into more saline water (this is how trees get water)

Pressure

Reverse osmosis – fresh water driven out of salt water

Page 24: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

24

24

Sea Water Reverse Osmosis

Water Recovery is 45%

Feed 1.00Treated Water

0.45

Driving head 600 m

Concentrate 0.55

Membrane salt rejection is 99%

Page 25: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2525

Osmoflo

o Agnes Water desalination plant is being built for UUA by Australian company Osmoflo

o Osmoflo has built 150 desalination plants in Australia and overseas

o Seawater desalination plants are at Scalpay (Scotland), Hong Kong, Marion Bay (SA) Exmouth (WA), Heron, Green, Bedarra and Brampton Islands (Qld)

o Osmoflo has extensive experience in design, construction and operation of desal plants

Page 26: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2626

Agnes Water Desalination Plant

o Raw seawater intake and concentrate diffuser in open ocean

o Microfiltration capacity 3.3 ML/do Reverse osmosis permeate (freshwater)

flow 1.5 ML/d o RO recovery 45%o Feed salinity 38,000 mg/Lo Permeate salinity <500 mg/L

Page 27: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2727

Agnes Water Desalination Plant

o Permeate to be disinfected and stabilised to prevent corrosion

o MF backwash goes to ocean discharge with RO concentrate

Page 28: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

2828

Desalination Plant Layout

Page 29: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

29

Broken Hill Desalination Plant

29

Page 30: 1 Agnes Water / 1770 Integrated Water Project. 2 United Utilities Australia Carmine Ciccocioppo State Manager - Queensland United Utilities Australia.

3030

Broken Hill Desalination Plant