  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    1/16

    1

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    PCM 600 Application Configuration CAP 531

    Substation Automation andProtection Training

    3

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Application Configuration CAP 531

    CAP 531 IS THE MASTER TOOL!

    You MUST start t he engineering from CAP 531. Af ter COMPILING the graphic conf iguration, CAP 531 passesIMPORTANT INFORMATION to other subtools:

    PCM 600 receives the li st o f used funct ionsSMT receives the lis t of hardware cards and used virt ual I/OGDE receives the used co ntrol and measurement blocks

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    2/16

    4

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Application Configuration CAP 531

    In CAP 531 the application configuration is drawn withoutcons idering the hardware set-up of the IED.

    The association VIRTUAL I/O PHISICAL I/O is done in SIGNALMATRIX

    5

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Application Configuration CAP 531

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    3/16

    6

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    ONLINE / UPLOAD OPTIONS

    IF YOU HAVE THE IED connected to the PC, the fastest way to get the PCfunction library synchronized with the IED library is to run Upload Options :

    BEFORE UPLOAD OPTIONS:PC contains m ore funct ions than IED

    AFTER UPLOAD OPTIONS:PC contains the same functions than IED

    CAP 531 On Line Software Library Synchronization

    7

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    EDIT / FUNCTION SELECTOR

    CAP 531 On Line Software Library Synchronization

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    4/16

    8

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CAP 531 Draw the Configuration

    9

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Select the terminal and choose the menu Edit / Insert:

    Enter the name of the work sheet

    CAP 531 Insert a Work Sheet

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    5/16

    10

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Choose the menu Object / Function Block :

    CAP 531 Insert Function Blocks

    11

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    In the window choose the correct function block and click on Ok.

    The function block will appear on your work sheet.

    CAP 531 Insert Function blocks

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    6/16

    12

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Click on the button and start connecting the signals

    CAP 531 Connect Function Blocks

    13

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    This configuration:Is equivalent to this one:

    CAP 531 Variables

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    7/16

    14

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CROSS REFERENCES

    If you want a variable to becross-referenced in

    CAP print-out, just dragthe variable to crossthe red dashed lineshown by CAP 531when you choose themenu Layout / PageBorders.

    Cross Referenced VariablesNOT Cross Referenced Variables

    CAP 531 Cross Referenced vs Not Cross Referenced

    15

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    Zoom Out

    Zoom In

    Select Zoom Area

    Select Mark Mode

    Select Drawing Mode Free Text

    Insert Function Block

    Create Variable

    CAP 531 Graphic Buttons

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    8/16

    16

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CAP 531 CAD Features

    17

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CAP 531 Insert a Template

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    9/16

    18

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    With CAP 531 you have the possibility to associate a page layoutto your drawing with all the important data:

    - customer name- issue date- drawing number- etc.

    It is also possible to customize the page layout according to yourcustomer needs.

    CAP 531 Page Layout

    19

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    From Page Preview you can see how the drawing will be printed out:

    CAP 531 Page Layout

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    10/16

    20

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    When the Application Configuration isready you have to compile it

    Note: The Graphic Application

    Configuration does not contain anyInput/Output information. It onlycontains VIRTUAL I/O information!

    CAP 531 Compiling the Configuration

    21

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    The successful ly compiledconfiguration can be downloadedinto the IED:

    CAP 531 Downloading the Configuration

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    11/16

    22

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    1) Secret Upload Options (reading)

    2) Download of operative configuration (writing)

    CAP 531 Downloading Phase

    23

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    3) Uploading of configuration (reading)

    4) Comparing PC configuration against uploaded one

    CAP 531 Downloading Phase

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    12/16

    24

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    5) If Compare is not Ok you are requested to download again

    6) If Compare is Ok :Download of graphic information of configuration(the so called zip file) (writing)

    CAP 531 Downloading Phase

    25

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    When you exit CAP 531 containing a successfully compiledconfiguration, the list of used functions is associated to yourIED in PCM 600 structure.

    CAP 531 Exit CAP531 and go back to PCM 600

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    13/16

    26

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    UPLOAD THE CONFIGURATION

    You can upload the graphic configuration from the terminal into the PC.

    CAP 531 Uploading application configuration from IED

    27

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    COMPILE and EXIT CAP531!

    CAP 531 Uploading application configuration from IED

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    14/16

    28

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    This happens while you exit CAP531:

    CAP 531 Uploading application configuration from IED

    29

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CAP 531 has the possib ility to compare the configuration locatedinto the PC with the configuration stored into the terminal.

    This process is very useful to check if the configuration stored inthe terminal is the same configuration which was downloaded

    during the commissioning or during the last download.

    CAP 531 Compare Configurations

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    15/16

    30

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    If these two different configurations wil l be compared, a windowwith the list of dif ferences will be produced:

    CAP 531 Compare Configurations

    31

    A B B P o w e r

    T e c

    h n o

    l o g

    i e s

    A B

    , 2 0 0 7

    2007-09-07 Substation Automation and Protection Training

    CAP531 On-line/Debug

  • 8/13/2019 04 SEP-601 PCM 600_1p5_CAP_531

    16/16