Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 1
Catalogue of Company Standards
RT/LS/CAT001
ISSUE 46 7th August 1st October 2004
This document is the property of Network Rail Infrastructure
Ltd. It shall not be reproduced in whole or in part, nor disclosed
to a third party, without the written permission of the standard
owner. Copyright 2004 Network Rail Infrastructure Ltd.
Network Rail Infrastructure Ltd. is part of the Network Rail
Group of Companies.
-
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 2
Whos Who & Support Contacts
Network Rail Standards Development Process Team
Technical Problems and Search Support Contacts (Please note it
will help save time if you have available your System Number,
Company Name and the Product Code. For CD, the Product Code is
written on the right hand side of the disc eg RTL1, RTL5. For
Online the code is RTI. For Online Historic the code is RTIH)
Paul McAleer Head of Standards Development Process
020 7557 8715 (085 78715)
Technical Support Installation and technical matters Phone:
01344 404428 or email [email protected]
Keith Hope Standards Change Co-ordinator Steve Smith Standards
Change Co-ordinator John Winnifrith Standards Change Co-ordinator
Richard Geldart Standards Change Co-ordinator
020 7557 8691 (085 78691) 020 7557 8695 (085 78695) 020 7557
8462 (085 78462) 020 7557 8768 (085 78768)
Customer Support For search queries and all other enquiries
Phone: 01344 404429 or email [email protected]
Caroline Peach Standards Publication Co-ordinator Sheriff
Olujide Standards Publication Assistant
020 7557 8679 (085 78679) 020 7557 8832 (085 78832)
Other Information Network Rail Company Standards Subscriptions
IHS Technical Indexes Ltd Phone: 01344 404409
Chris Folwell Database Co-ordinator Johanna Grant Database
Assistant
020 7557 8714 (085 78714) 020 7557 8677 (085 78677)
Network Rail Company Standards Hard Copy Document Centre Rapidoc
Phone: 01344 861666 or email: [email protected]
Kim Yarger Team Secretary
020 7557 9635 (085 79635)
Railway Group Standards Rail Safety & Standards Board
Enquiry Desk Phone: 020 7904 7518 (085 77518)
Network Rail Technical Drawings National Records Group Phone:
01904 524674 (03 74674)
Email: [email protected] For all queries about
the content of the Company Standards please, in the first instance,
contact the Publication Team
Hard Copy Purchase of Rule Books; Handbooks & Forms Willsons
Printers Limited Phone: 01636 702334 (03 79510)
Updated 2nd July 2004
On 3rd February 2003 Railtrack officially changed its name to
Network Rail. Railtrack Company Standards will now be officially
known as Network Rail Company Standards. Newly published standards
from April 2003 will reflect this name change. All existing
standards are still valid and will be changed as and when the
standards are reviewed
-
Contents
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 3
Contents 1. About this catalogue
....................................................................................................................6
1.1. How to use this
catalogue....................................................................................................................................
7 1.1.1. Example of Typical Entry
.............................................................................................................................................................
7 1.1.2. The Numbering
System................................................................................................................................................................
7 1.1.3. Quick Find Using the
Index.....................................................................................................................................................
8 1.1.4. Referenced
Documents................................................................................................................................................................
8 1.1.5. Coloured
Pages..............................................................................................................................................................................
8 1.1.6. Compliance and Implementation
...............................................................................................................................................
9 1.1.7. Technical Standards for Inter-operability.
................................................................................................................................
9 1.1.8. Notified National
Standards........................................................................................................................................................
9 1.1.9. Direct Maintenance Supplementary
Instructions....................................................................................................................
9 1.1.10. Ordering and Price
List............................................................................................................................................................10
2. Category Index of Network Rail Company
Standards............................................................11
2A. General
Information.............................................................................................................................................11
2A1. Changes from previous
issue......................................................................................................................................................11
2A1.1. New or Re-issued Standards
.................................................................................................................................................................11
2A1.2. Deleted or Withdrawn Standards
........................................................................................................................................................13
2A1.3. Restricted Documents
............................................................................................................................................................................15
2A1.4. Network Rail
Catalogues........................................................................................................................................................................15
2B. Contracts & Procurement
Directorate............................................................................................................17
2B1. Contracts &
Procurement...........................................................................................................................................................17
2B1.1.
Procedures..................................................................................................................................................................................................17
2B2. Supplier
Accreditation..................................................................................................................................................................18
2B2.1.
Procedures..................................................................................................................................................................................................18
2B2.2. Guidance
Notes.........................................................................................................................................................................................18
2C. Engineering Directorate
......................................................................................................................................19
2C1. Electrification
.................................................................................................................................................................................19
2C1.1. Specifications
.............................................................................................................................................................................................19
2C1.2.
Procedures.................................................................................................................................................................................................35
2C1.3. Codes of Practice
.....................................................................................................................................................................................37
2C1.4. Guidance
Notes........................................................................................................................................................................................39
2C1.5. Work
Instructions....................................................................................................................................................................................40
2C2. Business Engineering
....................................................................................................................................................................41
2C2.1. Specifications
.............................................................................................................................................................................................41
2C2.2.
Procedures.................................................................................................................................................................................................41
2C3.
Ergonomics.....................................................................................................................................................................................42
2C3.1. Specifications
.............................................................................................................................................................................................42
2C3.2.
Procedures.................................................................................................................................................................................................42
2C3.3. Guidance
Notes........................................................................................................................................................................................42
2C4. Plant
.................................................................................................................................................................................................43
2C4.1. Specifications
.............................................................................................................................................................................................43
2C4.2.
Procedures.................................................................................................................................................................................................49
2C4.3. Codes of Practice
.....................................................................................................................................................................................50
2C5. Signal
Engineering..........................................................................................................................................................................51
2C5.1. Specifications
.............................................................................................................................................................................................51
2C5.2.
Procedures.................................................................................................................................................................................................59
2C5.3. Codes of Practice
.....................................................................................................................................................................................62
2C5.4. Guidance
Notes........................................................................................................................................................................................76
2C5.5. Special Inspection
Notices......................................................................................................................................................................78
2C5.6. Work
Instructions....................................................................................................................................................................................82
2C6. Civil
Engineering............................................................................................................................................................................83
2C6.1. Specifications
.............................................................................................................................................................................................83
2C6.2.
Procedures.................................................................................................................................................................................................87
2C6.3. Codes of Practice
.....................................................................................................................................................................................
88
-
Contents
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 4
2C7.
Telecommunications....................................................................................................................................................................
91
2C7.1. Specifications
.............................................................................................................................................................................................
91 2C7.2.
Procedures.................................................................................................................................................................................................
93 2C7.3. Codes of
Practice.....................................................................................................................................................................................
94 2C7.4. Guidance
Notes........................................................................................................................................................................................
95 2C7.5. Special Inspection Notices
.....................................................................................................................................................................
95
2C8. Track
Engineering.........................................................................................................................................................................
96 2C8.1. Specifications
.............................................................................................................................................................................................
96 2C8.2.
Procedures...............................................................................................................................................................................................
102 2C8.3. Codes of
Practice...................................................................................................................................................................................
103 2C8.4. Permanent Way Special
Instructions.................................................................................................................................................
105
2C9. Rail Vehicle Engineering
............................................................................................................................................................106
2C9.1. Specifications
...........................................................................................................................................................................................
106 2C9.2. Codes of
Practice...................................................................................................................................................................................
106
2D. Information Management Directorate
..........................................................................................................
107 2D1. Information
Management..........................................................................................................................................................107
2D1.1. Procedures
..............................................................................................................................................................................................
107 2D1.2.
Specifications...........................................................................................................................................................................................
107
2E. Major Projects and Investments
......................................................................................................................
108 2E1. Major Projects and
Investments...............................................................................................................................................108
2E1.1.
Procedures................................................................................................................................................................................................
108 2E1.2. Guidance Notes
......................................................................................................................................................................................
108
2F. Maintenance
Directorate...................................................................................................................................
109 2F1.
Maintenance..................................................................................................................................................................................109
2F1.1. Specifications
............................................................................................................................................................................................
109 2F1.2.
Procedures................................................................................................................................................................................................
109 2F1.3. Codes of
Practice....................................................................................................................................................................................
111 2F1.4. Guidance
Notes.......................................................................................................................................................................................
111
2G. Railway Estates Directorate
............................................................................................................................
112 2G1. Railway Estates Policy and
Planning........................................................................................................................................112
2G1.1. Guidance Notes
.....................................................................................................................................................................................
