  • KAIZEN IDEA - SHEET

    Scope & plan for Horizontal Deployment :

    Sl. No. M/c No.Target Dt.Responsibility Status

    16 m/cs Jan 2000 BK Jha Completed

    Problem/present Status :Frequent break-down of MG welding machine (1304)(Average 4/month) due to failure of wire feeder

    Kaizen Theme :Reduction of Break-down in welding

    Bench mark4 brush set/monthTarget0Kaizen startNovember 1999Kaizen FinishNovember 1999

    Team members : B K Jha4. R K Yadav2. R B Yadav3. R Dhaiya

    Result:

    Analysis :Why 1:Feeder motor not workingWhy 2:No power supply to armature of motorWhy 3:DC motors carbon contact brush found worn out and carbon deposited on commutatorWhy 4 :Sparking at roating contact while operating and specially while breakingWhy 5:Brush is operating at high voltage and reverse current is applied while breaking

    Idea : To provide DC Motor in wire feeder with low operating voltage and to provide breaking with permanent magnet

    Bharat Seats Limited

    Countermeasures :System changed to low voltage supply and breaking by permanent magnet has reduced break down and brush consumption to zero for 3 years

    BenefitsEquipment failure reduced from 4 / month to 0Saving in time loss = 80 min./machine/monthProductivity increased = 133 component/ machineCarbon brush saved per month = 50 setsSaving= Rs 110 x 50= Rs 5500 per month/machine

    110 volts DC current

    Breaking by ReverseDC Current

    Field Magnetism byDC Current

    Brush Consumption

    Equipment Failure

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 2SETUP & ADJUSTMENT LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Set Up time reduction

    Sheet1

    PU: Foundry. REF NO:-KAIZEN SHEET

    CELL: Core Room

    LOSS : Set up

    Kaizen Theme :Idea :

    Problem / present Status:Counter Measure:Bench Mark

    Spacers and studs - 4 nos each and various washers required for ejector plate set up1. Std size spacers are welded to ejector plate. 2. Reinforcement to ejector plate to avoid warpage elliminating use of washers. 3. Use of small bolts in stead of long studs.Target

    Start

    Kaizen Finish

    Team Members :

    1.4.

    2.5.

    3.6.

    Benefits:(Mention in PQCDSM as applicable)

    Analysis :Result :

    Set up time is more

    Removal, fixing and adjustment time more

    Dismentling and assembly time more asHORIZONTAL DEPLOYMENT

    number of parts are morePUM/C NO.PUM/C NO.

    Sheet1 (2)

    PU: Foundry. REF NO:-KAIZEN SHEET

    CELL: Core Room

    LOSS : Set up

    Kaizen Theme :Idea :

    To reduce set up time for ejector plate from 60 mins to 10 mins per occuranceRe design upper ejector plate

    Problem / present Status:Counter Measure:Bench Mark60 minutes

    Spacers and studs - 4 nos each and various washers required for ejector plate set up1. Std size spacers are welded to ejector plate. 2. Reinforcement to ejector plate to avoid warpage elliminating use of washers. 3. Use of small bolts in stead of long studs.Target10 minutes

    StartJan-00

    Kaizen FinishMar-00

    Team Members :

    1.Satish Sohoni4.Pramod Bhagat

    2.Amar Patil5.Murdeshwar

    3.Lalit Sedani6.

    Benefits:(Mention in PQCDSM as applicable)

    1Increase in output by 3 nos. per day

    2Reduction in consumption of washers

    Analysis :Result :3Reduction on cost of long studs

    Set up time is more90

    80

    70

    Removal, fixing and adjustmentTime in Minutes60

    time more50HORIZONTAL DEPLOYMENT

    40PUM/C NO.PUM/C NO.

    Dismentling and assembly time more30

    as number of parts are more20Foundry22/1

    Ejector plate gets warped due to heat10Foundry22/2

    JFMAMJJASFoundry22/3

    Faulty designMonths

    90

    80

    7070

    6060

    5050

    4040

    3030

    2020

    1010

    JFMAMJJASONJFMAMJJAS

    N

    Sheet2

    90

    80

    70

    60

    50

    40

    30

    20

    10

    JFMAMJJASON

    Sheet3

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Sheet1

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea :CHANGE THE DESIGN OF ALLEN KEY AND USE BOLT RUNNER FOR

    TIME ON RACK TEETH BROACHING M/CTIGHTNING AND LOOSENING OF BOLTS(39 Nos.)

    Problem / present StatusCounter measure :Bench mark1490 SEC.

    Target700 SEC.

    Start1/5/01

    Kaizen Finish6/5/01

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :

    BROACH ASSEMBLING AND DIS-

    Analysis :Result :ASSEMBLING OF BOLTS

    WHY: BOLTS LOOSENING AND TIGHTNING TIME ISBEFORE1490

    HIGHAFTER700

    :OPERATOR HAS TO OPEN AND CLOSE 39 BOLTS

    WHILE CHANGE OVER

    : ALLEN KEY DESIGN CHANGED AND BOLT RUNNER

    PROVIDED ON LINEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea :CHANGE CHIP TRAY CLAMPING SYSTEM FROM HEX BOLTS TO

    TIME ON RACK TEETH BROACHING M/CPIN TYPE LOCKING

    Problem / present StatusCounter measure :Bench mark60 Secs.

    Target10 Secs.

    Start17/5/2001

    Kaizen Finish17/5/2001

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :BEFORE60

    NO NEED OF OPENING BOLTSAFTER10

    Analysis :Result :TIME SAVED 50 Secs.

    HIGH TIME FOR CHANGING THE CHIP TRAY ON

    BROACHING M/C

    WHY:

    BECAUSE THE CHIP TRAY IS MOUNTED BY BOLTS

    WHICH REQUIRES HIGH TIME FOR TIGHTNING ANDScope & plan for Horizontal Deployment :

    RETIGHTNINGSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE THE SETUP TIMEIdea : PROVIDE A RATCHET AND SOCKET ON LINE TO REDUCE BOLT LOOSEN-

    ON XLO CASE GEAR LINEING AND TIGHTENING TIME

    Problem / present StatusCounter measure :Bench mark10 MINS

    Target4 MINS

    Start4.6.01

    Kaizen Finish4.6.01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :BOLTS LOOSENING AND TIGHTENING

    WHY BOLTS LOOSENING AND TIGHTENING TIME IS HIGHTIME REDUCED

    : ALLEN KEY AND PIPE TAKES MORE TIME TO

    LOOSEN & TIGHTEN THE BOLTS

    : PROVIDE A RACHET & SOCKETScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE PLACE FOR KEEPING BROACH ON LINE

    Problem / present Status : NON AVAIL-Counter measure : PLACE PROVIDED FORBench mark210 Secs.

    ABILITY OF RESHARPENED BROACHKEEPING BROACH SET ON LINETarget120 Secs.

    Start17/3/2001

    Kaizen Finish20/3/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN DOWN TIME

    Analysis :Result :FROM 210 SEC TO 120 SEC

    THERE WAS NO FIXED PLACE ON LINE FOR BROACHREDUCTION IN DOWN TIME DUE TO NON-AVAILABILITY

    SET (OF HORIZONTAL BROACHING M/C)OF RESHARPENED BROACH

    BEFORE10

    AFTER4

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE CHANGE-OVERIdea : PROVIDE SPL NUT & BOLT, TO AVOID USAGE OF ALLEN KEY FOR TIGHTENING

    TIME ON XLO-IAND LOOSENING OF ALLEN BOLTS

    Problem / present StatusCounter measure :Bench mark5 Mins.

    Target1-Mins

    Start4/6/01

    Kaizen Finish8/6/01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN CHANGE OVER

    Analysis :Result :BY 4 MIN

    WHY :

    SPECIAL BOLT & NUT ARE REQUIREDCHANGE OVER TIME

    - IT IS HARD TO LOOSEN AND TIGHTEN THE ALLENBEFORE210

    BOLTAFTER120

    - HAND TOOLS ARE REQUIRED. SO TO ELIMINATEScope & plan for Horizontal Deployment :

    THIS PROVIDE SPECIAL BOLT & NUTSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : PUT A TROLLEY UNDER CHIP AND COOLANT TRAY SO THAT

    OVER TIME ON RACK TEETH BROACHINGREMOVAL OF TRAY SHOULD BE EASY

    Problem / present StatusCounter measure :Bench mark310 Secs.

    Target140 Secs.

    Start15/5/2001

    Kaizen Finish19/5/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    TROLLEY REMOVAL AND

    Analysis :Result :FIXING TIME REDUCED

    WHY : CHANGE OVER ON BROACHING M/C TO BEBY 170 Secs.

    REDUCED

    : DUE TO HIGH CHANGEOVER TIME ON M/CBEFORE5

    : OPERATOR HAS TO USE CHAIN PULLEY FORAFTER1

    REMOVAL OF TRAY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : PROVIDE EYE HOLE

    FOR BOLT LOOSENING / TIGHTENING

    Problem / present StatusCounter measure :Bench mark220 Secs.

    Target45 Secs.

    Start1/12/00

    Kaizen Finish3/12/00BEFORE310

    AFTER140

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :175 SEC TIME REDUCED FOR

    WHY TAKES MORE TIME TO LOOSENING &CHANGEOVER

    TIGHTENING OF BOLTS

    FULL BOLTS HAVE TO BE REMOVED DUE TO

    NO EYE HOLEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE T-SLOTS ON THE MACHINE BED & UPPER CLAMPING PLATE

    COL SHAFT INJ. MOULDING M/COF MACHINE

    Problem / present StatusCounter measure :Bench mark30 Mins.

    HIGH C/O TIME ON COL. SHAFT INJ MOULDING M/CT-SLOTS PROVIDED ON M/C BED & UPPER CLAMPINGTarget23 Mins.

    PLATE. NOW CLAMPING BY T-BOLTSStart16/4/2001

    Kaizen Finish23/4/2001

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    Benefits :

    SAVING IN C/O TIME

    Analysis :Result :BY 7-MINS

    THERE ARE TAPPED HOLES ON M/C BED & UPPERSAVING IN C/O TIME

    PLATE FOR CLAMPING THE MOULD. THE THREADSBEFORE220

    INSIDE THREE HOLES WASHED OUT. IF ONE BOLT ISAFTER45

    SLIPPING WHILE TIGHTENING THEN OPERAOR TRY

    TO USE OTHER HOLE OR BIG LENGTH BOLT

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : MODIFICATION OF RUNNER PLATE BY PROVIDING CHAMFER

    PLATE

    Problem / present StatusCounter measure :Bench mark20 Secs.

