This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NO. CUSTOMER CONTRACT LOCATION PRODUCT YEAR OF MATERIAL OF PRODUCT CONDITIONTYPE STREAM INSTALLATION CONSTRUCTION Flow Rate Design Design PURASPEC Volume Hg Removal
Pressure Temperature Type (m3)
1 OWNER / CLIENT : EPCC Kertih Refinery, Light Naptha July 2010 Carbon Steel 340 m3/hr 19.6 barg 200/ 20 deg C 5158 68 Inlet < 25 ppb(wt)PETRONAS PENAPISAN Terengganu Outlet < 1 ppb (wt)(TERENGGANU) SDN BHD
2 OWNER : EPC PM329 East Piatu Natural Gas Sept 2011 Duplex 32.44 mmscfd 45.5/FV barg 93/ -29 deg C 1163 6 Inlet 600 ug/Nm3NEWFIELD PENINSULA Offshore Platform Outlet <1 ug/Nm3MALAYSIA INC.MAIN CONTRACTOR:KENCANA HL SDN BHDSUB-CONTRACTOR:JET ALLIED SDN BHD
3 OWNER/CLIENT FEED Paritutu Tank Farm NGL July 2012 Carbon Steel 60 m3/hr 127.6 barg 38/ -5 deg C 5158 5.5 Inlet 3-6 ppb(wt)SHELL TODD OIL New Plymouth Outlet < 1 ppb (wt)SERVICES New Zealand(New Zealand)
PROJECT : PETROCHEMICAL NAPHTHA TREATING UNIT (MERCURY REMOVAL)
CLIENT : PETRONAS PENAPISAN (TERENGGANU) SDN BHD
LOCATION : KERTIH AROMATICS MALAYSIA SDN BHD, KERTIH TERENGGANU
CONTRACT COMPLETION PERIOD : MAY 2009 - JULY 2010
DIALOG E & C SDN BHD
DIALOG
Design, supply, fabricate, installation and precommisioning: BASE PRODUCT- 6 units of Pressure Vessels c/w platforms & ladders CAPACITY: ie Feed Surge Drum, Prefilter, Coalescer, Afterfilter and Absorber. DESIGN PRESSURE:- Fireproofing of Vessel Skirts and Steel Columns DESIGN TEMPERATURE:- 2 units of Centrifugal Pumps CATALYST PROVIDER- One Closed System Sampling Connections Cabinet CATALYST TECHNOLOGY- Structural Steel works(24 tons) MERCURY REMOVAL SPEC.- Piping works (4220 dia-inches)- Underground Piping for DOC (Oil Contaminated Drain)- Electrical & Instrumentation works including DCS upgrade. (E & I cable runs 4880 meter) PECO PREFILTER- 9 Tie In Points including one 10"/ 30" hot tap branch. PECO COALESCER Down to 15ppm (wt) or 10 ppm (v) H2O- Supply and loading of Mercury Removal Absorbent (Puraspec) PECO AFTERFILTER- Estimated Project Manhours - 145,000 m-hr
LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM
EPC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEMHYDROCARBON GAS
29 tons / 37.5 tons (Empty/Operating)7.5m X 4m x 9 m(L X W X H)
PROJECT : NATURAL GAS LIQUID (NGL) MERCURY REMOVAL UNIT
CLIENT : SHELL TODD OIL SERVICES (NEW ZEALAND)
LOCATION : PARITUTU TANK FARM
CONTRACT COMPLETION PERIOD : MAY 2012 - JUNE 2012
DIALOG E & C SDN BHD
DIALOG
FEED Development of: BASE PRODUCT- 3 units of pressure vessels c/w platforms & ladders SKID DIMENSION ie Pre-Filter, Coalescer & Absorber WEIGHT- One Closed Gas Sampling System CAPACITY: - Structural Steel works DESIGN PRESSURE: 127.6 barg- Piping works DESIGN TEMPERATURE: 38/ -5 deg C- 4 piping tie in points CATALYST JOHNSON MATTHEY CATALYST- Supply and loading of Mercury Removal Absorbent (PURASPEC) MERCURY REMOVAL SPEC. from 3-6 ppb (wt) to <1 ppb (wt)