Top Banner
00/XXXX 1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva 3-7 November 2003
21

00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 1

Upper Air Network UK National Report.

Tim Oakley & John Nash

Met Office, Exeter, UK

•CIMO ET on Upgrading the Global Radiosonde Network – Geneva 3-7 November 2003

Page 2: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 2

Network early 2001

8 ‘Core’ stations, manned 24/7

Defence and Boundary layer sites, when available

Page 3: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 3

Current Upper-Air Network 2003

2 Manned Radiosonde Sites

4 Autosonde Sites

Supplementary Radiosonde sites, ascents as required

5 Wind-Profiler Sites

Page 4: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 4

Upper-Air Network (Met Office) Lerwick Manned DigiCora III RS80H Loran 00 , 12 Camborne Manned DigiCora III RS80H Loran 00 , 12 Castor Bay Autosonde MW15 RS80H Loran 00 , 12 Albemarle Autosonde MW15 RS80H Loran 00 , 12 Watnall Autosonde MW15 RS80H Loran 00 , 12 HerstmonceuxAutosonde MW15 RS80H Loran 00 , 12 Larkhill(defence) Manned DigiCora III RS80H Loran IRREG Aberporth(defence) Manned DigiCora III RS80H Loran IRREG W.Freugh(defence) Manned DigiCora III RS80H Loran IRREG S.Uist(defence) Manned PC-Cora RS80H Loran IRREG Supplementary(8) Manned PC-Cora RS80H Loran IRREG

Gibraltar Manned DigiCora III RS80H GPS 00 , 12 Falklands Manned DigiCora III RS80H GPS 00 , 12 St Helena Manned DigiCora III RS80H GPS 12

Additional radiosonde ascents at the request of the National Met Centre.

Page 5: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 5

DigiCORA III - Ground System

Operational from June 01

Able to interface with the continuing evolution of operational radiosondes & different wind finding.

COTS Processor using Windows NT

Remote or local interrogation

Service Level Agreement with manufacturer

Page 6: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 6

Autosonde at 4 UK Sites

•Autosonde trialled for operationally feasible

•Radiosondes Tested

•Proved successful for operations at inland sites.

•From 2002 - operational at 4 Met. Office sites, UK

•Plans to upgrade Autosondes to DigiCORA III during 03/04

Page 7: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 7

UK Radiosonde Trials 2002

Jan 2002 - Radar v Graw v Sippican v Vaisala RS90 Test of GPS systems for both wind measurements & GPS heights as

possible reference system to replace COSSOR radar.

Feb 2002 – Vaisala RS90 v RS80 Comparison of alternative RS90 humidity measurements (i.e. cap/no cap)

May 2002 – Vaisala RS90 v RS80 v Snow-whites Continuing evaluation of the RS90 humidity measurements + comparison

with Microwave Radiometer measurements. August 2002 – Radar v Graw v Sippican v Vaisala RS90

Final test for systems to replace the COSSOR radar.

October 2002 – Vaisala RS92 (High Power) v RS80 First trials on DigiCORA III, comparisons with the operational ascent.

Page 8: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 8

UK Radiosonde Trials 2003

May 2003 - Vaisala RS92 (Low Power) v RS80 First trials on DigiCORA III of the low power radiosonde + necessary hardware upgrades. Comparisons with the operational

ascent.

July 2003 – Meteorlabor SPC/Snow-whites v RS80/RS92 Trial of complete Meteolabor system with Snow-whites as possible reference radiosonde system for 2004+.

October 2003 – Vaisala RS92 v RS80 Acceptance test for Pristina airport installation. Further evaluation of the RS92 GPS measurements.

December 2003 – Vaisala RS80 v RS92 (L&H) v S/Whites Pre-acceptance test for the RS92 radiosonde.

Page 9: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 9

Next Generation Radiosonde RS80 radiosonde is considered obsolete by Vaisala, and

production will gradually be reduced over 4 to 5 years.

The radiofrequency transmitter is out of date and needs to be improved to meet requirements for reduced

spectrum occupation and hence spectrum charges. The RS90 radiosonde had improved sensors, but the

transmitter and internal electronics were not optimised. The RS90 relative humidity sensor package failed the

Met Office acceptance test [ Sensor calibration errors, sensor instability and inadequate protection in cloud]

Page 10: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 10

Future RS92 work Vaisala are proposing that the Met Office use the

newly developed RS92 radiosonde , built using dedicated ASIC’s not only for GPS winds but also for processing PTU information during flight and for digital data transmissions to the ground

The mechanical design of the RS92 has been changed to make the deployment of the temperature and relative humidity sensor exposure more reproducible, as suggested by Met Office.

Page 11: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 11

Future work [2]

RS92 Acceptance testing 2003/04Sensor performance ( i.e. humidity –

pulse heating) Digital transmitter/receiver (low & high power) Complete ‘system’ acceptance test – Spring 04

Handover of RS92 to operations Implementation of BUFR coding Implementation of one software suite for

Autosondes + DigiCora III

Page 12: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 12

BUFR Code DC III system has the capability to produce BUFR. Test and evaluate the BUFR. (Content,

communications, storage) Implement operationally.

Benefits Transmission of complete Radiosonde archive No need for manual editing of selected points Inline with CBS recommendations to change to BUFR Archive of high resolution data for verification/research

Page 13: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 13

BUFR findings to date. BUFR encoding on DigiCORA III has been tested to Met

Office satisfaction. (Decoded successfully by operational database.)

Some inconsistencies between the encoded and decode data.

Questions about the necessary level of data QC flagging. Concerns over the size of the BUFR message and the

ability of the operational databases to archive/access the data.

Project in Met Office tasked with delivering BUFR messages for the future.

Page 14: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 14

Quality monitoring of RH sensor performance.

12 year archive of ‘high resolution’ radiosonde measurements from 4 UK sites.

Using surface observation to identify ascents that have passed through cloud.

Monthly/annual statistics used to monitor the performance of the RH sensor.

Information/results feedback to manufacturer.

Used to detect changes from A & H Humicap , also batch performances and manufacture & calibration problems.

Page 15: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 15

Wind Profiler Network

4 systems are operational components of the UK network.

Wind data from these systems being assimilated into the UK NWP models.

New 64MHz system under final acceptance and hand-over to operations.

Collaboration with WINPROF (European network)

Page 16: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 16

GPS Water Vapour Network

Page 17: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 17

Network Configuration

Page 18: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 18

Page 19: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 19

GPS Water Vapour Network

Project has demonstrated the feasibility and usefulness of a ‘real-time’ GPS IWV network.

Working with Nottingham University to develop a Met Office system to provide real-time IWV in < 2 hours from observation.

Planned x10 increase in UK network by collaborations with other services.

Aim to deliver an operational network of IWV measurements by 2005.

Page 20: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 20

Upper Air Networks – The Future.

Further Automation.

Integration.

Increased use of high temporal & high resolution data.

Use of other measurements ( i.e. Signal to Noise)

Page 21: 00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.

00/XXXX 21

Summary Integrated wind data already being used

operationally and changing observing networks in the UK.

Usefulness and potential benefits of IWV networks accepted by users and will be introduced into operations in next 2-3 years.

Significant progress in exploiting the high resolution capabilities of remote sensing systems.

Progress in the techniques necessary to integrate different remote sensing system for temperature and humidity profiling.