7/30/2019 01 Introduction classical process control
1/11
CHE 165 Plant Design
Introduction
7/30/2019 01 Introduction classical process control
2/11
Greensheet Review
Target is Study
Reported Verbally and in Text
Consists of Various Components
Most are submitted as Project Assignments
Some are completed without priorsubmission
TextsPeters, Timmerhaus and West
Perrys ChE Handbook
7/30/2019 01 Introduction classical process control
3/11
Greensheet Structure
Homework Assignments From Text or Supplemental
Individual Scoring and submission
Project Assignments
As described in Final Report Format section Team Scoring one submission
Individual Verbal Reports Individual Grade
Must be presented on the scheduled date
Should use Powerpoint format
Team Final Report May use multiple presenters
Team Grade
7/30/2019 01 Introduction classical process control
4/11
Greensheet Details
Industrial Speakers
Prompt Attendance is mandatory
NorCal Symposium (April)Attendance is recommended
Material from Symposium on Final Exam
7/30/2019 01 Introduction classical process control
5/11
COURSE OBJECTIVES
Design, Construct and Implement aproject management organization
Assess the technical and economicaspects of a proposed project
Develop methods to obtain informationfor this research
Analyze collected data and developsummary evaulations
7/30/2019 01 Introduction classical process control
6/11
COURSE OBJECTIVES
Communicate project status andresults to constituencies
Team Level
Client Level
Professional Level
Verbally
Textually
Poster
7/30/2019 01 Introduction classical process control
7/11
AWARD MEMO
Specifies Areas for Research
Includes some initial information forproject
Provides General Project Guidelines
Range of investigation
Design Bases
Design Criteria
Priority Deliverables
7/30/2019 01 Introduction classical process control
8/11
PROJECT DESCRIPTION
Technical EvaluationCommercial Technology
Developing Technology
Capital Costs Cost of Constructing the Facility
Base Cases and Variations
Operating CostsCost of Operating the Facility
Variations due to Technology and
Production Levels
7/30/2019 01 Introduction classical process control
9/11
FINAL REPORT CONTENTS
Refer to Report Table of Contents in Greensheet
Project Assignments for some sections
Other sections are not included in the ProjectAssignments
Prepare Sections for Inclusion in Final Report Start with Final Report Outline as Table of Contents
Include references for all factual material from literatureor report appendices
Prepare Appendices with local Table of Contents andlocal Page Numbers
Assume that you will NOT be present when thereader attempts to review your report.
7/30/2019 01 Introduction classical process control
10/11
PROJECT ASSIGNMENTS
General Description is Provided in theReport Table of Contents
Ask Specific Questions in Advance
Questions should use YES/NO responses. I did not know that was required is not an
acceptable excuse for an incompleteassignment.
Allow time to incorporate revisions Deficiencies noted in grading
Additional data from further research
7/30/2019 01 Introduction classical process control
11/11
TEAM SELECTION
Completed in Next Meeting
Requires:
Selection of first two choices of projectCompletion of DISC Survey documentbefore coming to class