    Target10 Secs.

    Start19/12/2000

    Kaizen Finish19/12/2000

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    RAKESH GARG

    Benefits :

    Analysis :Result :

    WHY TAKE MORE TIME TO PUT RUNNER PLATE10 SEC TIME REDUCED FORBEFORE30

    ON CAVITYCHANGEOVERAFTER23

    NO CHAMFER ON RUNNER PLATE & ACTIVITY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE A HOLE IN THE BOTTOM OF THE HOOPER, TO TAKE THE

    OF MATERIAL REMOVAL FROM HOOPERMOULDING MATERIAL OUT.

    Problem / present StatusCounter measure :Bench mark8 Mins.

    MATERIAL IN THE HOOPER WAS DRAINED OUT BYHOLE IS PROVIDED IN THE BOTTOM OF THE HOOPERTarget2 Mins.

    OPERATING THE M/CWITH SHUTTER. NOW MATERIAL IS REMOVEDStart2/4/01

    MANUALLYKaizen Finish2/4/01

    Team members :

    CHINTESH

    KIRORI

    SATYAWAN

    Benefits :

    NO WASTAGE OF MATERIAL

    Analysis :Result :COST SAVING : Rs 1500/YEARBEFORE20

    AFTER10

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO WELD WITH SCREWS TO AVOID USE OF ALLEN KEY WHILE LOOSENING

    WHILE CHANGEOVER& TIGHTENING OF SCREWS

    Problem / present StatusCounter measure :Bench mark3- Mins.

    WHILE CHANGEOVER WASTAGE OF TIME IN LOOSEN-T-HANDLES ARE WELDED WITH SCREWSTarget1 Min

    ING & TIGHTENING OF CLAMPING SCREWS OF DOGS,Start24/4/2001

    FOR MOULD SETTING OF INJECTION MOULDINGKaizen Finish27/4/2001

    MACHINES

    Team members :

    SATISH GUPTA

    HARISH PAHUJA

    CHINTESH

    Benefits :

    Analysis :Result :CHANGEOVER TIME REDUCTION

    ALLEN KEYS WERE BEING USED IN LOOSENING &REDUCTION IN DOWNTIME WHILE CHANGEOVER2 MIN / CHANGEOVERBEFORE8

    TIGHTENING OF DOG SCREWSAFTER2

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE FIXED PLACE FOR PARTICULAR MODEL FIXTURE PART

    TIME ON INJ. MOULDING MACHINENEAR TO OPERATOR

    Problem / present StatusCounter measure :Bench mark3 Mins

    WASTAGE OF TIME WHILE CHANGEOVER ON INJ.FIXED PLACE PROVIDED FOR FIXTURES OF DIFFERENTTarget0

    MOULDING M/C.MODELS WITH THE M/CStart12/4/01

    Kaizen Finish15/4/2001

    Team members :

    CHINTESH

    SATYAWAN

    LAXMAN

    Benefits :

    OPERATIVES TIME IN SEARCHING &

    Analysis :Result : NO WASTAGE OF TIME IN SEARCH-BRINGING REQUIRED MODEL

    FIXTURE OF DIFFERENT MODELS ARE PLACED ON AING OUT FIXTURE PARTS OF PARTICULAR MODELFIXTURE PART SAVED

    TABLE OUTSIDE THE LINE. WASTAGE OF TIME IN: OPERATIVE'S TIME OF BRINGING FIXTUREBEFORE3

    SERARCHING OUT FIXTURE OF PARTICULAR MODELPARTS FROM TABLE OUTSIDE THE LINE, SAVEDAFTER1

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : Provide special T-allen key

    over Time

    Problem / present StatusCounter measure :Bench mark20'

    Target16'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 4 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    BEFORE3

    Scope & Plan for Horizontal DeploymentAFTER0

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : REDUCE LENGTH OF BOLT

    Problem / present StatusCounter measure :Bench mark30'

    Target25'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Vipinder

    Benefits :

    Bolt's size : M8*25Bolt's size : M8*15

    Analysis :Result :Changeover time reduced by 5'

    No. of such Changeover parts = 3

    No. of Bolts/ parts = 2

    Total Bolts = 6

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Before20

    SonaAfter16

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Problem / present StatusCounter measure :Bench mark25'

    Target18'

    Start22/05/01

    Kaizen Finish22/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 7 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE SET UP TIMEIdea : COMMON MOULD TO BE USED BY REPLACING PARTS ONLY

    ON C-67 INJECTION MOULDING M/C

    Problem / present StatusCounter measure :Bench mark1480 Secs.

    Target415 Secs.

    Start10/9/00

    Kaizen Finish3/10/00

    Team members :

    RAKESH GARG

    G.R. YADAV

    MANOJ SHARMA

    S.K.GUPTA

    CHINTESHBEFORE1480

    MOULD WAS REPLACED FOR SET UPONLY REST BLOCKS ARE CHANGED FOR SET UPAFTER415

    Benefits :

    Analysis :Result :OPERATOR'S FATIGUE REDUCED

    SET UP TIME IS MORESET UP TIME REDUCED

    BY 1065 Secs.

    WHY:Scope & Plan for Horizontal Deployment

    BECAUSE DIFFERENT MOULDS ARE USED FORSr.No.M/c No.Target Dt.ResponsibilityStatus

    DIFFERENT MODELS

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : REDUCE NO. OF BOLTS & NO. OF TURN FOR TIGHTENING OF REST

    REPLACING THE BLOCKBLOCK

    Problem / present StatusCounter measure :Bench mark5 MIN.

    Target2 MIN.

    Start10/6/01

    Kaizen Finish13/6/2001

    Team members :

    RAKES GARGBEFORE5

    SATISH GUPTAAFTER2

    Benefits :

    Result :C/O TIME REDUCED BY 3 MIN.

    Analysis :

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : USE ONLY ONE OPERATOR INSTEAD OF TWO ON CASE GEAR LINE

    OF CASE GEAR MACHINING LINE

    Problem / present StatusCounter measure :Bench mark2

    Target1

    Start27/05/2001

    Kaizen Finish29/5/2001

    Team members :

    MANOJ SHARMA

    GR YADAV

    V SETHI

    R BAJAJ

    CHINTESH

    Benefits :

    SAVED ONE OPERATOR PER SHIFT

    Analysis :Result :

    WHY : WHY SHOULD WE PUT ONLY ONE OPERATOR

    IN PLACE OF TWO OPERATORSSAVING IN MANPOWER PER SHIFT

    BEFORE2

    WE CAN PUT TUBE PRESSING M/C ON ASSY LINEAFTER1

    BECAUSE ASSY LINE OPERATOR HAS ENOUGH

    TIME TO DO THIS OPERATIONScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : CHANGE LINE LAYOUT

    ON COLL. COLUMN LINE

    Problem / present StatusCounter measure :Bench mark40 Pcs/Hr

    Target46 Pc/Hr

    Start28/8/2000

    Kaizen Finish31/8/2000

    Team members :

    Benefits :

    Analysis :Result :PRODUCTION PER HOUR

    WHY : WHY LESS PRODUCTION ON LINEINCREASED

    ALL M/Cs STOP DUE TO B/DOWN ON ANY M/CPRODUCTION PER HOUR

    BEFORE40

    AFTER46

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sheet1

    1

    Sheet2

    Sheet3

    TIME IN MIN.

    20

    16

    Time in Minute

    Changeover Time at Chamfering Station

    Time in Minute

    Time in Minute

    5

    2

    TIME(IN MIN.)

    REDUCTION IN C/O

    40

    46

    * PLAIN HOLES WERE PRESENT IN THE BLOCK DUE TO WHICH FULL TIGHTENING OF BOLTS WAS REQUIRED

    * PLAIN HOLES OF THE BLOCK MODIFIED TO EYES HOLES AS SHOWN, BY WHICH NO. OF TURNS OF HOLES WERE REDUCED

    R/M

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    TUBE PRESSING

    TROLLEY

    1

    2

    F/M

    R/M

    2

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    F/M

    BEFORE

    AFTER

    2

    1

    MBD0021B15E.xls

    MBD0021C9A0.xls

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 3TOOL & JIG CHANGE LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Sheet1

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme :TO REDUCE HIGH C/OVERIdea :CHANGE THE DESIGN OF ALLEN KEY AND USE BOLT RUNNER FOR

    TIME ON RACK TEETH BROACHING M/CTIGHTNING AND LOOSENING OF BOLTS(39 Nos.)

    Problem / present StatusCounter measure :Bench mark1490 SEC.

    Target700 SEC.

    Start1/5/01

    Kaizen Finish6/5/01

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :

    BROACH ASSEMBLING AND DIS-

    Analysis :Result :ASSEMBLING OF BOLTS

    WHY: BOLTS LOOSENING AND TIGHTNING TIME ISBEFORE1490

    HIGHAFTER700

    :OPERATOR HAS TO OPEN AND CLOSE 39 BOLTS

    WHILE CHANGE OVER

    : ALLEN KEY DESIGN CHANGED AND BOLT RUNNER

    PROVIDED ON LINEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme :TO REDUCE CHANGE OVERIdea :CHANGE CHIP TRAY CLAMPING SYSTEM FROM HEX BOLTS TO

    TIME ON RACK TEETH BROACHING M/CPIN TYPE LOCKING

    Problem / present StatusCounter measure :Bench mark60 Secs.

    Target10 Secs.

    Start17/5/2001

    Kaizen Finish17/5/2001

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :BEFORE60

    NO NEED OF OPENING BOLTSAFTER10

    Analysis :Result :TIME SAVED 50 Secs.

    HIGH TIME FOR CHANGING THE CHIP TRAY ON

    BROACHING M/C

    WHY:

    BECAUSE THE CHIP TRAY IS MOUNTED BY BOLTS

    WHICH REQUIRES HIGH TIME FOR TIGHTNING ANDScope & plan for Horizontal Deployment :

    RETIGHTNINGSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE THE SETUP TIMEIdea : PROVIDE A RATCHET AND SOCKET ON LINE TO REDUCE BOLT LOOSEN-

    ON XLO CASE GEAR LINEING AND TIGHTENING TIME

    Problem / present StatusCounter measure :Bench mark10 MINS

    Target4 MINS

    Start4.6.01

    Kaizen Finish4.6.01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :BOLTS LOOSENING AND TIGHTENING

    WHY BOLTS LOOSENING AND TIGHTENING TIME IS HIGHTIME REDUCED

    : ALLEN KEY AND PIPE TAKES MORE TIME TO

    LOOSEN & TIGHTEN THE BOLTS

    : PROVIDE A RACHET & SOCKETScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : REDUCTION IN DOWN TIMEIdea : TO PROVIDE PLACE FOR KEEPING BROACH ON LINE

    Problem / present Status : NON AVAIL-Counter measure : PLACE PROVIDED FORBench mark210 Secs.

