February 2013Month:Februarie / FebruaryContract Number:
Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's
Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY
TIME SHEETDayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulFr1Sa2Su3Mo41Tu519.0018.3015,30-17,008.00Acknowledge
the Contract 5R2We619.0018.3015,30-17,008.00Acknowledge the
Contract, BoQ, Price
descriptionTh719.0018.3015,30-17,008.00Analisis of the first 15teen
most important itemsFr819.0018.3015,30-17,008.00Acknowlegde the
Technical DesignSa9Su10Mo1119.0018.3015,30-17,008.00GI - Overview,
LOT 6 - centralizare articole
(oscar)Tu1219.0018.3015,30-17,008.00LOT 6 - centralizare articole
(oscar)We1319.0018.3015,30-17,008.00LOT 6 - centralizare articole
(oscar)Th1419.0018.3015,30-17,008.00LOT 6 - centralizare articole
(oscar)Fr1519.0018.3015,30-17,008.00LOT 6 - centralizare articole
(oscar)Sa16Su17Mo1819.0018.3015,30-17,008.00LOT 6 - centralizare
articole (oscar)Tu1919.0018.3015,30-17,008.00LOT 6 - centralizare
articole (oscar)We2019.0018.3015,30-17,008.00LOT 6 - centralizare
articole (oscar)Th2119.0018.3015,30-17,008.00LOT 6 - centralizare
articole (oscar)Fr2219.0018.3015,30-17,008.00LOT 6 - centralizare
articole (oscar)Sa23Su24Mo2519.0018.3015,30-17,008.005R3 -
pregatire IPS 03 / PV predare echipamente IT / Pregatire foi
evident GI/ Pregatire foi evidenta Bill
2Tu2619.0018.3015,30-17,008.00IPS 03 - Pregatire foi evidenta Bill
3We2719.0018.3015,30-17,008.00IPS 03 - Pregatire foi evidenta Bill
4, IPS 03, Th2819.0018.3015,30-17,008.00IPS 03, LOT 6 - Documente
Suport VO-uri (oscar)TOTAL18144.00Summary of Days Worked To
DateContractTOTALPreviousMonthThis MonthCumulated01818
Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve
Martin
Date:Date:Date:2/28/122/28/122/28/12
March 2013Month:Martie / MarchContract Number: Year:2013Name of
Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin
- FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays
WorkedHourWork
DescriptionOBS.ArrDepBreakCumulFr119.0018.3015,30-17,008.00Planning
future activities / Cost analisys - Retaing Walls, Slope
Reinforcements / LOT 6 - additions on claim items
(OSCAR)Sa2Su3Mo419.0018.3015,30-17,008.00Start Working On
Breakdowns - Planning / LOT 6 - additions on claim items
(OSCAR)Tu519.0018.3015,30-17,008.00Working On Breakdowns - Planning
(Microsoft Project) / Building the format for breakdowns / Internal
Weekly Meeting / Building the pursuance sheets for 5R3
itemsWe619.0018.3015,30-17,008.00Breakdowns CO 01f (Retaing wall) -
base for discution / Breakdown Concrete - discution Base / Building
the pursuance sheets for 5R3 items / LOT 6 - additions on claim
items (OSCAR)Th719.0018.3015,30-17,008.00IPS
03Fr819.0018.3014,00-15,008.00IPS 03 / Letter to Engineer (IPS
02)Sa9Su10Mo1119.0018.3014,00-15,008.00Breakdowns CO 04 - case
studyTu1219.0018.3014,00-15,008.00Breakdowns CO
04We1319.0018.3014,00-15,008.00IPS
03Th1419.0018.3014,00-15,008.00IPS 03 / Preparing List of Reports
that was to be performed by the Contractor for 5R3 (along with ms.