112 2H. Safety & Compliance Directorates
...............................................................................................................
113
2H1. Interoperability &
Acceptance.................................................................................................................................................113
2H1.1. Procedures
..............................................................................................................................................................................................
113
2H2.
Assurance.....................................................................................................................................................................................114
2H2.1.
Specifications...........................................................................................................................................................................................
114 2H2.2. Procedures
..............................................................................................................................................................................................
114 2H2.3. Codes of
Practice...................................................................................................................................................................................
114
2H3. Standards Development Process
............................................................................................................................................115
2H3.1. Procedures
..............................................................................................................................................................................................
115
2H4. Environment Policy
....................................................................................................................................................................116
2H4.1.
Specifications...........................................................................................................................................................................................
116 2H4.2. Procedures
..............................................................................................................................................................................................
116 2H4.3. Guidance Notes
.....................................................................................................................................................................................
117
2H5. Fire Safety Policy
........................................................................................................................................................................118
2H5.1. Procedures
..............................................................................................................................................................................................
118 2H5.2. Codes of
Practice...................................................................................................................................................................................
118
2H6. Operational Safety Policy
.........................................................................................................................................................119
2H6.1.
Specifications...........................................................................................................................................................................................
119 2H6.2. Procedures
..............................................................................................................................................................................................
120 2H6.3. Codes of
Practice...................................................................................................................................................................................
122 2H6.4. Guidance Notes
.....................................................................................................................................................................................
122
2H7. Safety Case Management
..........................................................................................................................................................123
2H7.1. Procedures
..............................................................................................................................................................................................
123
2H8. Accident Investigation
...............................................................................................................................................................124
2H8.1. Procedures
..............................................................................................................................................................................................
124 2H8.2. Guidance Notes
.....................................................................................................................................................................................
124
2H9. Occupational Health & Safety
Policy......................................................................................................................................125
2H9.1.
Specifications...........................................................................................................................................................................................
125 2H9.2. Procedures
..............................................................................................................................................................................................
126
-
Contents
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 5
2H10. Security Specialist
....................................................................................................................................................................
128 2H10.1.
Procedures.............................................................................................................................................................................................128
2H10.2. Codes of
Practice.................................................................................................................................................................................128
2H10.3. Guidance Notes
...................................................................................................................................................................................128
2H11. Risk
.............................................................................................................................................................................................
128 2H11.1. Guidance Notes
...................................................................................................................................................................................128
2J. Product
Specifications..........................................................................................................................................129
2J1. Electrification &
Plant..................................................................................................................................................................
129 2J2. Railway Systems
...........................................................................................................................................................................
131 2J3. Signal
Engineering.........................................................................................................................................................................
132 2J4. Civil
Engineering...........................................................................................................................................................................
136 2J5. Railway Estates Policy and Planning
.........................................................................................................................................
136 2J6. Telecommunications
...................................................................................................................................................................
137 2J7. Track
..............................................................................................................................................................................................
138
2L. Documents Archived in the Last 14
Months.................................................................................................142
2L1. Historic
06/03..............................................................................................................................................................................
142 2L2. Historic
08/03..............................................................................................................................................................................
142 2L3. Historic
10/03..............................................................................................................................................................................
142 2L4. Historic
12/03..............................................................................................................................................................................
143 2L5. Historic
02/04..............................................................................................................................................................................
143 2L6. Historic
04/04..............................................................................................................................................................................
144 2L7. Historic
06/04..............................................................................................................................................................................
148 2L8. Historic
08/04..............................................................................................................................................................................
148
3. Reference Guide to Group
Standards.....................................................................................150
4. Railway Group Standards and Catalogue Index
....................................................................161
4.1. Railway Group Standards retained by Network Rail
.................................................................................161
4.2. Catalogue Index
..................................................................................................................................................162
-
1. About this Catalogue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 6
1. About this catalogue Welcome to the Network Rail Catalogue of
Company Standards, it is divided into 4 sections:
Section 1: This introduction, including a How to use this
catalogue gives the user information on the Company Standards
numbering system and the process for ordering documents.
As a result of customer concerns over numbering change, and the
suspension of the Project Release project, we will revert to the
numbering system as at June 2000. Standards given the new numbers
from June to October 2000 will not be renumbered. If you have any
queries please contact the Business Standards Team on 020 7830 5687
(085 75687).
Section 2 is the Category Index of Network Rail Company
Standards which lists all the
o Specifications, o Product Specifications, o Procedures, o
Codes of Practice, o Work Instructions, o Guidance Notes, o Special
Inspection Notices
by Directorate, Discipline and then by number, title, issue and
authorisation. There is also a list of changes from the previous
issue, and all standards that have been deleted in the last 14
months.
The Category Index of Network Rail Company Standards is divided
into the following Directorates:
o Contracts & Procurement o Engineering o Information
Management o Maintenance o Major Projects and Investments o Railway
Estates o Safety & Compliance
Product Specifications are grouped separately, in numeric order,
for ease of reference. Each Directorate is divided into
recognisable sections (e.g. Civil Engineering; Operational Safety
Policy, etc.) with a summary of each document to assist the user in
identifying standards applicable to their business. In addition,
you will find information on the mandatory requirements for each
Company Standard as well as information relating to compliance,
where applicable.
Section 3: A Reference Guide to Group Standards is a quick
reference for users, which shows an up-to-date listing of Railway
Group Standards at present in force. For further information
contact the Rail Safety & Standards Board Enquiry Desk on 020
7557 8774 (internal 085 78774).
Section 4: Railway Group Standards and Catalogue Index. This
section contains a listing of the Railway Group Standards retained
by Network Rail, and finally an Index to this catalogue.
-
1. About this Catalogue
Issue 46: 7th August 1st O
1.1. How to use this catalogue
1.1.1. Example of Typical Entry
RT/CE/S/054 Inspection of Cast Crossings and Cast Vees in the
Track Issue Date Status Price Colour Compliance Implementation * E
X A M P L E 2 (1) Aug 03 (Aug 96) Up-Issued D 02/08/03 02/08/03
1.1.2. The Numbering System
RT / x follows:
Six types of docume
TERM Network Rail Comp
Network Rail Comp
Network Rail Comp
n
o
Issue Number and Issue Date See note.
* Indicates a new or up-issued document (For the current
catalogue issue only)
New or Up-issued.Blank = no change
Price bandSee 1.1.9.
Yes = colour pages available separately
Compliance & Implementation dates, used for new and
up-issued standards. See note.
Note: See section 1.1.6 for more details on Compliance &
Implementation, including Issue Number and Issue Date / y / z The
general format of a typical Standard Reference Number is as
q ctober 2004 Catalogue of Company Standards Page 7
nt are published as Network Rail Company Standards. The purpose
of each is as follows:
DEFINITION any Specifications These set mandatory requirements
upon Network Rail s employees, and also, when
designated in an agreed contract or lease, upon contractors or
tenants. They may contain procedural requirements. They require a
formal remit, a Business case and Stakeholder Review.
any Product Specifications These have a special status in that
applicants for product acceptance shall: demonstrate compliance
with the Product Specification; or
demonstrate that their product has equivalent performance to
that required by the Product Specification and is thus
acceptable.
They do not require a Business Case, but require a formal remit
& Stakeholder Review.
any Procedures These set mandatory requirements upon Network
Rail employees only. They are not always procedural in nature.
These procedures may be incorporated in contracts under the
authority of a Network Rail Designated Employer s Representative.
They require a Formal Remit, a Business Case and Stakeholder
Review.
3 to 5 digit identifying number
1 or 2 character reference for the six types of Standard C Code
of Practice, G Guidance P Procedure PS Product Specification S
Specification WI Work Instruction
1 or 2 character reference for the Standard Ownership: CE
Track/Structures, Operations/Control Management E Electrification
& Plant, Railfleet, Telecommunications, SignallingK Procurement
LS Line Safety
RT Denotes a Network Rail Standard.
This is the general format used for the majority of entries in
the catalogue. Please note however, that there are a few
exceptions, not shown here.
p
-
1. About this Catalogue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 8
Network Rail Company Codes of Practice These Non-Mandatory
Documents communicate good practice for use by Network Rail s
employees and contractors. An alternative practice that achieves
the same goals may be adopted provided that adequate records are
kept, although prior acceptance by Network Rail may be required.
Further advice is available from the Standard Owner. They require a
formal remit & Stakeholder Reviewed only.