    ABILITY OF RESHARPENED BROACHKEEPING BROACH SET ON LINETarget120 Secs.

    Start17/3/2001

    Kaizen Finish20/3/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN DOWN TIME

    Analysis :Result :FROM 210 SEC TO 120 SEC

    THERE WAS NO FIXED PLACE ON LINE FOR BROACHREDUCTION IN DOWN TIME DUE TO NON-AVAILABILITY

    SET (OF HORIZONTAL BROACHING M/C)OF RESHARPENED BROACH

    BEFORE10

    AFTER4

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE CHANGE-OVERIdea : PROVIDE SPL NUT & BOLT, TO AVOID USAGE OF ALLEN KEY FOR TIGHTENING

    TIME ON XLO-IAND LOOSENING OF ALLEN BOLTS

    Problem / present StatusCounter measure :Bench mark5 Mins.

    Target1-Mins

    Start4/6/01

    Kaizen Finish8/6/01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN CHANGE OVER

    Analysis :Result :BY 4 MIN

    WHY :

    SPECIAL BOLT & NUT ARE REQUIREDCHANGE OVER TIME

    - IT IS HARD TO LOOSEN AND TIGHTEN THE ALLENBEFORE210

    BOLTAFTER120

    - HAND TOOLS ARE REQUIRED. SO TO ELIMINATEScope & plan for Horizontal Deployment :

    THIS PROVIDE SPECIAL BOLT & NUTSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE HIGH CHANGE-Idea : PUT A TROLLEY UNDER CHIP AND COOLANT TRAY SO THAT

    OVER TIME ON RACK TEETH BROACHINGREMOVAL OF TRAY SHOULD BE EASY

    Problem / present StatusCounter measure :Bench mark310 Secs.

    Target140 Secs.

    Start15/5/2001

    Kaizen Finish19/5/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    TROLLEY REMOVAL AND

    Analysis :Result :FIXING TIME REDUCED

    WHY : CHANGE OVER ON BROACHING M/C TO BEBY 170 Secs.

    REDUCED

    : DUE TO HIGH CHANGEOVER TIME ON M/CBEFORE5

    : OPERATOR HAS TO USE CHAIN PULLEY FORAFTER1

    REMOVAL OF TRAY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : REDUCTION OF NO. OF TURNSIdea : PROVIDE EYE HOLE

    FOR BOLT LOOSENING / TIGHTENING

    Problem / present StatusCounter measure :Bench mark220 Secs.

    Target45 Secs.

    Start1/12/00

    Kaizen Finish3/12/00BEFORE310

    AFTER140

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :175 SEC TIME REDUCED FOR

    WHY TAKES MORE TIME TO LOOSENING &CHANGEOVER

    TIGHTENING OF BOLTS

    FULL BOLTS HAVE TO BE REMOVED DUE TO

    NO EYE HOLEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE C/O TIME ONIdea : TO PROVIDE T-SLOTS ON THE MACHINE BED & UPPER CLAMPING PLATE

    COL SHAFT INJ. MOULDING M/COF MACHINE

    Problem / present StatusCounter measure :Bench mark30 Mins.

    HIGH C/O TIME ON COL. SHAFT INJ MOULDING M/CT-SLOTS PROVIDED ON M/C BED & UPPER CLAMPINGTarget23 Mins.

    PLATE. NOW CLAMPING BY T-BOLTSStart16/4/2001

    Kaizen Finish23/4/2001

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    Benefits :

    SAVING IN C/O TIME

    Analysis :Result :BY 7-MINS

    THERE ARE TAPPED HOLES ON M/C BED & UPPERSAVING IN C/O TIME

    PLATE FOR CLAMPING THE MOULD. THE THREADSBEFORE220

    INSIDE THREE HOLES WASHED OUT. IF ONE BOLT ISAFTER45

    SLIPPING WHILE TIGHTENING THEN OPERAOR TRY

    TO USE OTHER HOLE OR BIG LENGTH BOLT

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : QUICK FITMENT OF RUNNERIdea : MODIFICATION OF RUNNER PLATE BY PROVIDING CHAMFER

    PLATE

    Problem / present StatusCounter measure :Bench mark20 Secs.

    Target10 Secs.

    Start19/12/2000

    Kaizen Finish19/12/2000

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    RAKESH GARG

    Benefits :

    Analysis :Result :

    WHY TAKE MORE TIME TO PUT RUNNER PLATE10 SEC TIME REDUCED FORBEFORE30

    ON CAVITYCHANGEOVERAFTER23

    NO CHAMFER ON RUNNER PLATE & ACTIVITY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE MINOR STOPPAGEIdea : TO PROVIDE A HOLE IN THE BOTTOM OF THE HOOPER, TO TAKE THE

    OF MATERIAL REMOVAL FROM HOOPERMOULDING MATERIAL OUT.

    Problem / present StatusCounter measure :Bench mark8 Mins.

    MATERIAL IN THE HOOPER WAS DRAINED OUT BYHOLE IS PROVIDED IN THE BOTTOM OF THE HOOPERTarget2 Mins.

    OPERATING THE M/CWITH SHUTTER. NOW MATERIAL IS REMOVEDStart2/4/01

    MANUALLYKaizen Finish2/4/01

    Team members :

    CHINTESH

    KIRORI

    SATYAWAN

    Benefits :

    NO WASTAGE OF MATERIAL

    Analysis :Result :COST SAVING : Rs 1500/YEARBEFORE20

    AFTER10

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE DOWNTIMEIdea : TO WELD WITH SCREWS TO AVOID USE OF ALLEN KEY WHILE LOOSENING

    WHILE CHANGEOVER& TIGHTENING OF SCREWS

    Problem / present StatusCounter measure :Bench mark3- Mins.

    WHILE CHANGEOVER WASTAGE OF TIME IN LOOSEN-T-HANDLES ARE WELDED WITH SCREWSTarget1 Min

    ING & TIGHTENING OF CLAMPING SCREWS OF DOGS,Start24/4/2001

    FOR MOULD SETTING OF INJECTION MOULDINGKaizen Finish27/4/2001

    MACHINES

    Team members :

    SATISH GUPTA

    HARISH PAHUJA

    CHINTESH

    Benefits :

    Analysis :Result :CHANGEOVER TIME REDUCTION

    ALLEN KEYS WERE BEING USED IN LOOSENING &REDUCTION IN DOWNTIME WHILE CHANGEOVER2 MIN / CHANGEOVERBEFORE8

    TIGHTENING OF DOG SCREWSAFTER2

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE CHANGEOVERIdea : TO PROVIDE FIXED PLACE FOR PARTICULAR MODEL FIXTURE PART

    TIME ON INJ. MOULDING MACHINENEAR TO OPERATOR

    Problem / present StatusCounter measure :Bench mark3 Mins

    WASTAGE OF TIME WHILE CHANGEOVER ON INJ.FIXED PLACE PROVIDED FOR FIXTURES OF DIFFERENTTarget0

    MOULDING M/C.MODELS WITH THE M/CStart12/4/01

    Kaizen Finish15/4/2001

    Team members :

    CHINTESH

    SATYAWAN

    LAXMAN

    Benefits :

    OPERATIVES TIME IN SEARCHING &

    Analysis :Result : NO WASTAGE OF TIME IN SEARCH-BRINGING REQUIRED MODEL

    FIXTURE OF DIFFERENT MODELS ARE PLACED ON AING OUT FIXTURE PARTS OF PARTICULAR MODELFIXTURE PART SAVED

    TABLE OUTSIDE THE LINE. WASTAGE OF TIME IN: OPERATIVE'S TIME OF BRINGING FIXTUREBEFORE3

    SERARCHING OUT FIXTURE OF PARTICULAR MODELPARTS FROM TABLE OUTSIDE THE LINE, SAVEDAFTER1

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : Reduce ChangeIdea : Provide special T-allen key

    over Time

    Problem / present StatusCounter measure :Bench mark20'

    Target16'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 4 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    BEFORE3

    Scope & Plan for Horizontal DeploymentAFTER0

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : Reduce Change over TimeIdea : REDUCE LENGTH OF BOLT

    Problem / present StatusCounter measure :Bench mark30'

    Target25'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Vipinder

    Benefits :

    Bolt's size : M8*25Bolt's size : M8*15

    Analysis :Result :Changeover time reduced by 5'

    No. of such Changeover parts = 3

    No. of Bolts/ parts = 2

    Total Bolts = 6

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Before20

    SonaAfter16

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : Reduce Change over TimeIdea : Provide sppecial T-allen key

    Problem / present StatusCounter measure :Bench mark25'

    Target18'

    Start22/05/01

    Kaizen Finish22/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 7 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE SET UP TIMEIdea : COMMON MOULD TO BE USED BY REPLACING PARTS ONLY

    ON C-67 INJECTION MOULDING M/C

    Problem / present StatusCounter measure :Bench mark1480 Secs.

    Target415 Secs.

    Start10/9/00

    Kaizen Finish3/10/00

    Team members :

    RAKESH GARG

    G.R. YADAV

    MANOJ SHARMA

    S.K.GUPTA

    CHINTESHBEFORE1480

    MOULD WAS REPLACED FOR SET UPONLY REST BLOCKS ARE CHANGED FOR SET UPAFTER415

    Benefits :

    Analysis :Result :OPERATOR'S FATIGUE REDUCED

    SET UP TIME IS MORESET UP TIME REDUCED

    BY 1065 Secs.

    WHY:Scope & Plan for Horizontal Deployment

    BECAUSE DIFFERENT MOULDS ARE USED FORSr.No.M/c No.Target Dt.ResponsibilityStatus

    DIFFERENT MODELS

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme :TO REDUCE C/O TIME OFIdea : REDUCE NO. OF BOLTS & NO. OF TURN FOR TIGHTENING OF REST

    REPLACING THE BLOCKBLOCK

    Problem / present StatusCounter measure :Bench mark5 MIN.