Guran)Fr1519.0018.3014,00-15,008.00IPS 03
/Sa16Su17Mo1819.0018.3014,00-15,008.00IPS
03Tu1919.0018.3014,00-15,008.00IPS
03We2019.0018.3014,00-15,008.00IPS 03 - sent to
engineerTh2119.0018.3014,00-15,008.00ITEM LIST PREPARATION -
bridgesFr2219.0018.3014,00-15,008.00ITEM LIST PREPARATION -
bridgesSa23Su24Mo2519.0018.3014,00-15,008.00ITEM LIST PREPARATION -
bridgesTu2619.0018.3014,00-15,008.00ITEM LIST PREPARATION -
bridgesWe2719.0018.3014,00-15,008.00MONTHLY MEETING / ITEM LIST
PREPARATION - bridgesTh2819.0018.3014,00-15,008.00DAILY JOURNAL /
MONTHLY REPORT OF PERSONEL AND MACHINES
Fr2919.0018.3014,00-15,008.00IPS 04 - UPDATE GI / UPDATE LIST OF
CORESPONDENCE OF CLAIMS / IPS 04Sa30Su31TOTAL21168.00Summary of
Days Worked To DateContractTOTALPreviousMonthThis
MonthCumul182139Employee's SignatureProject ManagerCrlig
C-tinAntonio Jose Seve Martin
Date:3/29/13ore lucrate168Verificare 00.00zero e bineRata /
or10Curs 28 feb4.4032Val (Lei)7,397.38
April 2013Month:Aprilie / AprilContract Number: Year:2013Name of
Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin
- FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays
WorkedHourWork
DescriptionOBS.ArrDepBreakCumulSaSuMo119.0018.3015,30-17,008.00IPS
04 - UPDATE LIST OF
CORESPONDENCETu219.0018.3015,30-17,008.00Checking daily journal /
MeetingWe319.0018.3015,30-17,008.00View over technical Drawings
/Th419.0018.3015,30-17,008.00View over technical Drawings
/Fr519.0018.3014,00-15,008.00Monthly Report -
Sa6Su7Mo819.0018.3014,00-15,008.00IPS
04Tu919.0018.3014,00-15,008.00IPS
04We1019.0018.3014,00-15,008.00IPS
04Th1119.0018.3014,00-15,008.00IPS 04 / FOTO REPORT 1 - APRIL /
Identification of existing
BillboardsFr1219.0018.3014,00-15,008.00IPS 04 - IPS 03
JoitSa13Su14Mo1519.0018.3014,00-15,008.00IPS 04 / UPDATE LIST OF
CORESPONDENCETu1619.0018.3014,00-15,008.00IPS 04 / ELECTRICAL
RELOCATION CEZ ANALYSISWe1719.0018.3014,00-15,008.00PRINT, LETTER,
BOUND - IPS 04, BREAKDOWN CO 04,Th1819.0018.3014,00-15,008.00
BREAKDOWN CO 04, CO 13aFr1919.0018.3014,00-15,008.00 BREAKDOWN CO
13aSa20Su21Mo2219.0018.3014,00-15,008.00 BREAKDOWN CO 13a, Culvert
94+698Tu2319.0018.3014,00-15,008.00 BREAKDOWN CO 04, CO 13a, CO
13b, IPC 18 - Caransebe BypassWe2419.0018.3014,00-15,008.00IPC 18 -
Caransebe BypassTh2519.0018.3014,00-15,008.00TIMIOARA - DRDP IPC 18
for ApprovalFr2619.0018.3014,00-15,008.00VO 11 - LOT 6 Caransebe
Bypass - List of Overpass Quantites / Starting to gather supporting
documentsSa27Su28Mo2919.0018.3014,00-15,008.00VO 11 - LOT 6
Caransebe Bypass - Supporting
documentsTu3019.0018.3014,00-15,008.00VO 11 - LOT 6 Caransebe
Bypass - Supporting documentsTOTAL22176.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul392261Employee's
SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin
Date:5/2/13ore lucrate176Verificare 00.00zero e bineRata /
or10Curs 30 apr4.3237Val (Lei)7,609.71
May 2013Month:Mai / MayContract Number: Year:2013Name of
Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin
- FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays
WorkedHourWork
DescriptionOBS.ArrDepBreakCumulWe118.0017.3014,00-15,004.00VO 11 -
LOT 6 Caransebe Bypass - Supporting
documentsTh219.0018.3015,30-17,008.00VO 11 - LOT 6 Caransebe Bypass
- Supporting documentsFr319.0018.3014,00-15,008.00VO 12 - LOT 6
Caransebe Bypass - Supporting
documentsSa4Su5Mo6EASTERTu719.0018.3014,00-15,008.00VO 12, VO 13 -
LOT 6 Caransebe Bypass - Summary
TextWe819.0018.3014,00-15,008.00Find, read, study OG 43/1997, HG
84/02.02.2011 - on Caransebe Bypass - Issue
Th919.0018.3014,00-15,008.00Meeting at UM 01440 - Caransebes,