Network Rail Company Work Instructions These are Network Rail s
equivalent of Specified Operations Publications. They are mandatory
and specify actions to be undertaken by employees of Network Rail
and others to ensure safety while working on Network Rail
Controlled Infrastructure. They differ from Company Specifications
in that they are task-based. These require a formal remit,
stakeholder review and a business case.
Network Rail Company Guidance Notes These are intended to
provide information for Network Rail and others on the basis of
past experience and knowledge. They are advisory documents and do
not necessarily represent best practice. They do not require a
Business Case or Stakeholder Review.
Rapid Response The Rapid Response Procedure shall enable Network
Rail to authorise Standards Change which are required more urgently
than the usual procedures would permit.
The Rapid Response Procedure may only be used where both the
following criteria are met:
either there is:
o an immediate threat to safety, where safety would be
prejudiced through delay arising from the usual procedures; or
o a time critical non-safety issue which cannot readily be dealt
with via the usual procedures or a non-compliance; and
the solution which constitutes the Standards Change is readily
apparent.
Standards Change issued under the Rapid Response Procedure shall
have an
applicability of one calendar year from Implementation Date.
Within 2 months of the Implementation Date, the Sponsor shall
regularise the
Standards Change issued under the Rapid Response Procedure
through the usual procedures.
1.1.3. Quick Find Using the Index
If you have a document you want to find the status of, the
quickest way to find your document is to look in the Index at the
end of the catalogue. All current standards are listed, along with
the page number where you will find more information on that
document.
1.1.4. Referenced Documents
Some Network Rail Company Standards grant mandatory or advisory
status to other documents produced by Network Rail or other
organisations. Referenced Documents include a wide range of
documents inherited from the former British Rail Board (BRB) or
developed by Network Rail, e.g. Signalling Special Inspection
Notices (SINs), Railway Executive Permanent Way (REPW) drawings,
and the Overhead Line Equipment Master Index (OLEMI).
Referenced Documents derive their authority from Network Rail
Company Standards and therefore shall only be applied in the
circumstances and to the extent shown in any relevant Network Rail
Company Standard.
1.1.5. Coloured Pages
Some documents contain coloured pages, and these are marked
where relevant. These colour pages may be purchased separately from
the Rapidoc Document Centre. Please see the section on ordering
documents for contact details.
-
1. About this Catalogue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 9
1.1.6. Compliance and Implementation
Each Mandatory Network Rail Company Standard remains in force
and has to be complied with until replaced or withdrawn.
The issue of a replacement standard does not necessarily cancel
a previous issue until the Implementation period has been completed
and the Compliance date reached. This is normally at least two
months from the issue date of a Network Rail Company Standard. This
applies to re-issues of existing standards as well as replacements
and deletions.
To assist users, the catalogue entry for a superseded standard
will henceforth show the standard that replaces it, and vice versa.
Users will thus be able to see not only the standard to which they
presently work, but also which standard they will need to follow in
future. An example is shown below:
RT/E/S/10661 Signalling Maintenance Task Intervals Issue Date
Status Price Colour Compliance Implementation * EXAMPLE 4 (3) Feb
04 (Apr 03) Up-issued C 01/04/04 01/04/04
The current standard is shown in (grey), indicating that the new
edition, shown in black, will supersede it.
For reasons of clarity, this approach has been confined to the
catalogue (paper and electronic versions), and does not appear in
the menu pages of the CD-ROM.
1.1.7. Technical Standards for Inter-operability.
Technical Standards for Inter-operability (TSIs) are derived
from the following two pieces of European Union legislation:
z Directive 2001/16/EC on the Interoperability of the
Trans-European Conventional Rail System; and
z Directive 96/48/EC on the Interoperability of the
Trans-European High Speed Rail System.
There is currently a major piece of work in hand by Rail Safety
and Standards Board to identify any issues or conflicts between
TSIs for High speed and RGSs (Railway Group Standards). The
objective is to resolve or remove any conflicts where possible by
amending the RGS. It is anticipated that this work will generate a
significant amount of work on RGSs.
Where this work identifies such issues, it is the Rail Safety
and Standards Board intention to publish the identified conflicts
in a Railway Group Guidance Note (GN/GE8550) in order to provide
guidance to the industry pending the resolution of the conflict and
amendment of the RGSs.
RGSs are classified as being subordinate.
1.1.8. Notified National Standards
All notified standards in this catalogue are marked as in the
left hand column.
1.1.9. Direct Maintenance Supplementary Instructions
Following Network Rail s decision to bring certain track
maintenance jobs in-house a number of standards are being
incorporated into a new catalogue (RT/LS/CAT007), marked thus: ,
containing supplementary information. It is essential that you
first read and understand the supplement pertaining to the standard
before proceeding to the standard. You must then apply the
requirements of the supplement to the standard.
With regard to Direct Maintenance Transition, a new catalogue,
RT/LS/CAT007 'Direct Maintenance Supplementary Instruction
Catalogue' has been introduced. This catalogue contains a suite of
Direct Maintenance Instructions, which necessarily modify existing
Company Standards where they do not currently cover maintenance
undertaken directly by Network Rail employees. The changes required
are minor and there is no material change to the technical
requirements of the Company Standard. A Direct Maintenance
Supplementary Instruction holds the same status as the Company
Standard it modifies.
The Supplementary Instructions will be superseded after the
modifications have been made to the relevant standards.
-
1. About this Catalogue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 10
1.1.10. Ordering and Price List
Complete suite of Standards in electronic format. Subscription
only, from:
Paper copies available individually or on subscription from:
IHS Technical Indexes Willoughby Road Bracknell RG12 8DW Tel:
01344 404409 Fax: 01344 404421
Network Rail Document Centre IHS Rapidoc IHS Technical Indexes
Willoughby Road Bracknell RG12 8DW Tel: 01344 861666 Fax: 01344
714440 Email: mailto:[email protected]
Most Network Rail Company Standards are priced according to the
number of pages in them and are divided into 6 main price bands;
these price bands are:
Price Band A B C D E F Price 8 11 21 32 42 63
Price list correct at date of publishing.
Please note that certain publications are not within the above
price bands, please contact Rapidoc (details above) for the prices
of these documents.
Orders received will be dispatched within five working days.
When placing an order for Standards, please have the following
details to hand:
Contact and delivery details, Standard No., Title, Price,
Quantity.
Please also have your credit card/payment details to hand
Please note: Company Standards for Network Rail Employees only
are available from Connect under Business Standards.
-
2. Company Standards A. General Information Changes from
previous Issue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 11
2. Category Index of Network Rail Company Standards 2A. General
Information
2A1. Changes from previous issue
2A1.1. New or Re-issued Standards
The following standards are New or Re-issued.