    Target2 MIN.

    Start10/6/01

    Kaizen Finish13/6/2001

    Team members :

    RAKES GARGBEFORE5

    SATISH GUPTAAFTER2

    Benefits :

    Result :C/O TIME REDUCED BY 3 MIN.

    Analysis :

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO INCREASE PRODUCTIONIdea : USE ONLY ONE OPERATOR INSTEAD OF TWO ON CASE GEAR LINE

    OF CASE GEAR MACHINING LINE

    Problem / present StatusCounter measure :Bench mark2

    Target1

    Start27/05/2001

    Kaizen Finish29/5/2001

    Team members :

    MANOJ SHARMA

    GR YADAV

    V SETHI

    R BAJAJ

    CHINTESH

    Benefits :

    SAVED ONE OPERATOR PER SHIFT

    Analysis :Result :

    WHY : WHY SHOULD WE PUT ONLY ONE OPERATOR

    IN PLACE OF TWO OPERATORSSAVING IN MANPOWER PER SHIFT

    BEFORE2

    WE CAN PUT TUBE PRESSING M/C ON ASSY LINEAFTER1

    BECAUSE ASSY LINE OPERATOR HAS ENOUGH

    TIME TO DO THIS OPERATIONScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO IMPROVE EFFICIENCYIdea : CHANGE LINE LAYOUT

    ON COLL. COLUMN LINE

    Problem / present StatusCounter measure :Bench mark40 Pcs/Hr

    Target46 Pc/Hr

    Start28/8/2000

    Kaizen Finish31/8/2000

    Team members :

    Benefits :

    Analysis :Result :PRODUCTION PER HOUR

    WHY : WHY LESS PRODUCTION ON LINEINCREASED

    ALL M/Cs STOP DUE TO B/DOWN ON ANY M/CPRODUCTION PER HOUR

    BEFORE40

    AFTER46

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sheet1

    1

    Sheet2

    0

    0

    Sheet3

    0

    0

    TIME IN MIN.

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    8

    2

    3

    1

    3

    0

    20

    16

    Time in Minute

    1480

    415

    Changeover Time at Chamfering Station

    Time in Minute

    Time in Minute

    0

    0

    5

    2

    TIME(IN MIN.)

    REDUCTION IN C/O

    40

    46

    * PLAIN HOLES WERE PRESENT IN THE BLOCK DUE TO WHICH FULL TIGHTENING OF BOLTS WAS REQUIRED

    * PLAIN HOLES OF THE BLOCK MODIFIED TO EYES HOLES AS SHOWN, BY WHICH NO. OF TURNS OF HOLES WERE REDUCED

    R/M

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    TUBE PRESSING

    TROLLEY

    1

    2

    F/M

    R/M

    2

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    F/M

    BEFORE

    AFTER

    2

    1

    MBD0021C9A0.xls

    MBD0021B15E.xls

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 4START UP LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 5MINOR STOPPAGE & IDLING LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    GENERAL PROBLEMS ON MINOR STOPPAGES Efforts to actualize as losses are not sufficient.

    Actions taken are poor .-Only emergency measures are taken as temporary measures.

    Phenomena are not discerned fully.

    Obstruction to unattendance operation. -Operators are used for restoration.-Minor stoppages keep operators from operating multiple stations or machines.-One minor stoppage will ruin the effects of unattendance operation during breaks. JIPM, 1994

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    KAIZEN PROGRAM TO IMPROVE MINOR STOPPAGE LOSSWhere they occur, how many, how frequently, with what product, when, and in what condition (including condition by program)

    Survey the actual condition of phenomena1. Understand present status JIPM, 1994

    Stratify phenomenaPM analysisList all Fuguai that can be considered2. Analyze Phenomena

    Attach Efu in place for each slight defect or Fuguai Check during Jishu-Hozen activities

    Keep equipment and machines cleanAttaching and removing Efu3. Identify, Restore and Improve slight defect and Fuguai

    Verify effects Reflect in Jishu-Hozen criteriaSelect problems for zero minor stoppages4. Verify Results

    Timing, Installation angle, vacuum pressure, vibrationAcceleration and deceleration timing, sensor suitability, sensor mounting conditions, chute shape, coolant condition, air blow condition, positioning mechanism, clearance, accuracy of each part, fitting accuracy, condition and method of disposing chips.

    Compare with design conditionsImprove design weaknesses5. Study optimal conditions

    Improve parts and members with short lifeImprove dirty locations. (Ideas to eliminate needs for cleaning)6. Longer MTBF

    Fixation of fluctuation factors, prediction of changes, and automatic restoration of variations

    Zero minor stoppages7. Challenge to Unattendance Operation (In Zero Minor Stoppages)

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Minor Stoppage and Idling Loss

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    MN

    Soft Energy Business Group

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaiun Theme :Idea :

    To reduce the minor stoppage of Tamping.To increase no of slots available for can locating.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    Can getting stuck between star wheel & hopper guide leading to stop the flow of cans to tamping m/c.Increased no of slots from 37 to 48 by increasing the diameter of starwheel, there by reduce the RPM of starwheel.LocationTamping

    Bench Mark78min, /499 Occ/Month.

    TargetZero

    Kaizen Regn. No.R6/178/00

    Kaizen Start Date20.12.99

    Kaizen Finish Date02.07.00

    Team Members :

    Mahesh, Deepak, Jayaraj, Chandrashekar, Nagaraju.May-007676

    Analysis :Result :Jun-008080

    1. Can not located in the star wheel slot.Jul-007878

    Benefits :Aug-0000

    2. No. of slots available for locating the can is less.

    1. Minor stoppage reduced to zero .

    3. RPM of the star wheel is more.

    2. Production Increased by 23400 nos per month.

    4. Machine designed that way.

    3. Rejection reduced from 2075 Nos. to Zero per month.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Not applicable.

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To reduce the blackmix spillage in the lower spindle.To increase dia of lower punch.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    Blackmix oozing out between the holder receiver & Lower punch.Increased the dia of lower punch to 10.60 Clearance per side - 0.045mm.LocationTamping

    Bench MarkSpillage 10 kg / month.

    TargetZero.

    Kaizen Regn. No.R6/049/00

    Kaizen Start Date28.04.2000

    Kaizen Finish Date28.05.2000

    Team Members :

    Nagaraju, Ballal, Mahesh,Chandrakanth, Raghu

    Analysis :Result :

    1. Bobbin being formed by pressing the BlackBenefits :

    Mix in the Holder by the punches.Mar-001111

    2. Black Mix oozing between the Holder &1. Blackmix oozing reduced from 10kg toApr-001010

    Lower Punch1.5 Kgs / monthMay-001010

    3. Holder Inner Dia is 10.69mm.Jun-001.51.5

    4. Lower Punch Outer Dia is 10.55mm.Jul-0011

    5. Clearance between two is 0.07mm / side.Aug-001.51.5

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Not applicable.

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To reduce the Black mix spillage below roll crusher unit.To scrap the Black Mix & make it fall in the hopper.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    Blackmix Sticks to the belt & doesnt fall in the hopper & falls in the guard.Provide a scrapper to the coveyor so that excess Black mix again falling to the feeding hopper.LocationTamping

    Bench Mark2kg / day.

    Target0

    Kaizen Regn. No.R6/025/00

    Kaizen Start Date07.06.00

    Kaizen Finish Date22.07.2000

    Team Members :

    Nagaraju, Chandrakanth, Raghu, Shivakumar.May-005050

    Analysis :Result :Jun-005050

    Jul-0000

    1. Due to the wetness of the Black Mix,Benefits :Aug-0000

    it is sticking to the conveyor belt.

    1. No Black mix spillage.

    2. No cleaning of Blackmix required.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Not applicable

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To reduce cleaning time (scheduled downtime) of tamping.To eliminate manual jig removing.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    5 min required to remove the jigs during cleaning time.1. Provided cover for Proximity sensor there by inactivating it during cleaning time & gate opened to collect jigs automatically.LocationTamping

    Bench Mark5 min / day.

    Target0

    Kaizen Regn. No.R6/053/00

    Kaizen Start Date12.07.00

    Kaizen Finish Date27.07.00

    Team Members :

    M. Nagaraju / Chandrakanth, Raghu D.R

    Analysis :Result :

    1. At the end of the shift, jigs ( 100 Nos ) toJig collecting time reduced.Benefits :Jun-0055

    be removed manually.Jul-0055

    2. Person can not concentrate on any other1. Manual strain reduced to remove 100 Jigs.Aug-0000

    work during this period.2. Morale increase.

    3. About 5 min required to remove the jigs.3. Jigs dirty avoided.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Not applicable.

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To eliminate equipment failure of TampingTo avoid the dust going inside the bearing.

    DepartmentR6 Assembly.

    Problem / Present Status :Counter Measure :

    Seizure of bearing 6203 RS causing jerkyProtective cover provided to the 6203 bearing.LocationTamping

    motion of conveyor

    Bench Mark6 Hours / 2 time/year.

    Target0

    Kaizen Regn. No.R6/012/00

    Kaizen Start Date08.04.2000

    Kaizen Finish Date28.04.2000

    Team Members :

    R. Mahesh / Lokesh M. Nagaraju / Chandrakanth, Raghu D.R

    Analysis :Result :

    1. Graphite and blackmix enters in to the bearingEquipment Failure due to bearing reducedBenefits :

    to Zero.Apr-0066

    2. No protective cover provided1. Bearing failure reduced to zero.May-0000

    Jun-0000

    2. Production increased by 216000 nos.Jul-0000

    3. Machine designed that wayAug-0000

    3. Cost reduction by Rs. 600/-.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Not applicable.

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To eliminate the adjustment loss.To provide lock nut.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    During continuos operation of the machine piston lock nut getting loosend causing piston to stop half way.Spanner grip & lock nut provided.LocationTamping

    Bench Mark2 times 40 min/6month.

    TargetZero.

    ( Ref. Sketch.)

    Kaizen Regn. No.R6/056/00

    Kaizen Start Date12.06.2000

    Kaizen Finish Date21.07.2000

    Team Members :

    Lokesh M. Nagaraju / Chandrashaker, Shivakumar

    Analysis :Result :

    1. Due to the continues reciprocating motion of the piston nut getting loosen.Adjustment Loss reduced to Zero.Benefits :

    Jun-004040

    1. There is no spanner grip & lock nut.Jul-0000

    Aug-0000

    Production increased by 12000 nos

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To reduced the equipment failure due to break wire cut.To avoid the break wire cut.