LOT6Fr1019.0018.3014,00-15,008.00VO 12, VO 13 - LOT 6 Caransebe
Bypass - Summary TextSa11Su12Mo1319.0018.3014,00-15,008.00VO 12, VO
13 - LOT 6 Caransebe Bypass - Final checkings, Scan, Print, Bound,
Copy, Letters / IPC 19 - LOT 6Tu1419.0018.3014,00-15,008.00VO 10 -
preparation, sent to G. Rice / IPC 18 - preparation an electronical
copy for Mr. Borlovan, sent / IPC 19 - LOT
6We1519.0018.3014,00-15,008.00Preparing IPC 19 - LOT
6Th1619.0018.3014,00-15,008.00Preparing IPC 19 - LOT
6Fr1719.0018.3014,00-15,008.00Preparing IPC 19 - LOT
6Sa18Su19Mo2019.0018.3014,00-15,008.00Preparing IPS 05 -
5R3Tu2119.0018.3014,00-15,008.00Preparing IPS 05 -
5R3We2219.0018.3014,00-15,008.00Preparing to send IPS 05 - 5R3/
Breakdown GI 01 - 5R3 / LOT 6 - IPC 19 -
EscalationTh2319.0018.3014,00-15,008.00Caransebes - Meeting LOT
6Fr2419.0018.3014,00-15,008.00Draft letter VO10 (for David Saiz) /
Scanat VO11 - documente justificative / Telefon DRDP Timisoare GI11
si GI12 / Recomandation Letter COPISA CONSTRUCTII SA - Draft /
Scrisoare - Neconformitati LOT 6 -
BorlovanSa25Su26Mo2719.0018.3014,00-15,008.00Recomandation Letter
Copisa Constructii / Draft Letter to DRDP Timisoara - Maintenance
5r3 / IPS 06 - 5r3 Tu2819.0018.3014,00-15,008.00IPC 02 -
5r3We2919.0018.3014,00-15,008.00IPC 02 - 5r3 - finalised to be
sendTh3019.0018.3014,00-15,008.00IPS 06 - 5r3 - prepared and ready
to sendFr3119.0018.3014,00-15,008.00IPC 02 - version 2 -
preparation and ready to send.TOTAL22172.00Summary of Days Worked
To DateContractTOTALPreviousThis MonthCumul612283Employee's
SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin
Date:5/31/13ore lucrate172Verificare 00.00zero e bineRata /
or10Curs 30 mai4.3320Val (Lei)7,451.04
Iunie 2013Month:Iunie / JuneContract Number: Year:2013Name of
Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin
- FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays
WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00MEETING
5R3 in TG JIU/ IPC 19 - LOT 6 with DRDR
TimisoaraTu419.0018.3014,00-15,008.00IPC 19 - LOT 6 with DRDR
TimisoaraWe519.0018.3014,00-15,008.00IPC 19 - LOT 6 with DRDR
TimisoaraTh619.0018.3014,00-15,008.00Summary LOT 6 - issues to be
clariffied / Send recomandation to G. Rice / Send Vo 12 and Vo 13
to G. Rice / Resend IPC 2 - 5r3 to Hugh MM, Hyder's RE and QS /
Papers for bridges payed on LOT 6 (expasion
joints)Fr719.0018.3014,00-15,008.00VO 11 -
clarificationsSa8Su9Mo1019.0018.3014,00-15,008.00Make a copy of IPS
19 - LOT 6 for CNADNR.Tu1119.0018.3014,00-15,008.00Site visit with
Owner of the Electrical Cables for
identificationWe1219.0018.3014,00-15,008.00Craiova - for IPC
02Th1319.0018.3014,00-15,008.00IPS 06 - supplementary docs ,
revision according with the yesterday meeting, also IPC 02 - 5r3
,Fr1419.0018.3014,00-15,008.00VO 12 AND VO 13,
BREAKDOWNSSa15Su16Mo1719.0018.3014,00-15,008.00Went to Caransebes,
meeting with mr Orbulesc to prepare the tomorrow
meetingTu1819.0018.3014,00-15,008.00Went to Caransebes, meeting
with mr Borlovan, clariffing parapets, carriage gutter, cleaning
river bed, coating slopes on water course
regularizationWe1919.0018.3014,00-15,008.00Monthly meeting - TG
Jiu, meeting with Hyder's QSTh2019.0018.3014,00-15,008.00Processing
data from Monday and Thusday -
caransebesFr2119.0018.3014,00-15,008.00Breakdowns -
culvertsSa22Su23Mo2419.0018.3014,00-15,008.00Finalised VO 12 -
support papers, copies, calculation roundabouts
lightiningTu2519.0018.3014,00-15,008.00VO 12 - left from
yesterdayWe2619.0018.3014,00-15,008.00Breakdowns / Meeting with Mr.