Standard No Title Issue Issue Date Compliance Implementation
RT/CE/C/041
Structures Condition Marking Index Handbook for Bridges
Issue 3
7-Aug-04 07-Aug-04 07-Aug-04
RT/CE/C/045
Code of Practice for Terms and Definitions for Use in Civil
Engineering Standards
Issue 1
7-Aug-04 01-Sep-04 01-Sep-04
RT/CE/S/044 Design & Construction of Undertrack Crossings
Issue 2 7-Aug-04 01-Nov-04 07-Aug-04
RT/CE/S/048 Standards of Competence for Examination of a Bridge
Following a Bridge Strike
Issue 4 7-Aug-04 02-Oct-04 02-Oct-04
RT/CE/S/049 Track Design Handbook Issue 8 7-Aug-04 07-Aug-04
07-Aug-04
RT/CE/S/071 Design of Earthworks, Earthwork Remediations and
Geotechnical aspects of Foundations for Structures
Issue 2 7-Aug-04 01-Nov-04 01-Nov-04
RT/CE/S/142 Management of Abnormal Road Loads Issue 1 7-Aug-04
07-Feb-05 07-Feb-05
RT/D/P/095 Determining High Risk Sites for Wrong Side Track
Circuit Failures in Leaf Fall Areas
Issue 1 7-Aug-04 07-Aug-04 07-Aug-04
RT/D/P/096 Determining High Risk Sites for Low Rail Adhesion
Issue 1 7-Aug-04 07-Aug-04 07-Aug-04
RT/D/S/002 Driving Cab Passes Issue 3 7-Aug-04 07-Aug-04
07-Aug-04
RT/E/C/11115 Correlation of Signalling Records Issue 3 7-Aug-04
07-Aug-04 07-Aug-04
RT/E/C/17904 Risk Analysis of Signalling Relays Issue 1 7-Aug-04
07-Aug-04 07-Aug-04
RT/E/C/19020 Signalling Equipment Technical Advice Notice
(SIGTAN020) Signalling Relays
Issue 3 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/C/19272 Signalling Equipment Workshop Engineering Notice
(SIGWEN021) Signalling Relays
Issue 1 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/P/10024 Signaller's Operating Guide for the Use of the IECC
Signalling Workstation
Issue 4 7-Aug-04 01-Oct-04 01-Oct-04
RT/E/P/11120 Process for Management of Signal Engineering
Technical Instructions and Notice Boards
Issue 6 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/P/19607 Management of Overlapping and Parallel Signalling
Design
Issue 1 7-Aug-04 02-Oct-04 02-Oct-04
RT/E/S/10040 IECC Applications Manual Contents Issue 6 7-Aug-04
07-Aug-04 07-Aug-04
RT/E/S/10662 Process for Introduction of New or Revised
Maintenance Regimes for Signalling Assets
Issue 2 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/S/11129 Life Management of Signalling Relays, Searchlight
and Banner Signals
Issue 3
7-Aug-04 07-Aug-04 07-Aug-04
RT/E/S/11630 BR930 Series Pin Code Allocations and Contact
Arrangements
Issue 7 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/S/17002 SSI Applications Manual Contents Issue 13 7-Aug-04
07-Aug-04 07-Aug-04
RT/E/WI/00102 TI21 Track Circuit Risk Based Maintenance Issue 3
7-Aug-04 07-Aug-04 07-Aug-04
RT/E/WI/00103 HW Risk Based Maintenance Issue 1 7-Aug-04
07-Aug-04 07-Aug-04
-
2. Company Standards A. General Information Changes from
previous Issue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 12
Standard No Title Issue Issue Date Compliance Implementation
RT/E/WI/00104 TPWS Track Subsystem Risk Based Maintenance Issue
2 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/WI/00105 AzLM Axle Counter System Risk-Based Maintenance
Issue 2 7-Aug-04 07-Aug-04 07-Aug-04
RT/E/WI/00110 Maintenance of Electrification, Plant, Signalling
and Telecommunications Equipment, Incorporating Asbestos Materials
or Components
Issue 1
1-May-04 21-May-04 21-May-04
RT/LS/C/101 Managed Stations Fire Safety Issue 4 7-Aug-04
07-Aug-04
RT/LS/C/102 Operational Estate Fire Safety Issue 4 7-Aug-04
07-Aug-04
RT/LS/CAT001 Catalogue of Company Standards 46 07-Aug-04
RT/LS/CAT005 Index of Network Rail Documents Relating to
Signalling & communications Equipment - Part 3 Typical
Circuits
22 7-Aug-04 07-Aug-04
RT/LS/CAT006 Index of Network Rail Documents Relating to
Signalling & Communications Equipment - Part 4 Equipment and
Systems Specifications
10 7-Aug-04 07-Aug-04
RT/LS/CAT007 Direct Maintenance Supplementary Instruction
Catalogue
2 7-Aug-04 07-Aug-04
RT/LS/G/00014
Contractor Assurance System Issue 2 7-Aug-04 07-Aug-04
07-Aug-04
RT/LS/P/200
Network Rail Security Manual Issue E1 7-Aug-04 07-Aug-04
07-Aug-04
RT/LS/P/250
Incident Response - Planning & Management Manual Issue E1
7-Aug-04 07-Aug-04 07-Aug-04
ff
-
2. Company Standards A. General Information Changes from
previous Issue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 13
2A1.2. Deleted or Withdrawn Standards
Standard No Title Issue
Deleted Date
Deleted Change Made
RT/CE/C/041 Structures Condition Marking Index Handbook Issue 2
Aug 04 Superseded by Issue 3
RT/CE/S/044 Undertrack Crossings Issue 1 Aug 04 Superseded by
Issue 2
RT/CE/S/048 Standards of Competence for Examination of a Bridge
following a Bridge Strike
Issue 3 Aug 04 Superseded by Issue 4
RT/CE/S/049 Track Design Handbook Issue 7 Aug 04 Superseded by
Issue 8
RT/CE/S/071 Design of Earthworks and Earthworks Remediations
Issue 1 Aug 04 Superseded by Issue 2
RT/D/P/021 Acceptance- Audit & Review of the Contractor's
Safety Case
Issue 2 Aug 04 Superseded by RT/LS/P/052
RT/D/P/022 Management of the Monitoring of Contracts and
Corrective Actions
Issue 7 Aug 04 Withdrawn
RT/D/S/002 Driving Cab Passes Issue 2 Aug 04 Superseded by Issue
3
RT/D/S/004 Railtrack Specification for Determining High Risk
Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas
Issue 2 Aug 04 Superseded by RT/D/P/095
RT/D/S/005 Railtrack Specification for Determining High Risk
Sites for Low Rail Adhesion as Defined in Group Standard
GO/RT3356
Issue 2 Aug 04 Superseded by RT/D/P/096
RT/E/C/10048 Signalling Relay and Searchlight Mechanism
Servicing Issue 1 Aug 04 Superseded by RT/E/S/11129 Issue 3
RT/E/C/10094 Signal Light Beam Alignment (SG21) Issue 2 Aug 04
Superseded by RT/E/S/10660
RT/E/C/10095 Signal Lamp Maintenance Addendum to Signal
Maintenance Specification (SMS) SG31
Issue 2 Aug 04 Superseded by RT/E/S/10660
RT/E/C/11115 Correlation of Signalling Records Issue 2 Aug 04
Superseded by Issue 3
RT/E/C/19004 SIGTAN 004 Replacing relays - type sj 8211 relay
units gec geographical units
Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3
RT/E/C/19011 SIGTAN 001 Silver to Silver Contacts - DC Polarised
Moving Iron Relays
Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3
RT/E/C/19020 Signalling Equipment Technical Advice Notice
(SIGTAN020) AEI - GRS Type M
Issue 2 Aug 04 Superseded by Issue 3
RT/E/C/19031 Signalling Equipment Technical Advice Notice
(SIGTAN031) Full-Size Plug-In Relays
Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3
RT/E/C/19034 (SIGTAN034) Thermal Timer Relays Issue 1 Aug 04
Superseded by RT/E/C/19020 Issue 3
RT/E/C/19255 Signalling Equipment Workshop Engineering Notice
(SIGWEN004) GEC - GS Geographical Units
Issue 1 Aug 04 Superseded by RT/E/C/19272
RT/E/C/19256 SIGWEN 005 - Westinghouse Signals style 'P' relays
Issue 2 Aug 04 Superseded by RT/E/C/19272
RT/E/C/19260 SIGWEN 009 - Westinghouse Signals style 'B' relays
Issue 2 Aug 04 Superseded by RT/E/C/19272
RT/E/C/19261 SIGWEN 009 - Westinghouse Signals style 'B' relays
Issue 1 Aug 04 Superseded by RT/E/C/19272
RT/E/C/19264 Signalling Equipment Workshop Engineering Notice
(SIGWEN013) GEC-GS Style Z Relays
Issue 1 Aug 04 Superseded by RT/E/C/19272
RT/E/C/19267 Signalling Equipment Workshop Engineering Notice
(SIGWEN016) Setting Thermal Timer Relays
Issue 1 Aug 04 Superseded by RT/E/C/19272
RT/E/P/10024 Signallers Operating Guide for the use of IECC
Signalling Workstation
Issue 3 Aug 04 Superseded by Issue 4
RT/E/P/11120 Process for Management of Signal Engineering
Technical Instructions and Notice Boards
Issue 5 Aug 04 Superseded by Issue 6
RT/E/S/10040 IECC Applications Manual Contents Issue 5 Aug 04
Superseded by Issue 6
RT/E/S/10662 Process for the Introduction of New or Revised
Maintenance Regimes for Signalling Assets
Issue 1 Aug 04 Superseded by Issue 2
RT/E/S/11129 Life Management of Signalling Relays Issue 2 Aug 04
Superseded by Issue 3
RT/E/S/11630 BR930 Series Pin Code Allocations December 2003 and
Contact Arrangements
Issue 6 Aug 04 Superseded by Issue 7
RT/E/S/17002 SSI Applications Manual Contents Issue 12 Aug 04
Superseded by Issue 13
-
2. Company Standards A. General Information Changes from
previous Issue
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 14
Standard No Title Issue
Deleted Date
Deleted Change Made
RT/E/WI/00102 TI21 Track Circuit Risk Based Maintenance Issue 2
Aug 04 Superseded by Issue 3
RT/E/WI/00104 Network Rail Company Work Instruction TPWS Risk
