Top Banner
By R. Harry Eddyarso PT. SARIPARI PERTIWI ABADI 15 September 2006 KMI Goes to Campus ProgramKomunitas Migas Indonesia – Universitas Indonesia
18

02 drilling preparation ui 15 sep 2007

Jan 21, 2017

Download

Engineering

yudi05
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 02 drilling preparation   ui 15 sep 2007

By

R. Harry EddyarsoPT. SARIPARI PERTIWI ABADI

15 September 2006

“KMI Goes to Campus Program”Komunitas Migas Indonesia – Universitas Indonesia

Page 2: 02 drilling preparation   ui 15 sep 2007

1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)

2. Rig Size Calculation

3. Torque & Drag Calculation

4. Casing / Liner Design & Cementing Procedures

5. Wellhead Design & Installation

6. Mud Engineering & Design

7. Directional Drilling Plan & Drill String Design

8. Drilling Hydraulic Optimization

9. Bit Selection

10.Formation Evaluation (Logging, Coring)

11.BOP Stack Diagram & Well Control Procedures

12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion

13.Health, Safety, Environment

14.Emergency Response Plan (ERP)

15. Etc

Page 3: 02 drilling preparation   ui 15 sep 2007
Page 4: 02 drilling preparation   ui 15 sep 2007
Page 5: 02 drilling preparation   ui 15 sep 2007
Page 6: 02 drilling preparation   ui 15 sep 2007
Page 7: 02 drilling preparation   ui 15 sep 2007
Page 8: 02 drilling preparation   ui 15 sep 2007
Page 9: 02 drilling preparation   ui 15 sep 2007
Page 10: 02 drilling preparation   ui 15 sep 2007

Closest location between fault and well path at depth –3064’ tvdss

Closest distance from the fault = 95 mtr.Fault position error bar = 30 mtr.Drilling target radius = 50 ft.

Page 11: 02 drilling preparation   ui 15 sep 2007

Open Hole Logging Package:

1. Resistivity / Sonic

2. Density / Porosity

3. Core Sampling

4. Dipmeter

5. RFT

6. Velocity Survey

Cased Hole Logging Package:

1. CBL/VDL/CET

Page 12: 02 drilling preparation   ui 15 sep 2007

Net to Gross map

GrossNet

Net

B-29A2 Net to Gross Map

Page 13: 02 drilling preparation   ui 15 sep 2007
Page 14: 02 drilling preparation   ui 15 sep 2007
Page 15: 02 drilling preparation   ui 15 sep 2007
Page 16: 02 drilling preparation   ui 15 sep 2007
Page 17: 02 drilling preparation   ui 15 sep 2007
Page 18: 02 drilling preparation   ui 15 sep 2007