Diaconu at LainiciTh2719.0018.3014,00-15,008.00Tg Jiu - Finalising
IPC 02 with QS Hyder and RE Hyder
Fr2819.0018.3014,00-15,008.00Preparing IPC 02 to be sent (scanner,
copies, packaging) / Start to print support documents for VO 11 -
copy 2 and copy 3 Sa29Su30TOTAL20160.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul8320103Employee's
SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin
Date:7/2/13ore lucrate160Verificare 00.00zero e bineRata /
or10Curs 01 iulie4.4501Val (Lei)7,120.167120.1683
Iulie 2013Month:Iulie / JulyContract Number: Year:2013Name of
Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin
- FlorinTitle:QUANTITY SURVEYOR (5R3)
MONTHLY TIME SHEETIulie / Julio / July 2013
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo119.0018.3014,00-15,008.00Preparing
IPC 02 to be sent (scanner, copies, packaging) / Start to print
support documents for VO 11 - copy 2 and copy 3
Tu219.0018.3014,00-15,008.00VO 12 AND 13 - PREPARATION TO BE SENT
ON COPISA's office Bucharest / Prepare cover sheet for VO 11 items
/We319.0018.3014,00-15,008.00IPS 07 / VO 12 and VO 13 - talk with G
.Rice / VO 11 - cover sheets for VO
11Th419.0018.3014,00-15,008.00Writing VO 11 / daily mesurements for
5R3 - culverts / removal existing pavement / demolition of existing
concrete guard rails / demolition of existing retainig wall
Fr519.0018.3014,00-15,008.00VO 11 / 5R3 - daily
mesurementsSa6Su7Mo819.0020.3014,00-15,008.00IPC 18 / IPC 19
CLARIFICATIONS FOR MARIUS PIRNUTA / SEND IPC 02 - 5R3 at
CNADNRTu919.0018.3014,00-15,008.00VO 12 AND 13 - clarification woth
Marius Pirnuta / 5r3 - daily
mesurementsWe1019.0018.3014,00-15,008.00Send VO 11 cover sheets at
DRDP Timisoara for Signature and Revision (if the
case)Th1119.0020.3014,00-15,008.00Bound VO 11, copies, prepare to
be send on Bucharest / Daily mesurements for
5r3Fr1219.0018.3014,00-15,008.00VO 11 sent on Bucharest /
Clarification on VO 11, 12 and 13 with Mirela Tanase / Covering
letters for VO 11, 12 and 13Sa1310.3015.305Daily Mesurements
5r3Su14Mo1519.0020.3014,00-15,008.00Follow the Vo 11, 12 and 13 -
talk with Marius Pirnuta, Mirela Tanase, Dragos Enasescu, mr.