Based Maintenance
Issue 1 Aug 04 Superseded by Issue 2
RT/E/WI/00105 AzLM Axle Counter System Risk Based Maintenance
Issue 1 Aug 04 Superseded by Issue 2
RT/LS/C/101 Managed Stations Fire Safety Issue 3 Aug 04
Superseded by Issue 4
RT/LS/C/102 Operational Estate Fire Safety Issue 3 Aug 04
Superseded by Issue 4
RT/LS/CAT005 Index of Network Rail Documents Relating to
Signalling & communications Equipment - Part 3 Typical
Circuits
Issue 21 Aug 04 Superseded by Issue 22
RT/LS/CAT006 Index of Railtrack Documents Relating to Signalling
and Communications Equipment: Part 1 - Equipments and Systems
Specifications
Issue 9 Aug 04 Superseded by Issue 10
RT/LS/CAT007 Direct Maintenance Supplementary Instruction
Catalogue
Issue 1 Aug 04 Superseded by Issue 2
RT/LS/G/00014 Contractor Assurance System Issue 1 Aug 04
Superseded by Issue 2
Note regarding Standards superseded or deleted in April 2004
In the last 2 issues of the catalogue (44 and 45), it has been
noted that the listing for Standards superseded or replaced in
April 2004 was incomplete. A full listing may now be found on page
151
-
2. Company Standards A. General Information
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 15
2A1.3. Restricted Documents
The following Standards are for Network Rail Use Only and are
not Available outside the Company. There are currently 8 procedures
listed in the Catalogue but unavailable on the CD-ROM or on the
Company Standards Website. Reference Title Issue Issue Date HQ
Owner
RT/D/P/020 Management of RT1A Asset Change Proposals 6 Aug-00
Business Engineering
RT/D/P/027 Infrastructure Maintenance Contracts Changes to
Contract Lump Sums, Prices, Targets and Fees
5 Apr-00 Supply Chain
RT/D/P/030 RTIA; IMC2 & IMC2000 Payment Cost Control and
Reporting 8 Dec-02 Supply Chain
RT/D/P/034 Delegation and Use of Contractual Powers RT1A and
IMC2 4 Apr-00 Supply Chain
RT/D/P/036 Monitoring of Contractor s Stewardship, Progress and
Financial Reports
5 Apr-00 Supply Chain
RT/D/P/047 Management of Infrastructure Maintenance Contract
Regimes 6 Apr-00 Supply Chain
RT/E/P/02009 Engineering Management Projects 2 Oct-01 Business
Engineering
RT/LS/P/052 Accreditation and Development of Suppliers 1 Apr-04
Supplier Accreditation
2A1.4. Network Rail Catalogues
RT/LS/CAT001 Catalogue of Company Standards Issue Date Status
Price Colour Compliance Implementation * 46 Aug 04 Up-Issued
The Company Standards Catalogue, formerly known as The Line
Standards Catalogue, lists Standards issued by Engineering, Safety
& Environment, and Contract & Supply.
Index of Network Rail Documents Relating to Signalling and
Communications Equipment: RT/LS/CAT003 Part 1: Mechanical &
Electrical Drawings Issue Date Status Price Colour Compliance
Implementation 4 Oct 00
This catalogue lists documents (drawings) relating to signalling
equipment Mechanical and Electrical Drawings.
RT/LS/CAT004 Part 2: Signalling Structure Drawings Issue Date
Status Price Colour Compliance Implementation 4 Feb 00
This catalogue lists documents (drawings) relating to signalling
equipment Signalling Structure Drawings.
RT/LS/CAT005 Part 3: Typical Circuits Issue Date Status Price
Colour Compliance Implementation * 22 (21) Aug 04 (Feb 04)
Up-Issued Yes 07/08/04
This catalogue lists documents (drawings) relating to signalling
equipment Typical Circuits.
-
2. Company Standards A. General Information
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 16
RT/LS/CAT006 Part 4: Equipment & Systems Specifications
Issue Date Status Price Colour Compliance Implementation * 10 (9)
Aug 04 (Aug 01) Up-Issued 07/08/04
This catalogue lists documents (drawings) relating to signalling
equipment Equipment and Systems Specifications. The standards shown
in catalogue 6 are for reference purposes only, they may not
reflect today s requirements nor Network Rail s future asset
strategy.
RT/LS/CAT007 Direct Maintenance Supplementary Instruction
Catalogue Issue Date Status Price Colour Compliance
Implementation
* 2 (1) Aug 04 (Apr 04) Up-Issued Phone 07/08/04
This catalogue contains Supplementary Instructions when
maintenance is directly managed internally within Network Rail the
existing Company Standard to which it pertains will not be wholly
appropriate. The changes required are minor and there is no
material change to the technical requirements of the Company
Standard. The changes are to be considered made to the existing
Company Standard published by Business Standards only where
maintenance is undertaken directly by Network Rail employees.
RT/ETE/INDEX DC Electric Traction Equipment Drawing Index Issue
Date Status Price Colour Compliance Implementation 2 Aug 00
This document lists current electrical track equipment (ETE)
drawings, together with the equivalent superseded drawings.
-
2. Company Standards B. Contracts & Procurement Contracts
& Procurement
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 17
2B. Contracts & Procurement Directorate
2B1. Contracts & Procurement
2B1.1. Procedures
RT/D/P/026 Reporting Trends in Infrastructure Maintenance
Contractors Accidents and Incidents Issue Date Status Price Colour
Compliance Implementation 5 Apr 00 C
This procedure details the rles and responsibilities of Network
Rail staff in considering trends in Contractors accidents and
incidents and assisting in the setting up of Action Plans to reduce
the likelihood of similar occurrences.
Mandatory upon: Network Rail Standards Ownership: Contracts
& Procurement
RT/D/P/045 Change During the Course of Track Renewals Work Issue
Date Status Price Colour Compliance Implementation 1 Nov 96 B
It is essential that the Track Renewals Contractor has either a
Contingency Plan in place for problems encountered in complying
with Specifications/Standards during Track Renewals Works or is
aware of the Procedure within Network Rail for resolution of the
problem. This procedure sets out the roles and responsibilities in
relation to dealing with problems encountered during Track Renewals
Works.
Mandatory upon: Network Rail Standards Ownership: Contracts
& Procurement
RT/D/P/064 Monitoring of the Track Litter Clearance Contract
(Station Areas) Issue Date Status Price Colour Compliance
Implementation 2 Apr 00 B
This procedure lays down the principles for monitoring contracts
for clearance of litter from the track in station areas both where
this activity is carried out under the Infrastructure Maintenance
Contract and under separate bespoke contracts.
Mandatory upon: Network Rail Standards Ownership: Contracts
& Procurement
RT/K/P/013 Engagement of Management Consultants Issue Date
Status Price Colour Compliance Implementation 1 Jul 97 C
The purpose of this procedure is to support the Corporate
Manual's requirement, by defining the steps that must be followed
by all parties in the various stages of engagement of management
consultants. It also emphasises the Corporate Manual's requirement
to obtain prior approval of the Chairman or Chief Executive for the
engagement of all Management Consultants.
Mandatory upon: Network Rail Standards Ownership: Contracts
& Procurement
-
2. Company Standards B. Contracts & Procurement Supplier
Accreditation
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 18
2B2. Supplier Accreditation
2B2.1. Procedures
RT/LS/P/052 Accreditation and Development of Suppliers Issue
Date Status Compliance Implementation 1 Apr 04
The purpose of this procedure is to mandate the requirements
for: The effective accreditation and development of suppliers
directly engaged by Network Rail The Supplier Accreditation
Department's contribution to the maintenance and development of
an
adequate and continually improving base of service suppliers to
support the delivery of Network Rail's business objectives
The use of pre-contract approval and accreditation information
to ensure that appropriate suppliers are selected to meet Network
Rail contract requirements
Mandatory upon: Network Rail Standards Ownership: Supplier
Accreditation
This Standard is for Network Rail Use Only Not Available outside
the Company
2B2.2. Guidance Notes
RT/LS/G/00014 Contractor Assurance System Issue Date Status
Price Colour Compliance Implementation * 2 (1) Aug 04 (Apr 02)
Up-Issued D 07/08/04 07/08/04
Describes the Contractor Assurance System, i.e. Network Rail s
contract & contractor assurance processes, in order to clarify
the purpose and interdependence of these processes.