    DepartmentR6

    Problem / Present Status :Counter Measure :

    Separator pulling break wire getting cut for every 15 days.The break wire dia changed to 2mm. Break wire material changed to spring stell instead of MS wire.LocationSeparator

    Bench Mark2 per month & 15 min. Occ.

    TargetZero.

    Kaizen Regn. No.R6/023

    Kaizen Start Date06.06.2000

    Kaizen Finish Date

    Team Members :

    Nagaraju / shivakumar/Chandrakumar/Raghu

    Analysis :Result :

    Jul-003030

    Breakwire dia is less (dia 1mm)Benefits :Aug-0000

    1. Equipment failure due to breakwire cut reduced to zero.

    2. Cost of the spring steel wire per unit ;is less, when compared to break wire.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To Eliminate the Equipment failure due to cutter breakage.To avoid the sleve going down.

    DepartmentR6 Assembly

    Problem / Present Status :Counter Measure :

    Separator sleeve loosen and dropping on the cutter.Provide a circlip to the sleve.LocationSeperator

    Bench Mark3 Times, 80 mintes.

    TargetZero.

    Kaizen Regn. No.R6/067/00

    Kaizen Start Date25.04.00

    Kaizen Finish Date02.05.00

    Team Members :

    Analysis :Result :Nagaraju / Balarajan / Chandrakumar / Savitha.

    1. Grub screw for holding the sleeve loosing.

    Benefits :

    2. Due to vibration of machine.Apr-008080

    Cutter breakage Zero. [Saving of Rs. 3000/-]May-0000

    Jun-0000

    Jul-0000

    Aug-0000

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    1230.09.00Nagaraj1 to be done.

    2115.10.00Nagaraj4 to be done.

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To eleminates the failure of B28 Belt.To provide Bigger Dia of pully.

    DepartmentR6 Assembly.

    Problem / Present Status :Counter Measure :

    B28 belt fails very frequenty.Allignement correted. Pully Dai changed from 90 mm.. To 120 mmmmLocationSeperator

    Bench Mark2 belts/month.

    TargetZero.

    Kaizen Regn. No.R6/068/00.

    Kaizen Start Date12.04.2000

    Kaizen Finish Date01.05.2000

    Team Members :

    Analysis :Result :K.C Lokesh / Rajesh / Nagaraju / Prasanth.

    1. Alligement of mikky pully to the belt pully not OK.

    Benefits :Mar-0022

    2. Speed cannot be varried.Apr-0022

    1. Belt failure zero [saving per month Rs.300/-]May-0000

    Jun-0000

    Jul-0000

    Aug-0000

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To eliminate the failure of photo sensor.To avoid the failure of sensor.

    DepartmentR6 Assembly.

    Problem / Present Status :Counter Measure :

    Photo sensor fails due to over hanging of cables.Provide a guard over the sensor to avoid the vaccum pipe touching to the sinser & cable.LocationTamping

    Bench Mark2 times & 75 min.

    TargetZero.

    Kaizen Regn. No.R6/069/00

    Kaizen Start Date12.03.2000

    Kaizen Finish Date18.04.2000

    Team Members :

    Analysis :Result :K.C Lokesh / Rajesh / Nagaraju / Prasanth.

    During mannual cleaning & due to over hanging of the calbe, Vacuum pipe touches the senor.

    Failure of Photo sensor is Zero.Benefits :

    Mar-007575

    1. Production Increased by 45000 nos.Apr-0000

    45000May-0000

    2. Saving of Rs.1000Jun-0000

    Jul-0000

    Aug-0000

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    Department

    Problem / Present Status :Counter Measure :

    Location

    Bench Mark

    Target

    Kaizen Regn. No.

    Kaizen Start Date

    Kaizen Finish Date

    Team Members :

    Analysis :Result :

    Benefits :

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL PTI LIMITED

    KAIZEN IDEA SHEET

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    Department

    Problem / Present Status :Counter Measure :

    Location

    Bench Mark

    Target

    Kaizen Regn. No.

    Kaizen Start Date

    Kaizen Finish Date

    Team Members :

    Analysis :Result :

    Benefits :

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    Done

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    MN

    30

    0

    0

    0

    0

    &A

    Page &P

    Minutes

    40

    0

    0

    0

    Minutes

    30

    0

    0

    Minutes

    13

    15

    0

    0

    Minutes

    KaizenDone

    0

    0

    0

    0

    0

    0

    In kg.

    0

    0

    0

    0

    In kg.

    0

    0

    0

    Minutes

    0

    0

    0

    0

    0

    Hours.

    0

    0

    0

    Minutes

    00

    00

    Minutes

    00

    00

    00

    00

    00

    00

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    BPL

    Minutes

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Qty.

    0

    0

    0

    0

    0

    0

    Minutes.

    Lower PunchDia 10.55mm

    HolderI D 10.69mm

    Lower PunchDia 10.60mm

    Clearance / side0.07mm

    Clearance / side0.045mm

    Kaizen Done

    Kaizen Done

    BlackmixHopper

    Conveyor Belt

    Scraper for removing Blackmix

    Kaizen Done

    Protective Cover

    Bearing

    Kaizen Done

    Kaizen Done

    Cutter

    Can

    Separator Paper

    Metal Sleeve

    Circlip

    Kaizen Done

    BPL

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 6REDUCED SPEED LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Speed lossManufacturer recommended speed 85 mm/secBut actual speed is 35 mm/secBeforeMain RamTie RodAfterMachine restored as per Manufacturer recommended speed of 85 mm/secMachine : Vertical Curing PressOperation : Press Curing

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 7DEFECT & REWORK LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    JIPM, 1994GENERAL PROBLEMS ON DEFECTSDefects tend to be left as they are because the situation does not improve even if countermeasures are taken- Approaching method is wrongSporadic and chronic losses are not understood-Errors by engineers who think only in the realm of organisation developed technologiesActual conditions of on-site is not understood. ( Work, setup, equipment, etc.) Methods of seizing and exploring factors are poor-Defects are not taken up as defects-Defects are not considered to affect phenomena Rework is not considered as losses

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    KAIZEN PROGRAM FOR DEFECT LOSSESProcess and location where defect is generatedRelations between equipment accuracy, method and conditions and quality.Comparative study (non-defectives, defectives and other machines)Study of mechanismMechanism, jigs, tools, setup and machining conditions 1. Stratification of Defect Phenomena JIPM, 1994

    List factors by cause and effect diagrams and 4M analytic chartsList important factors and draft Kaizen Countermeasures3. 4 M Analysis and Countermeasure DraftingPrepare a plan for Kaizen ImplementationImplement Kaizen and set conditionsVerify resultsStratification of remaining defect phenomenaPhysical analysis of PhenomenaContributing conditionsAnalyze correlations with 4MStudy of what the human resources and equipment condition must beStudy machining conditions4. Countermeasure Implementation and Result Verification 5. Implement PM Analysis

    Study of measuring methodSurvey accuracyRestore and improve Fuguai6. Identification of Defects and Implementation of Countermeasures

    Verify resultsStudy accuracy to be maintainedSet and execute control criteria7. Verifications of Results and Prevention of RecurrenceClarify quality standard and quality characteristic valuesThrough stratification of defect modes

    ABC analysis, time series data, Cp value, unadjusted time series data2. Survey of Defect Process and Location

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    1

    Lucas TVSKAIZEN IDEA SHEETKaizen Reg. NoC.codePillarL.no.Sl.NoDate Regd. 14.10.2000

    RTHSKK15001

    FIE DivisionCell : Rotor Hard StageM/c Desc:Gauging bench-BlohmM/c No: M 12046

    Kaizen Theme : Energy Loss EliminationBench markKaizen Start : Nov 1st

    Before ImprovementAnalysisTargetKaizen Finish : Non 15 th

    Team Members

    1.M.N.Ganesh 2.A.Bilalhussain 3. E.Balaji

    Results & Benefits

    Air leak

    Idea

    After Improvement

    Action Taken

    Push-buttonNo air leak

    Airflow Inlet

    No air leak

    Air leak

    Airflow Inlet

    Air leak

    Air - gauge

    Air - gauge

    Air - gauge

    Air - gauge

    AIR SUPPLY TO GAUGEONLY WHEN PUSH BUTTON IS PRESSED

    Pneumatic circuit modified with a push button ,so that,whenever the push button is pressed air will be supplied to the gauge and no air supply whenever the push button is realeased.

    COST SAVING/GAUGE Rs = 17.20 /DAY FOR 55 GAUGES =950/DAY . SAVING /ANNUM = Rs2.85Lakhs .

    Arrest air wastage when gaugwe is not in use.

    Air wastage through the one mm hole in the air gauges when not in use

    No. control valve for the air circuit

    Wastage of compressed air through air gauges when not in use.

    Air wastage is eliminated by closing the circuit(push button) after usage.

    Scope for Horizontal Deployment - No off Places : 55

    Kaizen Sustainanace Status:_ Reversible Irreversible 4

    If Kaizen is Reversible -Standard to be Updated _ JH Std _TBM Std _Why-ok Std. _Set-up Std.

    PUSH BUTTON

    AIR FLOW INLET

    AIR FLOW INLET

    AIR LEAK

    AIR LEAK

    noza80

    Lucas TVSKAIZEN IDEA SHEETKaizenCell CodePillarLoss No.Sl. No.Date Registered

    Regn. No.NOZAKK580Dec-00

    FIE DivisionCell:NOZZLEM/c. Desc.:

    Bench MarkTwice/shiftKaizen StartJan-01

    BEFORE IMPROVEMENTANALYSISTARGET0Kaizen finishJan-01

    TEAM MEMBERS

    At unloading station washing baskets collide with eachRaghupathy

    otherSenthil kumar

    Swaminathan

    Transporter is not stopping if basket in unloading station

    is not movedRESULTS & BENEFITS

    P4QCDS

    Limit switch is slipping from the basket

    Minor stoppage loss eliminated

    Limit switch lever width is less.

    Mix-up of matched nozzle and needle eliminated

    AFTER IMPROVEMENTIDEA

    To increase limit switch contact area

    ACTION TAKENCOST SAVING RS.

