    FUSIBLE PVC PIPE IN

    MUNICIPAL APPLICATIONS

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    2/17

    PVC Pipe in municipal infrastructures

    Over 50 years in serviceacross North America.

    The number one choice ofpipe material for waterworks

    applications in Canada.

    DurableNon-corrosive

    Proven performance

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    3/17

    Trenchless Technologies

    Pipe Bursting

    Directional Drilling

    Slip Lining

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    4/17

    Trenchless Technologies Pipe Requirements

    Fully restrained jointFlexibility

    Abrasion resistanceCompatibility

    Easy to maintain

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    5/17

    PVC Pipe Evolved

    Fusible PVC is the nextstep in the evolution of PVC

    pipes to adapt to the newTrenchless environment; allthe benefits of PVC plus:

    Fully restrained jointHigh tensile strengthHigh resistance tocontaminants

    Small OD to ID ratio,providing for smaller boreholes

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    6/17

    The next step in evolution

    Fusible PVC pipe meets thesame standards as the regularbell and spigot pipes:

    CSA B137.3AWWA C900/C905NSF 61

    Fusion is performed by trainedqualified technicians using apatented fusion process

    (2,529,412)

    J oints are recorded and

    documented for traceability

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    7/17

    Case studies

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    8/17

    New supply waterline Edmonton, AB

    Project info:2000m of 300mm DR18

    Consultant:

    Stantec, Edmonton

    General Contractor:

    Eveready Drilling, Edmonton

    Challenges:

    Extreme coldLimited work space

    Installation method:

    Directional drilling

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    9/17

    New waterline Port of Montral, QC

    Project info:60m of 150mm DR181050m of 200mm DR18Consultant:

    BPR, BouchervilleGeneral Contractor:

    Transelec Common, Laval

    Challenges:Contaminated soilLimited disturbance to the siteoperations

    Several railroad crossings

    Installation method:

    Directional drilling

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    10/17

    New supply waterline St-Paulin, QC

    Project info:2208m of 100mm DR252611m of 150mm DR18

    Consultant:Teknika HBA, J oliette

    General Contractor:

    Forage Loiselle, St-Thimot

    Challenges:

    Limited disturbance to the residents

    Parallell pulls

    Installation method:

    Directional drilling

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    11/17

    A/C waterline replacement Richmond BC

    Project info:476m 200mm DR18

    Consultant:

    City of Richmond

    Contractor:

    Ulmer Contracting

    Challenges:

    Minimal disruption to the siteTight schedule

    Compatibility

    Installation method:

    Directional drilling

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    12/17

    A/C waterline replacement Richmond BC

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    13/17

    Slip lining a steel pipe Edmonton, AB

    Project info:86m of 400mm DR25

    Consultant:

    EPCOR, Edmonton

    General Contractor:

    Eveready Drilling, Edmonton

    Challenges:

    Slip lining a 20steel pipeTight working conditions

    Installation under a railway

    Installation method:

    Slip lining

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    14/17

    Slip lining a steel pipe Edmonton, AB

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    15/17

    Pipe Bursting Halton, ON

    Projects info:610m of 200mm DR14183m of 200mm DR14

    Consultant:City of Halton

    General Contractor:

    Marathon DrillingAvertex

    Installation method:

    Pipe Bursting

  • 8/22/2019 03 IPEX Fusible NASTT Mississauga

    16/17

    Fusible PVC in numbers

    Over 1,000 projects completedOver 1,000,000m installedOver 82,000 joints fused in the fieldLongest HDD installation: 1,950m of 400mmFPVC DR25

    Largest Fusible PVC pipe installed: 900mmDR41