Mandatory upon: Advisory only Additional Information: This
Guidance Note replaces RT/LS/C/003 Standards Ownership: Supplier
Accreditation
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 19
2C. Engineering Directorate
2C1. Electrification
2C1.1. Specifications
RT/E/S/20000 Index of Railtrack Documents Relating to Electrical
Distribution & Electro-Mechanical Plant Engineering
Activities
Issue Date Status Price Colour Compliance Implementation 11 Aug
02 D
To specify the application of documents relating to Electrical
Distribution & Electromechanical Plant issued prior to April
1994 and as listed in this Specification.
Mandatory upon: Network Rail & Contractors Standards
Ownership: Electrification & Plant
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
882C1 Insulating Shroud for Foot of Conductor Rail 3 1997
Specification AC2/3 50 HZ, 25 kV Overhead Line Equipment (OHLE) 1
1968 Specification AC 8 Specification for 25 kV Isolators 1 1976
Specification AC 129 Specification for the Installation of
Switching Station Slab Foundation Bases 1983 Specification AC 174
General Specification for Fused Isolators 1984 Specification AC 199
Specification for Silicone Rubber Covered Primary Insulated Poles
1986 Specification AC 239 General Specification for Ancillary
Equipment Enclosures for 25 kV Structure
Mounted Switchgear 1991 Specification
AC/DC 242 General Specification for Installation of Cable
Routes, Cable Laying, Testing and Jointing on Cable Routes forming
part of the Traction Distribution System
1990 Specification
ECP 229 Conductor Running Out Pulley Servicing Requirements 1989
Specification EHQ/SP/C/501 Specification for the Design and
Installation of Negative Bonding and Associated
Equipment on the High Current D.C. Electrified Lines of Network
South East 1 1994 Specification
EHQ/SP/D/007 Specification for Earthing and Bonding at Dolland's
Moor International Freight Yard
2 1992 Specification
EHQ/SP/D/025 General Specification for 25 kV Power Transformers
and Solid State Voltage Regulators for Signalling Supplies -
CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002
apply now
1 1993 Specification
EHQ/SP/D/102 Specification for Earthing and Bonding at North
Pole Depot 1 1991 Specification EHQ/SP/D/134 Procurement
Specification for the Supply, Delivery & Installation of
Outdoor
Ancillary Cubicles for 25 kV Isolation Transformers 1 1992
Specification
EHQ/SP/O/004 Specification for the Supply and Installation of
OHL Equipment for 50Hz A.C. Electrification
1 1991 Specification
EHQ/SP/O/006 Specification for Identification of Bonds on
Electrified Lines Except Southern Divisions of NOS.
2 1993 Specification
EHQ/SP/O/012 Specification for Test of Cross Spanwire Clamps on
19/2.1 Cad Cu Spanwire 1 1991 Specification EHQ/SP/O/026
Specification for Track Datum Markers on all overhead electrified
lines. 1 1990 Specification EHQ/SP/O/049 Protective Coatings of
Structure Bases & Foundation Caps of Overhead Line
Structures - CAUTION: Protective treatments - RT/CE/S/039 &
RT/CE/C/002 apply now
3 1993 Specification
EHQ/SP/O/105 Specification for Concrete for OHLE Structure
Foundations 1 1992 Specification EHQ/SP/S/001 Specification for the
Provision of Isolation, Earthing and Indication Facilities
where Local Isolations are Permitted on AC Electrified Lines 2
1993 Specification
EHQ/SP/S/002 Specification for the screening of signals 2 1991
Specification EHQ/SP/S/004 Specification for the Installation &
Operation of Buffer Sections & Permanently
Earthed Sections in A.C. OHLE 2 1992 Specification
EHQ/SP/S/030 Specification for the Preparation of Isolation
Diagrams and Instructions for AC Electrified Lines.
1 1992 Specification
EHQ/ST/D/615 Standard for Routine Maintenance of Electrical
Protection Systems 1 1994 Specification EHQ/ST/D/622 Standard for
Routine Maintenance of Buildings 1 1994 Specification EHQ/ST/D/629
Standard for Maintenance of Oil Pressure in Oil Filled Cables 2
1994 Specification
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 20
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
EHQ/ST/D/630 Standard for Routine Maintenance of HV Feeders 1
1994 Specification EHQ/ST/D/631 Standard for Maintenance of SCADA
Equipment 1 1994 Specification EHQ/ST/D/632 Standard for Routine
Maintenance of Pilot Cables and Systems 1 1994 Specification
EHQ/ST/O/001 Maintenance of Mark I OHLE 2 1992 Specification
EHQ/ST/O/002 Maintenance of Mark IIIA OHLE 2 1992 Specification
EHQ/ST/O/003 Maintenance of Mark IIIB OHLE 2 1991 Specification
EHQ/ST/O/009 Design of Overhead Line Structures 1 1992
Specification EHQ/ST/S/001 Safety Requirements for Contractors
Undertaking OHLE Contracts 1 1992 Specification EHQ/ST/S/502
Standard for the Emergency Disconnection of Grid Supply Feeders for
DC
Electrification 1 1993 Specification
EHQ/ST/S/505 Standard for the Preparation or Modification of
Comprehensive Track Diagrams for SE, SW & SC Divisions
1 1993 Specification
EHQ/ST/S/506 Standard for Site Safety for Non British Railways
Personnel Working for the Electrification Group
1 1994 Specification
OLEMI Railtrack Index of Accepted Design Drawings. Note: Issue
12 is a two volume publication with a separate revision table that
lists changes that have occurred between June 2000 and June
2002
12 Jun-02 Specification
SN27-93-002 General Specification for 750 V D.C. Track Voltage
Relays Specification SN53-3-24/007/2
General Technical Specification for Paired Core Compound Filled
Supervisory Cables
1987 Specification
EHQ/PR/C/501 Procedure for Application of Short Circuiting
Straps for Conductor Rail Isolation
1 1994 Procedure
EHQ/PR/O/002 Maintenance of Ceramic Bead Neutral Sections 1 1990
Procedure EHQ/PR/O/003 Examination and Maintenance of Steatite and
Porcelain Insulators 1 1990 Procedure EHQ/PR/O/004 Maintenance of
Overhead Line Isolators 2 1992 Procedure EHQ/PR/O/006 Examination
and Adjustment of Balance Weight Termination's of Mark I Design 1
1990 Procedure EHQ/PR/O/008 Fitting and Removal of OHL Connections
To/From High/Low Voltage Terminals
on Transformers 2 1991 Procedure
EHQ/PR/O/011 Use of Ladders on Permaquip High Capacity Trolley
on Overhead Equipment 1 1990 Procedure EHQ/PR/O/012 Jointing of
Universal Columns and Broad Flanged Beams for use as Masts for
OHL Structures - CAUTION: Protective treatments - RT/CE/S/039
& RT/CE/C/002 apply now
2 1992 Procedure
EHQ/PR/O/013 Installation of "Preformed" Dead Ends for AL, AWAC
& CU-PLY Conductors 2 1991 Procedure EHQ/PR/O/014 Installation
of "Preformed" Splices for AL & AWAC Conductors 2 1992
Procedure EHQ/PR/O/016 Use of Permaquip Scissor-Type extending
Platform Machine Used for Overhead
Line Maintenance 2 1993 Procedure
EHQ/PR/O/017 Installation of 'BICC-BURNDY Compression Splices
for AL, AWAC & Copper-Cadmium Conductors
2 1992 Procedure
EHQ/PR/O/019 Installation of Compression Lugs for Aluminium,
Copper and Copper-Ply Conductors
2 1992 Procedure
EHQ/PR/O/020 Application of High Performance Pressure sensitive
Plastic Sheet Film Markers to OHL Equipment
2 1992 Procedure
EHQ/PR/O/024 Use and Care of B.R. Type Overhead Live Line
Testers 2 1992 Procedure EHQ/PR/O/027 Installation of Contact Wire
Splices for Hard-Drawn & Cadmium Copper
Conductors 2 1992 Procedure
EHQ/PR/O/029 Thermit Welding for Traction Bonding 2 1992