    2Limit switch lever is modified.This Kaizen is

    Reversible4Irreversible

    If Reversible, to be included in

    JH Standard

    WHY OK Standard

    TBM Standard

    SETTING Standard

    Number of HD Possiblenil

    (Please see reverse side for details)

    &L&"Arial,Regular"Prepared By:

    At unloading station washing baskets collide with each other

    At unloading station washing baskets are not colliding with each other

    375

    Lucas TVSKAIZEN IDEA SHEETKaizenCell CodePillarLoss No.Sl. No.Date Registered

    Regn. No.WelQM73752/9/01

    FIE DivisionCell:Sub-assy - WeldingM/c. Desc.:Projection welding

    Bench Mark Per Month80Kaizen Start2/9/01

    BEFORE IMPROVEMENTANALYSISTARGET0Kaizen finish2/28/01

    TEAM MEMBERS

    2Defective weldingK. SAMPATHK.KANNAN

    K. GOVARTHAN

    2Component moving during welding operationG.M.S. GOPINATH

    S. NITHIYANANTHAN

    2Component position shiftRESULTS & BENEFITS

    PQ4CDS75

    2No clamping of component

    Sep-0075

    2Provision of ball catch for loadingOct-0052

    Nov-0022

    Dec-004

    6Jan-018

    AFTER IMPROVEMENTIDEAFeb-010

    Difficult to move with the help of the Ball Catcher.

    ACTION TAKENCOST SAVING RS.19,200 Per Annum

    2Introduced ball catch in the top electrodeThis Kaizen is

    Reversible4Irreversible

    If Reversible, to be included in

    4JH Standard

    WHY OK Standard

    TBM Standard

    SETTING Standard

    Number of HD Possible

    Page &P

    &L&"Arial,Regular"Prepared By: Fil & Sol Team.

    375

    Rejection Trend.

    Kaizen Done

    MBD0000FA2E.bin

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 8SHUT DOWN LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    slurry

    BPL LimitedB:ABZ:F: 0001

    Alkaline Battery Division

    EXCELL T P MIssue No: 2

    Dept:Page: 1 of 1

    Name:K.J.JayaprakashType of Problem*Kaizen No:ABK/688/2000

    Pillar:PMA / B / CStart Date:6/15/00

    Theme:To Eliminate EQ. Failure (1a)*A - Adjustment / Parts changeEnd Date:8/15/00

    *B - No action *C - Setup / Trial

    Machine / Line:Slurry Machine / LR 6 - 1

    Problem Description:Gelling Agent & KOH Leaks From Wet cup Of Slurry Pump Which Causes Slurry

    Dispensing Abnormality Resulting In Plunger Damage.

    Bench Mark:4 Occ / MonthTarget:' Zero '

    ANALYSIS

    WHY ? 1 : The Clearance Between Plunger & SealWHY ? 4 : The Plunger Seals Are Used More Than Its

    Increases.Life Time.

    WHY ? 2 : The Plunger Surface Is With Scratch

    Marks.

    WHY ? 3 : The Zinc Particles Enter Between Plunger

    And Seals.

    IMPLEMENTATION

    Idea:Counter Measure :

    1. To Replace The Plunger Seals ( 3 No.s ) Regularly1. The Plunger Seals ( 3 No.s ) In All Pumps Replaced

    In All Pumps On A Time Based MaintenanceOnce In 1.5 Mill Pcs Production Initially & Changed To

    System To Prevent The Costly Plunger From WearingOnce In 3.5 Mill Pcs Production After Doing Condition

    Out.Based Monitoring.

    BEFORE KAIZENAFTER KAIZEN

    Action:Action:

    RESULTS GRAPHFOLLOW - UP

    How to Maintain?1. By Changing All Plunger Seals

    Once In 3.5 Mill Pcs production13-May

    Irrespective Of Wearout Rate.15-May

    16-Jun

    Horizontal1. LR 6 - 227-Jul

    Deployment in :2. LR 03 - 12-Aug

    3. LR 03 - 220-Sep

    14-Oct

    Benefits:1. Plunger Replacement Is 'Zero' .20-Oct

    2. OCV Rejection Reduced By4-Nov

    250ppm.

    Prepared By:M. SURESHChecked By :Approved By:

    (Name)(Dept.Head)(Sub-Committee)

    slurry

    36659

    36661

    36693

    36734

    36740

    36789

    36813

    36819

    36834

    cc

    BPL LimitedB:ABZ:F: 0001

    Alkaline Battery Division

    EXCELL T P MIssue No: 2

    Dept: CONSOLIDATED CANPage: 1 of 1

    Name:Nataraj & S.M.ShrikanthType of Problem*Kaizen No:ABK / 674 / 2000

    Pillar:PMA / B / CStart Date:1/20/01

    Theme:TO Reduce Schedule Down Time*A - Adjustment / Parts changeEnd Date:1/25/01

    Loss (8)*B - No action *C - Setup / Trial

    Machine / Line:Pellet Insertor / LR 6 - 1

    Problem Description:Sensor Position Shifts During Maintenance Activity.

    Bench Mark:70 Mins / MonthTarget:' Zero '

    ANALYSIS

    WHY ? 1 : Sensor Position Changes During Sensor

    Cleaning Process.

    WHY ? 2 : Sensor Fixture Is Madeup Of 5 Pieces

    And Tightened With 6 Screws.

    IMPLEMENTATION

    Idea:Counter Measure :

    1. Minimise The Number Of Screws In The Existing1. 5 Piece Fixture Is Replaced With A Single Piece

    Fixture.Fixture.

    BEFORE KAIZENAFTER KAIZEN

    Action:Action:

    RESULTS GRAPHFOLLOW - UP

    How to Maintain?1. Match Marking.

    2. Checking Of Screw Tightness13-May

    Once / 15 Days.15-May

    16-Jun

    Horizontal1. LR 6 - 2 Apr - 200127-Jul

    Deployment in :2-Aug

    20-Sep

    14-Oct

    Benefits:Production / Hr Increased To20-Oct

    8790 Pcs.4-Nov

    Prepared By:V. MANOJChecked By :Approved By:

    (Name)(Dept.Head)(Sub-Committee)

    K A I Z E N

    cc

    sep

    BPL LimitedB:ABZ:F: 0001

    Alkaline Battery Division

    EXCELL T P MIssue No: 2

    Dept: CELL ASSEMBLYPage: 1 of 1

    Name:K. J. Jayaprakash.Type of Problem*Kaizen No:ABK / 780 / 2001

    Pillar:QMA / B / CStart Date:1/10/01

    Theme:To Reduce Low OCV Defects.*A - Adjustment / Parts changeEnd Date:2/8/01

    *B - No action *C - Setup / Trial

    Machine / Line:SEPERATOR / LR 6 - 1

    Problem Description:Seperator Bottom Disc Getting Inserted In Slant Condition Causing Internal Shorting

    Resulting In High, Low OCV Defects.

    Bench Mark:550 ppmTarget:50 ppm

    ANALYSIS

    A - Seperator Bottomm Disc ( Formed ).5. The Vaccum Pressure At Inserting pin is More Than

    B - Bottom Disc Transfer Guide.8.0 cm Hg.

    C - Clearance Between Transfer Guide & Forming PinsWHY NOT OK ? :

    WHY OK ? :1. Bottom Disc Is Getting Damaged During Transfer Due

    1. Bottom Disc (A) Is Uniformly Formed (No Flatneass)To Damage At The Entrance Of Transfer Guide (B).

    2. Bottom Disc Transfer Is Smooth With Transfer2. Out Of 18 Stations In 4 Stations Insertor Pin

    Guide (B) Clearance Of 3.0 mm.Straightness Found More Than 0.06 mm.

    3. The Main Seperator Sealing Is In Good Condition3. Insertor Bottom Guide Found With Biwax.

    Such That It Does Not Unwind.

    4.The Straightness Of Inserting Pin Is Within 0.02mm.

    IMPLEMENTATION

    Idea:Counter Measure :

    1. To Change The Design Of The Bottom Transfer1.Bottom Transfer Guide With 2.5 mm Thickness Replaced

    Guide With Less Thickness ( - 0.5 mm ) To AvoidInstead Of 3.0 mm.

    Forming Pin Touching The Transfer Guide While2. Insertor Pins Leveling Done To Bring Back The

    Retracting.Straightness Less Than 0.02 mm.

    3. All Insertor Bottom Guides Cleaning Done With Toluine.

    BEFORE KAIZENAFTER KAIZEN

    Action:Action:

    RESULTS GRAPHFOLLOW - UP

    How to Maintain?1.By Cleaning Insertor Pins & Guides

    Once In 1.5 Mill Pcs Prodn.13-May

    2. By Having Online Control For Rejn.15-May

    16-Jun

    Horizontal1. LR 6 - 2 - Mar 200127-Jul

    Deployment in :( For Cleaning / Hourly Monitoring )2-Aug

    20-Sep

    14-Oct

    Benefits:1. Rejection Value Reduced By20-Oct

    Rs 7500 / Month.4-Nov

    2. Spare Cost Saving Rs 15000 / Yr.

    Prepared By:M. SURESHChecked By :Approved By:

    (Name)(Dept.Head)(Sub-Committee)

    K A I Z E N

    sep

    K A I Z E N

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 10MOTION LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Operating Motion lossMix pockets kept away from the workstation and operator need to walk to take the mix pocket. (Walking distance upto 1 meter)3 secs per cycle1 sec per cycleMix pockets kept near the the workstation to reduce the walking and easy collection of mix pockets. (No walking)Machine : Gang press-3Operation : CuringBeforeAfter

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 11LINE ORGANISATION LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Organisation Loss Reduction

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Sheet1

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea :CHANGE THE DESIGN OF ALLEN KEY AND USE BOLT RUNNER FOR

    TIME ON RACK TEETH BROACHING M/CTIGHTNING AND LOOSENING OF BOLTS(39 Nos.)

    Problem / present StatusCounter measure :Bench mark1490 SEC.

    Target700 SEC.

    Start1/5/01

    Kaizen Finish6/5/01

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :

    BROACH ASSEMBLING AND DIS-

    Analysis :Result :ASSEMBLING OF BOLTS

    WHY: BOLTS LOOSENING AND TIGHTNING TIME ISBEFORE1490

    HIGHAFTER700

    :OPERATOR HAS TO OPEN AND CLOSE 39 BOLTS

    WHILE CHANGE OVER

    : ALLEN KEY DESIGN CHANGED AND BOLT RUNNER

    PROVIDED ON LINEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea :CHANGE CHIP TRAY CLAMPING SYSTEM FROM HEX BOLTS TO

    TIME ON RACK TEETH BROACHING M/CPIN TYPE LOCKING

    Problem / present StatusCounter measure :Bench mark60 Secs.