Borlovan / Daily Mesurements for
5r3Tu1619.0020.3014,00-15,008.00Follow the Vo 11, 12 and 13 - talk
with Marius Pirnuta and Mirela Tanase / Daily mesurements on 5r3 /
Prepare supporting documents for GI 01 / Breakdown GI
01We1719.0019.3014,00-15,008.00Went to sign PV for GI 11 june 2013
Livezeni and Meri Districts / Daily evidence af works 5R3 -
Culverts / Forwarding letters GI 11 and GI 01 / Start working on VO
14 - Royalty Mining - priority
Zero.Th1819.0018.3014,00-15,008.00Finalising BD for GI 01 / Working
on VO 14 - Royalty Mining - written
sectionFr1919.0018.3014,00-15,008.00Working on VO 14 - Royalty
Mining - tables finishedSa2010.0014.004Daily Mesurements
5r3Su21Mo2219.0018.3014,00-15,008.00Working on VO 14 - Find
supporting documents, put them togethr, copy, forder them - prepare
to be sent to COPISA Bucharest / Daily mesurements on Culverts
5R3Tu2319.0018.3014,00-15,008.00VO 14 - copy, forder them - prepare
to be sent to COPISA Bucharest / Daily mesurements on Culverts
5R3We2419.0018.3014,00-15,008.00Went to Bucharest with IPC 01 - 5R3
/ Change table for VO14Th2519.0018.3014,00-15,008.00IPC 19 - add
VO14 and finalising guard railsFr2619.0018.3014,00-15,008.005R3 -
DAILY MESUREMENTSSa27Su28Mo2919.0018.3014,00-15,008.005R3 - DAILY
MESUREMENTSTu3019.0018.3014,00-15,008.005R3 - DAILY
MESUREMENTSWe3119.0018.3014,00-15,008.005R3 - DAILY
MESUREMENTSTOTAL23193.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul10323126Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:7/25/13ore lucrate193
MyPc: MyPc:am pus 5 ore in plus / 50 euro pentur orele de romana
ale lui Antonio Rondasi inca 4 ore/40 euro pentru Antonio
SeveVerificare 00.00zero e bineRata / or10Curs 30 apr4.4040Val
(Lei)8,499.72
August 2013Month:August / August 2013Contract Number:
Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's
Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)
MONTHLY TIME SHEETAugust / Agosto / August 2013
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulTh119.0018.3014,00-15,008.00Daily
measurement 5r3 / Materials on
siteFr219.0018.3014,00-15,008.00Construction book - LOT 6 / IPS 07
- EstimationSa3Su4Mo519.0020.3014,00-15,008.00Construction book -
LOT 6 / IPS 07 - Daily measurements -
culvertsTu619.0018.3014,00-15,008.00Construction book - LOT 6 / IPS
07 - Daily measurements - demolition of existing retaing walls and
existing guard-railsWe719.0018.3014,00-15,008.00Construction book -
LOT 6 / IPS 07 - Daily measurements - removal of the existing
pavementTh819.0020.3014,00-15,008.00Construction book - LOT 6 / IPS
07 - Daily measurements - explozionFr919.0018.3014,00-15,008.00Deva
- With Juan Obradors / IPS 07 - Advance Payment - First Instalment
- the above IPS 07 will become IPS
08Sa10Su11Mo1219.0020.3014,00-15,008.00IPS 07 - Advance Payment -
1st instalment - arrangement to be sent / Gault Rice returnal to
Romania - arange for VO 14 to be signed / IPS 08 - daily
mesurementsTu1319.0020.3014,00-15,008.00IPS 08 - daily measurements
E08-1/E08-3 - Prepare draft letters for ... Asking payment for IPC
01We1419.0019.3014,00-15,008.00VO 11 - sent editable format to M.