Procedure EHQ/PR/O/032 Installation of Standard Type Neutral
Sections 2 1992 Procedure EHQ/PR/O/034 Installation of Brown Boveri
25 kV Section Insulators 2 1992 Procedure EHQ/PR/O/037 Installation
and Maintenance of Pneumatic Tensioning Units in OHLE 2 1992
Procedure EHQ/PR/O/040 Installation of Bolts in Masonry, Brickworks
or Concrete using Polyester Resin
Cartridges 2 1991 Procedure
EHQ/PR/O/042 Installation of Heat Shrink Tubing for Aluminium
Conductors 2 1992 Procedure EHQ/PR/O/045 Touch Up Painting of
Tubular Pile Foundations - CAUTION: Protective
treatments - RT/CE/S/039 & RT/CE/C/002 apply now 2 1992
Procedure
EHQ/PR/O/046 Use of M.E. Mechanical Handling Conductor Drum
Carriers Fitted With Caliper Disc Brakes
2 1992 Procedure
EHQ/PR/O/050 Installation of FARGO Automatic Splices for AWAC
Catenary 2 1992 Procedure
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 21
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
EHQ/PR/O/057 Compression Jointing of End Fittings 2 1992
Procedure EHQ/PR/O/061 Installation of Cone-End fittings for
Termination of Overhead Line Conductors 2 1992 Procedure
EHQ/PR/S/001 Procedure for Inspection of Bonds Attached to
Scaffolding on A.C. Electrified
Lines 1 1990 Procedure
EHQ/PR/S/002 Procedure for the disconnection of "yellow" bonds
or action to be taken when reported broken or disconnected, on AC
electrified Lines
1 1990 Procedure
EHQ/PR/S/003 Procedure for the Isolation of Switching Stations
at Electrical Control Room Boundaries to Comply with Issue of
Permits to Work and Sanctions for Test
2 1991 Procedure
EHQ/PR/S/006 Procedure for the special action required for AC
electrified lines in those joint less track circuits areas listed
in Appendix 1
1 1990 Procedure
EHQ/PR/S/031 Procedure for the Issue, Storage, Routine
Inspection and Testing of Rubber Gloves
2 1991 Procedure
EHQ/PR/S/134 Procedure to be followed when a return Conductor to
Rail Connection or other "Red" Bonds are reported broken or
disconnected
2 1991 Procedure
EHQ/PR/S/602 Procedure for Application of Short Circuiting Bar
in an Emergency 1 1994 Procedure EHQ/ST/S/501 Notification to
Electrical Control Room of Staff Authorised to take Pre-planned
Isolations of the Conductor Rail 2 1993 Procedure
SP-PM-018 Acceptance Of High Mast Winch Mechanisms 2 Mar-92
Procedure SP-PM-027 Design Of Retention Toilet Servicing
Installations 1 Mar-84 Procedure SP-PM-039 Exam Codes Used In
Standard Maintenance Specs. Procedure SP-PM-048 Setting Axle Loads
On 76t. Breakdown Cranes 1 Mar-88 Procedure SP-PM-060 Contract
Statutory Examination Of Pressure Vessels 1 Jun. 1988 Procedure
SP-PM-063 Cleaning Windscreens And Replacement Of Wiper Blades
Under A.C.
Overhead Lines 2 Feb-90 Procedure
SP-PM-066 Operation Of Escalators And Escalator Trolleys 1
Nov-87 Procedure SP-PM-111 Minor Works Contract For Electrical
Cable And Mechanical Installations 1 May-90 Procedure AC 220 Code
of Practice for OLE "As Installed" Data Records 1991 Code of
Practice
CP-PM-001 Lineside Equipment For Use With High Capacity Wagons 6
Nov-89 Code of Practice
CP-PM-011 External Carriage Washing Machines, Guidelines Of
Design With Liquid Concentrates
1 Jun. 1985 Code of Practice
CP-PM-017 Under floor Wheel Lathe, Design Of Facilities 1 Jul.
1987 Code of Practice
CP-PM-018 Electricity Supplies To Computers 1 Oct-89 Code of
Practice
CP-PM-019 Design, Specification And Maintenance Of Hydraulic
Systems 4 Aug-92 Code of Practice
CP-PM-023 Depot Protection Equipment List 4 Aug-92 Code of
Practice
CP-PM-033 Electric Cable Installation Associated With P&M In
Br Underground Locations 2 Feb-90 Code of Practice
CP-PM-045 Electrical Installations On Rail Premises 1 Jun-93
Code of Practice
CP-PM-046 Winches 1 Feb-92 Code of Practice
ECP 34 Wind Loading on OHLE and Structures 3 1980 Code of
Practice
ECP 44 Passage of High /Long loads over level crossings (BR
12009) 1 1977 Code of Practice
ECP 227 Code of Practice for Winching Overhead Line Conductors
1989 Code of Practice
ECP 166 Code of Practice for Location and Design of Designated
Earth Points (D.E.P.S.) for Overhead Line Equipment
1985 Code of Practice
ECP 236 Code of Practice for Protection Settings and Methods of
Calculation for 25 kV Electrified Lines
Code of Practice
EHQ/CP/P/039 Code of Practice for the Allocation of Designations
for Switching Stations, Auxiliary Supply Points, Electrical
Sections, Overhead Line Switches, Circuit Breakers and the Like,
for AC Electrified Lines
5 1993 Code of Practice
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 22
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
EHQ/CP/P/209 Code of Practice for the Preparation of Section
Diagrams for AC Electrified Lines
2 1993 Code of Practice
EHQ/CP/S/136 Code of Practice for the Application and Removal of
Local Earth's and Temporary Continuity Jumpers for A.C. Electrified
Lines
3 1991 Code of Practice
EHQ/ST/C/502 Reporting and Investigation into the Cause of
Displaced Conductor Rails 1 1993 Code of Practice
EHQ/ST/C/612 Standard for the Maintenance of Positive Conductor
Rail 1 1994 Code of Practice
EHQ/ST/D/645 Code of Practice for Access to Trackside
Supervisory Equipment 1 1995 Code of Practice
TPS/MC/401 Planning, Installation & Maintenance of Cable
Routes & Other Works in Cess 1 1987 Code of Practice
BR 29740 DC Electrified Lines Working Instructions (Merseyrail
Only) Instructions BR 29987/9 DC Electrified Lines Working
Instructions (Drayton Park - Moorgate Only) Instructions
EHQ/IN/D/001 Instruction for the Inspection of 25 kV A.C. Feeder
Station Buildings and Other
Track Sectioning Cabins/ Enclosures 2 1992 Instructions
EHQ/IN/D/003 Instruction for Documents to be kept in Switching
Station Buildings 1 1990 Instructions EHQ/IN/D/008 Instruction for
Routine Testing and Maintenance of Transformer and Switchgear
Oil 1 1993 Instructions
EHQ/IN/D/009 Instruction for the Inspection and Maintenance of
25 kV Cables and Cable Routes
1 1993 Instructions
EHQ/IN/D/010 Instruction for the Routine Inspection and
Secondary Injection of F.G.L. Instantaneous Attracted Armature
Relays
1 1993 Instructions
EHQ/IN/D/011 Instruction for Method of Applying Zone Reach and
Timer Settings to DZA and AKE Protection Relays Using BR DZ Test
Set
1 1993 Instructions
EHQ/IN/D/012 Instruction for Routine Inspection and Secondary
Injection Testing of DZA & XFE Protection Relays
2 1993 Instructions
EHQ/IN/D/013 Instruction for Routine Inspection and Secondary
Injection Testing of T.F.H. Protection Relays
1 1993 Instructions
EHQ/IN/D/014 Instruction for Routine Inspection and Secondary
Injection Testing of CAG 19 Instantaneous Overcurrent and Earth
Fault Relays
1 1993 Instructions
EHQ/IN/D/016 Instruction for Routine Inspection and Secondary
Injection Testing of YTG 14 Distance Protection Relays
1 1993 Instructions
EHQ/IN/D/019 Instruction for Routine Inspection and Secondary
Injection Testing of CDG and HO4 Protection Relays
1 1993 Instructions
EHQ/IN/D/021 Instruction for Vacuum Interrupter Pressure Testing
on 25 kV VCB Equipment (GEC Type XE2, X82S and SWS Type 82XEM)
1 1993 Instructions
EHQ/IN/D/030 Inspection and Maintenance of Enclosed Transformer
Return Current Isolating Switches
1 1993 Instructions
EHQ/IN/D/100 Instruction for Maintenance of 25 kV A.C.