    Target10 Secs.

    Start17/5/2001

    Kaizen Finish17/5/2001

    Team members :

    R.BAJAJ

    SATYAWAN

    SAT PAL

    RAMESH CHAND

    Benefits :BEFORE60

    NO NEED OF OPENING BOLTSAFTER10

    Analysis :Result :TIME SAVED 50 Secs.

    HIGH TIME FOR CHANGING THE CHIP TRAY ON

    BROACHING M/C

    WHY:

    BECAUSE THE CHIP TRAY IS MOUNTED BY BOLTS

    WHICH REQUIRES HIGH TIME FOR TIGHTNING ANDScope & plan for Horizontal Deployment :

    RETIGHTNINGSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE THE SETUP TIMEIdea : PROVIDE A RATCHET AND SOCKET ON LINE TO REDUCE BOLT LOOSEN-

    ON XLO CASE GEAR LINEING AND TIGHTENING TIME

    Problem / present StatusCounter measure :Bench mark10 MINS

    Target4 MINS

    Start4.6.01

    Kaizen Finish4.6.01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :BOLTS LOOSENING AND TIGHTENING

    WHY BOLTS LOOSENING AND TIGHTENING TIME IS HIGHTIME REDUCED

    : ALLEN KEY AND PIPE TAKES MORE TIME TO

    LOOSEN & TIGHTEN THE BOLTS

    : PROVIDE A RACHET & SOCKETScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE PLACE FOR KEEPING BROACH ON LINE

    Problem / present Status : NON AVAIL-Counter measure : PLACE PROVIDED FORBench mark210 Secs.

    ABILITY OF RESHARPENED BROACHKEEPING BROACH SET ON LINETarget120 Secs.

    Start17/3/2001

    Kaizen Finish20/3/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN DOWN TIME

    Analysis :Result :FROM 210 SEC TO 120 SEC

    THERE WAS NO FIXED PLACE ON LINE FOR BROACHREDUCTION IN DOWN TIME DUE TO NON-AVAILABILITY

    SET (OF HORIZONTAL BROACHING M/C)OF RESHARPENED BROACH

    BEFORE10

    AFTER4

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE CHANGE-OVERIdea : PROVIDE SPL NUT & BOLT, TO AVOID USAGE OF ALLEN KEY FOR TIGHTENING

    TIME ON XLO-IAND LOOSENING OF ALLEN BOLTS

    Problem / present StatusCounter measure :Bench mark5 Mins.

    Target1-Mins

    Start4/6/01

    Kaizen Finish8/6/01

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    REDUCTION IN CHANGE OVER

    Analysis :Result :BY 4 MIN

    WHY :

    SPECIAL BOLT & NUT ARE REQUIREDCHANGE OVER TIME

    - IT IS HARD TO LOOSEN AND TIGHTEN THE ALLENBEFORE210

    BOLTAFTER120

    - HAND TOOLS ARE REQUIRED. SO TO ELIMINATEScope & plan for Horizontal Deployment :

    THIS PROVIDE SPECIAL BOLT & NUTSr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : PUT A TROLLEY UNDER CHIP AND COOLANT TRAY SO THAT

    OVER TIME ON RACK TEETH BROACHINGREMOVAL OF TRAY SHOULD BE EASY

    Problem / present StatusCounter measure :Bench mark310 Secs.

    Target140 Secs.

    Start15/5/2001

    Kaizen Finish19/5/2001

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    TROLLEY REMOVAL AND

    Analysis :Result :FIXING TIME REDUCED

    WHY : CHANGE OVER ON BROACHING M/C TO BEBY 170 Secs.

    REDUCED

    : DUE TO HIGH CHANGEOVER TIME ON M/CBEFORE5

    : OPERATOR HAS TO USE CHAIN PULLEY FORAFTER1

    REMOVAL OF TRAY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : PROVIDE EYE HOLE

    FOR BOLT LOOSENING / TIGHTENING

    Problem / present StatusCounter measure :Bench mark220 Secs.

    Target45 Secs.

    Start1/12/00

    Kaizen Finish3/12/00BEFORE310

    AFTER140

    Team members :

    A.K. DASGUPTA

    MANOJ SHARMA

    R. BAJAJ

    Benefits :

    Analysis :Result :175 SEC TIME REDUCED FOR

    WHY TAKES MORE TIME TO LOOSENING &CHANGEOVER

    TIGHTENING OF BOLTS

    FULL BOLTS HAVE TO BE REMOVED DUE TO

    NO EYE HOLEScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE T-SLOTS ON THE MACHINE BED & UPPER CLAMPING PLATE

    COL SHAFT INJ. MOULDING M/COF MACHINE

    Problem / present StatusCounter measure :Bench mark30 Mins.

    HIGH C/O TIME ON COL. SHAFT INJ MOULDING M/CT-SLOTS PROVIDED ON M/C BED & UPPER CLAMPINGTarget23 Mins.

    PLATE. NOW CLAMPING BY T-BOLTSStart16/4/2001

    Kaizen Finish23/4/2001

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    Benefits :

    SAVING IN C/O TIME

    Analysis :Result :BY 7-MINS

    THERE ARE TAPPED HOLES ON M/C BED & UPPERSAVING IN C/O TIME

    PLATE FOR CLAMPING THE MOULD. THE THREADSBEFORE220

    INSIDE THREE HOLES WASHED OUT. IF ONE BOLT ISAFTER45

    SLIPPING WHILE TIGHTENING THEN OPERAOR TRY

    TO USE OTHER HOLE OR BIG LENGTH BOLT

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : MODIFICATION OF RUNNER PLATE BY PROVIDING CHAMFER

    PLATE

    Problem / present StatusCounter measure :Bench mark20 Secs.

    Target10 Secs.

    Start19/12/2000

    Kaizen Finish19/12/2000

    Team members :

    CHINTESH

    PARMOD JAIN

    JITENDER

    RAKESH GARG

    Benefits :

    Analysis :Result :

    WHY TAKE MORE TIME TO PUT RUNNER PLATE10 SEC TIME REDUCED FORBEFORE30

    ON CAVITYCHANGEOVERAFTER23

    NO CHAMFER ON RUNNER PLATE & ACTIVITY

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE A HOLE IN THE BOTTOM OF THE HOOPER, TO TAKE THE

    OF MATERIAL REMOVAL FROM HOOPERMOULDING MATERIAL OUT.

    Problem / present StatusCounter measure :Bench mark8 Mins.

    MATERIAL IN THE HOOPER WAS DRAINED OUT BYHOLE IS PROVIDED IN THE BOTTOM OF THE HOOPERTarget2 Mins.

    OPERATING THE M/CWITH SHUTTER. NOW MATERIAL IS REMOVEDStart2/4/01

    MANUALLYKaizen Finish2/4/01

    Team members :

    CHINTESH

    KIRORI

    SATYAWAN

    Benefits :

    NO WASTAGE OF MATERIAL

    Analysis :Result :COST SAVING : Rs 1500/YEARBEFORE20

    AFTER10

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO WELD WITH SCREWS TO AVOID USE OF ALLEN KEY WHILE LOOSENING

    WHILE CHANGEOVER& TIGHTENING OF SCREWS

    Problem / present StatusCounter measure :Bench mark3- Mins.

    WHILE CHANGEOVER WASTAGE OF TIME IN LOOSEN-T-HANDLES ARE WELDED WITH SCREWSTarget1 Min

    ING & TIGHTENING OF CLAMPING SCREWS OF DOGS,Start24/4/2001

    FOR MOULD SETTING OF INJECTION MOULDINGKaizen Finish27/4/2001

    MACHINES

    Team members :

    SATISH GUPTA

    HARISH PAHUJA

    CHINTESH

    Benefits :

    Analysis :Result :CHANGEOVER TIME REDUCTION

    ALLEN KEYS WERE BEING USED IN LOOSENING &REDUCTION IN DOWNTIME WHILE CHANGEOVER2 MIN / CHANGEOVERBEFORE8

    TIGHTENING OF DOG SCREWSAFTER2

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : TO PROVIDE FIXED PLACE FOR PARTICULAR MODEL FIXTURE PART

    TIME ON INJ. MOULDING MACHINENEAR TO OPERATOR

    Problem / present StatusCounter measure :Bench mark3 Mins

    WASTAGE OF TIME WHILE CHANGEOVER ON INJ.FIXED PLACE PROVIDED FOR FIXTURES OF DIFFERENTTarget0

    MOULDING M/C.MODELS WITH THE M/CStart12/4/01

    Kaizen Finish15/4/2001

    Team members :

    CHINTESH

    SATYAWAN

    LAXMAN

    Benefits :

    OPERATIVES TIME IN SEARCHING &

    Analysis :Result : NO WASTAGE OF TIME IN SEARCH-BRINGING REQUIRED MODEL

    FIXTURE OF DIFFERENT MODELS ARE PLACED ON AING OUT FIXTURE PARTS OF PARTICULAR MODELFIXTURE PART SAVED

    TABLE OUTSIDE THE LINE. WASTAGE OF TIME IN: OPERATIVE'S TIME OF BRINGING FIXTUREBEFORE3

    SERARCHING OUT FIXTURE OF PARTICULAR MODELPARTS FROM TABLE OUTSIDE THE LINE, SAVEDAFTER1

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : Provide special T-allen key

    over Time

    Problem / present StatusCounter measure :Bench mark20'

    Target16'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 4 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    BEFORE3

    Scope & Plan for Horizontal DeploymentAFTER0

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : REDUCE LENGTH OF BOLT

    Problem / present StatusCounter measure :Bench mark30'

    Target25'

    Start20/05/01

    Kaizen Finish20/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Vipinder

    Benefits :

    Bolt's size : M8*25Bolt's size : M8*15

    Analysis :Result :Changeover time reduced by 5'

    No. of such Changeover parts = 3

    No. of Bolts/ parts = 2

    Total Bolts = 6

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Before20

    SonaAfter16

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Problem / present StatusCounter measure :Bench mark25'

    Target18'

    Start22/05/01

    Kaizen Finish22/05/01

    Team members :

    Mr. Pramod Jain

    Mr. Tara Chand

    Benefits :

    Analysis :Result :+Changeover Time reduced by 7 minutes

    Only one hand was being used for screwing/unscrewing the bolt that result in more time and fatigue+Operator's fatigue reduced.

