    Problem

    Deteriorating Pavements More traffic, trucks, buses

    Less funding available Road materials are more

    costly

    Useful life of materialsseems shorter

  • 8/8/2019 07 Pavement Mgt System

    3/22

    Answer Do nothing (doesn't work)

    Repeat last yearsapproach (again & again)

    What is the industrydoing?

  • 8/8/2019 07 Pavement Mgt System

    4/22

    Why Micro PAVER?

    Developed by the Army Corps in the late 70s

    Recommended by APWA (American PublicWorks Association)

    Optimizes funds allocated for M&R

    Utilizes the PCI methodology PCI became an ASTM standard in 1999

    Most widely used system in the world.

  • 8/8/2019 07 Pavement Mgt System

    5/22

  • 8/8/2019 07 Pavement Mgt System

    6/22

    Similarities

    YesYesYesHills

    OhioCuyahogaAlleghenyMonongahela

    River77 sq mi62 sq mi55 sq miArea

    331,000210,000350,000Population

    178818251758Founded

    234743Snow

    YesYesYesOld&NewStreets

    900900800Miles

    CincinnatiAkronPittsburgh

  • 8/8/2019 07 Pavement Mgt System

    7/22

    Pavement Management

    Plans, Organizes & Documents Helps make better decisions

    Provides support data for decisions

    Answers what if scenarios

    Objectively answers what can be left out

    Shows the progress or lack of Objective recommendations

  • 8/8/2019 07 Pavement Mgt System

    8/22

    What is a Pavement ManagementSystem? (Micro PAVER)

    Inventory

    Inspection (ASTM)

    Reporting Modeling

    Condition Analysis

    M&R Planning

  • 8/8/2019 07 Pavement Mgt System

    9/22

    Inventory

    Street Name (block - to & from)

    Length, width, area Type of pavement (asphalt, concrete, etc.)

    Rank (arterial, collector, residential, bus

    route) Last const. date

    Zones

    Other Items

  • 8/8/2019 07 Pavement Mgt System

    10/22

    Sections

    W

    I

    N

    C

    H

    E

    S

    T

    E

    R

    R

    D

    1

    2

    4

    5

    3

    6

    SM

    I T H

    R

    D

    Numbered: West to East & South to North

  • 8/8/2019 07 Pavement Mgt System

    11/22

    Inspections ASTM (American Society for Testing and Materials)

    Objective Distresses

    Severity

    Quantity Feet on the ground

    Data must be correct Training & Dedication is

    essential Micro PAVER produces a PCI (Pavement Condition

    Index) 0 to 100

  • 8/8/2019 07 Pavement Mgt System

    12/22

    Inspection Procedure(Alligator cracking)

  • 8/8/2019 07 Pavement Mgt System

    13/22

    Reporting, Analyzing, Planning

    Graphs, Bar charts, Maps Where you are now

    Where you can be

    Where you will be

    How to get there

    Funding Value of Preventive Maintenance

  • 8/8/2019 07 Pavement Mgt System

    14/22

    $ Savings Utilizing a Pavement Management System

    will save a minimum of 10 %.

  • 8/8/2019 07 Pavement Mgt System

    15/22

    Pavement Deterioration

    $1.00 for preventivemaintenance here . . .

    $5 to $7 for SevereMaintenance Repairhere or severalyears of potholepatching if money

    is short !

    Excellent

    Condit

    ion

    Age

    Failed

  • 8/8/2019 07 Pavement Mgt System

    16/22

    Preventive Maintenance

    $80,000 * 6 years * $700,000

  • 8/8/2019 07 Pavement Mgt System

    17/22

    If Only

    Move themoney spenthere to hereonly less !!

    & again

    Age

    Condition

    & again

    Call line

    Probably not much more than acouple of years of patching

  • 8/8/2019 07 Pavement Mgt System

    18/22

    Micro PAVER Provides A Plan that can be explained

    Documentation to support the Plan

    Reinspection to confirm the Plan is on

    track and working Objective before and after comparisons

    (responsibility)

    A format to test new ideas

  • 8/8/2019 07 Pavement Mgt System

    19/22

    Micro PAVER vs Dump Truck (or resurfaced

    street)

    The Micro PAVER is an investment in a new

    way of solving problems. It provides the documentation to direct and

    justify decisions to provide savings.

    This is an investment into having a better streetsystem.

    The dump truck or resurfacing is gone in severalyears with minimal lasting benefit for the system.

  • 8/8/2019 07 Pavement Mgt System

    20/22

    When Funding is short The Best decisions need to be made

    Best treatment - best street - best time More Documentation is needed for

    reasonable explanations More public inquires are a certainty

    Illustrations of just what is the result willprovide sooner refunding

    Be Proactive (somethingcan be done)

  • 8/8/2019 07 Pavement Mgt System

    21/22

    Micro PAVERcan produce

    A listing of Streets to be Treated in the next 3 5 years.

    Understanding that there are variables that

    could modify the list (up or down). Funding, severe weather, material costs, changing

    traffic patterns

    The list will include: Preventive maintenance, routine maintenance and

    severely deteriorated street repairs (good, fair & bad)A Balanced Program