Switchgear Type K11 on 25 kV A.C. Electrified Lines
1 1990 Instructions
EHQ/IN/D/101 Instruction for the Inspection & Maintenance of
South Wales Switchgear Type RD 100 Double Pole Disconnector
1 1992 Instructions
EHQ/IN/D/102 Instruction for Maintenance of 25 kV GEC Type OX
SF6 Insulated Vacuum Switchgear Incorporating Sequential Isolators
and Associated Equipment
1 1990 Instructions
EHQ/IN/D/104 Instruction for the Routine Maintenance of 25 kV
Vacuum Circuit Breakers: GEC Type XE2, X82S, South Wales Switchgear
Type 82XEM and Other equipment Within the HV Chamber
1 1990 Instructions
EHQ/IN/D/106 Instruction for the Maintenance of ASEA Minimum Oil
Circuit Breakers Type HKSJ 600Amp & HKSJB 800Amp Including
Associated Busbar and Breaker Circuit Chambers
1 1993 Instructions
EHQ/IN/D/108 Instruction for the Maintenance of 25 kV GEC Type
OX36 Vacuum Switchgear (Structure Mounted Outdoor Switchgear)
2 1993 Instructions
EHQ/IN/D/109 Instruction for the Routine Maintenance of ABB Sace
Esaflour SFE 25 Structure Mounted Outdoor Switchgear
3 1993 Instructions
EHQ/IN/D/200 Instructions for Maintenance of Oil Filled
Transformers Except Booster Transformers
2 1990 Instructions
EHQ/IN/D/201 Instruction for Maintenance of Free Breathing and
Sealed Booster Transformers 3 1991 Instructions EHQ/IN/D/302
Instruction for Stationary Batteries Nickel Cadmium Type and
Associated
Charger and Changeover Relay-West Coast 25 kV Electrified Line
Only 1 1990 Instructions
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 23
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
EHQ/IN/D/402 Instructions for Maintenance of All Voltage
Regulators and Regulating Transformers
1 1990 Instructions
EHQ/IN/D/405 Instructions for Single to Three Phase Converter
Installations 1 1990 Instructions EHQ/IN/D/406 Instruction for
Routine Inspection and Maintenance of Diesel and Electrically
Driven Compressed Air Installations 1 1991 Instructions
EHQ/IN/D/409 Instruction for Maintenance of MVAC Distribution
Boards 1 1990 Instructions EHQ/IN/D/413 Instruction for Maintenance
of Motor Wound Spring Mechanism on OHL
switches Manufactured by Morris Line Equipment 1 1990
Instructions
EHQ/IN/D/414 Instruction for Installation modification of
Interconnecting Wiring 2 1992 Instructions EHQ/IN/D/415 Instruction
for the Inspection and Examination of Harmonic Filter Equipment 1
1993 Instructions EHQ/IN/D/616 Instruction for Electrical Testing
of Glass Fibre Height & Stagger Gauge 1 1991 Instructions
EHQ/IN/D/617 Instruction for Electrical Testing of Glass Fibre
Hollow Section Height Stick and
Glass Fibre System Height Pole used on Live Overhead Equipment 1
1991 Instructions
EHQ/IN/D/618 Instruction for the Examination and Testing of a
Primary Insulator Pole which may Contact Live Overhead Line
Equipment
2 1992 Instructions
EHQ/IN/D/622 Instructions for Checking Operation and General
care of 25 kV L.M.R. Design Live Line Tester (Meter Type)
1 1991 Instructions
EHQ/IN/O/003 Instruction for the Preparation, Care and
Maintenance of Local Earths 2 1992 Instructions EHQ/IN/O/005
Instruction for the Maintenance of BICC Single Wire Porcelain
Section
Insulators 1 1990 Instructions
EHQ/IN/O/006 Instruction for the Layout of Overhead Line
Equipment. 1 1992 Instructions EHQ/IN/O/012 Instruction for the
Retensioning of Fixed Termination OLE 1 1990 Instructions
EHQ/IN/O/030 Inspection of OHL Structures and Foundations 2 1992
Instructions EHQ/IN/O/031 Installation of 'CCL-Reliable' Automatic
Connectors for HD copper, Copper-
Cadmium & AWAC Catenary 2 1991 Instructions
EHQ/IN/O/035 Protective Greasing of OLE Assemblies &
Components 2 1991 Instructions EHQ/IN/O/036 Installation of
BICC-BURNDY Compression Connections in Overhead Line
Equipment 2 1992 Instructions
EHQ/IN/O/037 Instruction for the Installation of Overhead Line
Equipment, Planted and Bolted Base Side Bearing Foundations
1 1992 Instructions
EHQ/IN/O/042 Instruction for the Attachment of Spanwire to Tube
Clamps 1 1993 Instructions EHQ/IN/O/056 Installation of Skidless
Neutral Sections 2 1992 Instructions EHQ/IN/P/002 Instruction for
the Production of Mean and Peak Currents for 25 kV
Electrification 1 1992 Instructions
EHQ/IN/P/004 Control of Major feeding Diagrams 1 1993
Instructions EHQ/IN/S/001 Instructions for Isolation and Earthing
of 25 kV A.C. Switchgear Manufactured
by Messrs. Switchgear and Cowans type K11 and Cable Connections
2 1993 Instructions
EHQ/IN/S/002 Isolation & Earthing at Hackney Downs No. 2 TSC
1 1990 Instructions EHQ/IN/S/003 Isolation & Earthing 25 kV
Switching Stations Incorporating VCB's 2 1992 Instructions
EHQ/IN/S/007 Instructions for Isolation and Earthing for Feeder
Switch Maintenance for A.C.
Electrified Lines 1 1990 Instructions
EHQ/IN/S/008 Instructions for the Installation and Removal of
Traction Bonding on all Electrified Lines
1 1990 Instructions
EHQ/IN/S/011 Instructions for Isolating and Earthing Structure
Mounted Outdoor Switchgear (SMOS) Locations (where the working
Instructions for A.C. Electrified Lines BR 29987 apply)
4 1992 Instructions
EHQ/IN/S/012 Instructions for Isolation and Earthing at 25 kV
A.C. Feeder Stations with Harmonic Filters and Vacuum Circuit
Breakers
4 1993 Instructions
EHQ/IN/S/014 Isolation & Earthing at York Way TSC 1 1991
Instructions EHQ/IN/S/015 Isolation & Earthing at Incline TSC 2
1992 Instructions EHQ/IN/S/027 Isolation & Earthing for
Isolating Transformers at Dolland's Moor 1 1993 Instructions
EHQ/IN/S/035 Instruction for the Use of Ladders & Other
Equipment on OHLE 1 1992 Instructions EHQ/IN/S/036 Instructions for
Isolation & Earthing of SMOS Location not Adjacent to
Overhead Line equipment, using BR 12011 3 1993 Instructions
EHQ/IN/S/037 Isolation & Earthing for Isolating
Transformers, Associated Cables & equipment at W. London J.,
Mitre Bridge and Scrubbs Lane
1 1993 Instructions
EHQ/IN/S/038 Isolation & Earthing for Old Oak Common
Isolation Transformers 3 1993 Instructions
-
2. Company Standards C. Engineering Electrification
Issue 46: 7th August 1st October 2004 Catalogue of Company
Standards Page 24
Document No Title Issue Date Status
Des
ign
Inst
alla
tio
n
Mai
nten
ance
Ope
rati
ons
EHQ/IN/S/039 Instruction for the Urgent Communication of
Information of a Serious Safety or Technical Nature Concerning
Electrification Fixed Equipment Except the SC, SE & SW
Divisions of Network SouthEast
1 1993 Instructions
EHQ/IN/S/040 Safety of Staff Using the Roof of Wiring Trains 1
1993 Instructions EHQ/IN/S/212 Instructions for the carrying out of
Testing on all Electrified Lines. 2 1991 Instructions EHQ/IN/S/801
Arrangements for Isolation of the Conductor Rail for Pre-planned
Possessions
of the Line 3 1995 Instructions
EHQ/ST/D/502 Standard for Replacement to be Used on
Electrification Equipment 1 1993 Instructions OM.1 Inspection And
Cleaning Of Propane Gas Storage Tanks 2 Jun-79 Instructions OM.2
Calibration & Associated Test Of S.L.I.S On Cranes 3 Oct-84
Instructions OM.3 Maintenance In Safe Order, S.L.I.S On Cranes 3
Apr-84 Instructions OM.52 Inspection Of Spring Hanger Bolts
(Cranes) 3 Jul-81 Instructions OM.53 Safety Of The Line Brake Test
& Special Post Derailment 1 Aug-82 Instructions OM.58 Rail
Crane Air Brake System: Exam Of Air Receivers 2 Sep-83 Instructions
PMTK 0028 Plant Maintenance Technical Kit For Domestic Equipment
May-90 Instructions PMTK 0041 Plant Maintenance Technical Kit For
76t. Converted Breakdown Cranes Jul-90 Instructions PMTK 0042 Plant
Maintenance Technical Kit F