    Scope & Plan for Horizontal Deployment

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Kaizen Theme : TO REDUCE SET UP TIMEIdea : COMMON MOULD TO BE USED BY REPLACING PARTS ONLY

    ON C-67 INJECTION MOULDING M/C

    Problem / present StatusCounter measure :Bench mark1480 Secs.

    Target415 Secs.

    Start10/9/00

    Kaizen Finish3/10/00

    Team members :

    RAKESH GARG

    G.R. YADAV

    MANOJ SHARMA

    S.K.GUPTA

    CHINTESHBEFORE1480

    MOULD WAS REPLACED FOR SET UPONLY REST BLOCKS ARE CHANGED FOR SET UPAFTER415

    Benefits :

    Analysis :Result :OPERATOR'S FATIGUE REDUCED

    SET UP TIME IS MORESET UP TIME REDUCED

    BY 1065 Secs.

    WHY:Scope & Plan for Horizontal Deployment

    BECAUSE DIFFERENT MOULDS ARE USED FORSr.No.M/c No.Target Dt.ResponsibilityStatus

    DIFFERENT MODELS

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : REDUCE NO. OF BOLTS & NO. OF TURN FOR TIGHTENING OF REST

    REPLACING THE BLOCKBLOCK

    Problem / present StatusCounter measure :Bench mark5 MIN.

    Target2 MIN.

    Start10/6/01

    Kaizen Finish13/6/2001

    Team members :

    RAKES GARGBEFORE5

    SATISH GUPTAAFTER2

    Benefits :

    Result :C/O TIME REDUCED BY 3 MIN.

    Analysis :

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : USE ONLY ONE OPERATOR INSTEAD OF TWO ON CASE GEAR LINE

    OF CASE GEAR MACHINING LINE

    Problem / present StatusCounter measure :Bench mark2

    Target1

    Start27/05/2001

    Kaizen Finish29/5/2001

    Team members :

    MANOJ SHARMA

    GR YADAV

    V SETHI

    R BAJAJ

    CHINTESH

    Benefits :

    SAVED ONE OPERATOR PER SHIFT

    Analysis :Result :

    WHY : WHY SHOULD WE PUT ONLY ONE OPERATOR

    IN PLACE OF TWO OPERATORSSAVING IN MANPOWER PER SHIFT

    BEFORE2

    WE CAN PUT TUBE PRESSING M/C ON ASSY LINEAFTER1

    BECAUSE ASSY LINE OPERATOR HAS ENOUGH

    TIME TO DO THIS OPERATIONScope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sona

    Sona Koyo Steering Systems Ltd.KAIZEN IDEA - SHEET

    Idea : CHANGE LINE LAYOUT

    ON COLL. COLUMN LINE

    Problem / present StatusCounter measure :Bench mark40 Pcs/Hr

    Target46 Pc/Hr

    Start28/8/2000

    Kaizen Finish31/8/2000

    Team members :

    Benefits :

    Analysis :Result :PRODUCTION PER HOUR

    WHY : WHY LESS PRODUCTION ON LINEINCREASED

    ALL M/Cs STOP DUE TO B/DOWN ON ANY M/CPRODUCTION PER HOUR

    BEFORE40

    AFTER46

    Scope & plan for Horizontal Deployment :

    Sr.No.M/c No.Target Dt.ResponsibilityStatus

    Sheet1

    1

    Sheet2

    Sheet3

    TIME IN MIN.

    20

    16

    Time in Minute

    Changeover Time at Chamfering Station

    Time in Minute

    Time in Minute

    5

    2

    TIME(IN MIN.)

    REDUCTION IN C/O

    40

    46

    * PLAIN HOLES WERE PRESENT IN THE BLOCK DUE TO WHICH FULL TIGHTENING OF BOLTS WAS REQUIRED

    * PLAIN HOLES OF THE BLOCK MODIFIED TO EYES HOLES AS SHOWN, BY WHICH NO. OF TURNS OF HOLES WERE REDUCED

    R/M

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    TUBE PRESSING

    TROLLEY

    1

    2

    F/M

    R/M

    2

    XLO-1

    XLO-2

    XLO-3

    WASHING M/C

    GAUGE TABLE

    F/M

    BEFORE

    AFTER

    2

    1

    MBD0021B15E.xls

    MBD0021C9A0.xls

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 13MEASUREMENT & ADJUSTMENT LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Adjustment Downtime Loss Reduction

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    LOSS - 14ENERGY LOSS

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    VVVVVa

    Sheet2

    PU : CENTRAL PUKAIZEN SHEET

    Kaizen Theme :Idea : TO CONVERT WATER COOLED PACKAGE A/C INTO USER FRIENDLY

    TO REDUCE POWER CONSUMPTIONAIR COOLED PACKAGE A/C.

    Problem / present Status:Counter Measure:Bench Mark4.5 KW

    1ST FL. AD. EDP DPET.WATER COOLED A/C SYSTEM.USED.PUMP & COOLER TOWER ELEIMINATED.TargetZero

    Start01-Mar-01

    Kaizen Finish15-Apr-01

    Team Members :

    1.S.S.DIGHE

    2.U.S.JOSHI

    3.M.V.AGASHE

    Benefits:

    KW OF WATER PUMP & COOLING TOWER FAN= 4.5 KW

    = 4.5 KW X 0.80 ( LOAD FACTOR ) 24 HRS.

    = 86.4 UNITS / DAY

    Analysis :Result := 31536 UINITS / YEARS ( 365 DAYS)

    AS A SYSTEM IS WATER COOLED, IT IS REQUIRED WATER PUMP, COOLING TOWER AND WATER. ALSO SYSTEM IS VERY OLD (15 YESRS) HENCE NOT VERY EFFICIENT.ELIMINATED 5 HP CONDENSOR WATER PUMP AND 1 HP COOLING TOWER FAN AND SAVEED IN ELECTRICAL POWER CONSUMPTION.= Rs.133081 ( Rs.4.22 / KWH )

    Scope & Plan for Horizontal deployment :

    Sr.NoM/c. NoTarget dtResponsibilityStatus

    WATER PUMP

    COOLING TOWER

    CONDENSOR

    A/C UNIT

    A/C UNIT

    CONDENSOR

    WATER COOLED A/C SYSTEM

    AIR COOLED A/C SYSTEM

    ELIMINATED 3000 LITERS/DAY WATER AND SAVED MUNICIPAL COSTWATER.

    COST OF INSTALLATION @ Rs. 85000

    USER FRIENDLY OPERATION

    PAY BACK WITHIN ONE YEAR

    LOSSENERGY

    Sheet3

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Example of Power consumption reduction

    TPM Club IndiaFocussed Improvement Pillar Confederation of Indian Industry

    Carton Box for SealingMotor for driving the BeltLimit Switch for starting the motor

    Empty

    KAIZEN IDEA SHEETBPL PTI LIMITED

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    To prevent the breakage of locknut for shankTo avoid breakage of locknut

    DepartmentBattery Can

    Problem / Present Status :Counter Measure :

    LocationR20 Impact press. M/c no. 5

    Locknut getting cracked at the collet holding sideThe collet size was reduced from 66.5mm to

    ofter sometimeto 63.0mmBench Mark2 locknuts broken on 26.12.99 & 12.01.2000

    TargetZero breakdowns

    Kaizen Regn. No.214

    Kaizen Start04.02.2000

    Kaizen Finish15.02.2000

    Team Members :

    C K JitheshNaveen

    Analysis :Result :PapannaKumar

    1. The collet for holding the shank was more inNo breakage of shank holding locknut

    lengthBenefits :

    Zero breakdowns due to breakage of shank holding nut

    2. Because of which when locknut was being

    tightened, the collet being more in length

    prevented the shank from being fully tightened.

    3 As the shank was often getting loosened

    it was again being tightened every day at the

    start of the shift.

    Scope & Plan for Horizontal Deployment

    4. Due to the above the locknut had cracked at theSl. No.M/c. No.Target Dt.ResponsibilityStatus

    collet holding side. (Refer sketch)

    KAIZEN IDEA SHEETBPL PTI LIMITED

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    Avoid failure of purspring frequently.Provide a stripper inspite of pursprings.

    DepartmentTool Room

    Problem / Present Status :Counter Measure :

    LocationR6-Bottom plate press

    Almost for every time tool is loaded, purspringsProvide stripper with spring loaded.

    were to be changed and also during operationBench MarkPursprings to eject strip

    it used to fail & cause damage to the tool.

    TargetAvoid failure of pursprings

    Kaizen Regn. No.TR/02/00

    Kaizen Start21.03.2000

    Kaizen Finish22.05.2000

    Team Members :

    Abhinandan

    Analysis :Result :Math

    Deepak Naik

    Purspring when fitted on to the punch, if it is littleBetter performance.Benefits :

    loose it used to get loosened during purspring1. Easy in assembling.

    and some springs used to break, because it can2. Reduce timeloss for resetting tool and

    not sustain more compression than that is requiredfitting purspring during operation.

    to eject the strip.3. No consumption of purspring.

    4. Better performance.

    Scope & Plan for Horizontal Deployment

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    120/8/2kAbhinandan

    225/9/2k

    319/10/2k

    424/11/2k

    KAIZEN IDEA SHEETBPL PTI LIMITED

    DRY CELL DIVISION.

    Believe in the BestMADDUR.

    Kaizen Theme :Idea :

    Avoid complication in machining and manufacturingRedesign R20 jacket forming shaft from two pieces to single piece.

    cost reduction.

    DepartmentTool Room

    Problem / Present Status :Counter Measure :

    Very much difficulty in manufacturing the formingMake a forming shaft single piece.LocationR20 Body maker

    shaft, more machining time.

    Bench MarkMore cost and difficulty in machining

    TargetReduction in cost, Better performances

    Kaizen Regn. No.TR/01/00

    Kaizen Start15.04.2000

    Kaizen Finish25.06.2000

    Team Members :

    Jayarajan

    Analysis :Result :

    1. For forming the jacket the forming shaft notBenefits :

    necessarily be split to make the jacket go into the1. Easy machining .

    shaft.2. Better performances.

    3. Reduction in manufacturing cost.

    2. It can be a single piece with 0.2 lesser diameter

    than that of the jacket.

    Sl. No.M/c. No.Target Dt.ResponsibilityStatus

    KAIZEN IDEA SHEETBPL PTI