Pirnuta / Site visitTh1519.0018.3014,00-15,008.00Daily measurement
5r3 / Materials on site / Culverts / Reading claim letters from
Clive HorridgeFr1619.0018.3014,00-15,008.00Report to David - IPC
19, VO11, VO12, VO13, VO14 / Daily measurements - preparing table
for works on 5R3Sa17Su18Mo1919.0018.3014,00-15,008.00G. Rice - VO14
- Telephone/Push for VO14 (until the end of the week will have an
answer) / Ask M. Pirnuta about - VO11, VO12,
VO13Tu2019.0018.3014,00-15,008.00Answer M- Pirnuta's e-mail with
clarifications regardind VO11We2119.0018.3014,00-15,008.00Draft
letter - IPC 19 COPISA - CNADNR and DRDP
Timisoara29-Jul28Th2219.0018.3014,00-15,008.00IPs
0826-AugFr2319.0018.3014,00-15,008.00BD GI 01 - Arsin / Culverts
table evidence of Justification and Comparation with Fisical Status
/ Ips 08 / VO 11 - H018 - clarifications for
CNADNRSa24Su25Mo2619.0018.3014,00-15,008.00IPS 08 - daily
measurements - culverts / Materials on
siteTu2719.0018.3014,00-15,008.00IPS 08 - daily measurements -
culverts / Materials on site / Cutting trees / LOT 6 - VO 12 / VO
13We2817.3011.304.00IPC 08 - daily measurement - culverts /
MaterialsTh29115.3019.304.00IPC 08 - daily measurement - culverts /
MaterialsFr3019.0018.3014,00-15,008.00VO 12 - VO 13 - VO 14 -
clarificationsTOTAL22168.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul12622148Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:8/29/13ore lucrate168Verificare 00.00zero e bineRata /
or10Curs 29 aug4.4466Val (Lei)7,470.29
Septembrie 2013Month/Mes:September / Septiembre / SeptembrieName
of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALSeptember /
Septiembre / Septembrie
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.00IPS 08 -
Daily Program - Monthly ReportTu319.0018.3014,00-15,008.00IPS 08 -
Materials on site - Daily Program - Monthly Report - Explosion
110+930 - Answer to G. Rice regarding
VO14We419.0018.3014,00-15,008.00Daily measurements - curverts -
Clarifications VO14 - Daily Program - Monthly
ReportTh519.0018.3014,00-15,008.00IPS 08 - Daily measurements -
materials - Clarifications VO14 - Daily Program - Monthly
ReportFr619.0018.3014,00-15,008.00IPS 08 - Daily measurements -
Clarifications VO14 - Daily Program - Sent - Monthly Report -
august 2013 - Sent IPS 08Sa7Su8Mo919.0018.3014,00-15,008.00LOT 6 -
Earth Filling - Materials Tests - Daily Activity Program - Daily
JournalTu1019.0018.3014,00-15,008.00VO 14 - clarifications / IPS 08
- more attachments - Daily Activity
ProgramWe1119.0018.3014,00-15,008.00Targu Jiu - IPS 08 - Daily
Activity ProgramTh1219.0018.3014,00-15,008.00Update Culverts -
Prepare IPS 09 - Advance Payment - Daily Activity
ProgramFr1319.0018.3014,00-15,008.00VO 14 - draft letter from G.
Rice - Analisys / IPS 08 - more attachments / Daily Activity
Program / Daily JournalSa1419.0018.3014.00-15.008.00VO 14 -
preparing clarifications for VO 14 - tables of excavations /
summary of bad quality of earth excavated on LOT
6Su15Mo1619.0018.3014,00-15,008.00IPS 08 - clarificari / Daily
Activity ProgramTu1719.0018.3014,00-15,008.00VO 12 - clarifications
/ Update Culverts / Daily Activity Program / Daily
JournalWe1819.0018.3014,00-15,008.00VO 12 and VO 13 clarifications
/ Update Culverts / Daily Activity Program / Daily Journal / IPS 08
- print support documents culvertsTh1919.0018.3014,00-15,008.00VO
12 and VO 13 clarifications - counting verical signals and
clarifying horisontal marking an Marius Pirnuta comments / Update
Culverts / Daily Activity Program / Daily Journal
Fr2019.0018.3014,00-15,008.00At Trgu Jiu at Engineer's QS for IPS
08Sa2119.0018.3014.00 - 15.008.00Final clarifications and
preparations for Monday IPC 19 - LOT
6Su22Mo2319.0018.3014,00-15,008.00At Timisoara with IPC 19 - Daily
Activity ProgramTu2419.0018.3014,00-15,008.00LOT 6 - IPC 19
updating final clarifications from yesterday / DN 66 - Daily
Activity ProgramWe2519.0018.3014,00-15,008.00Breakdown C02-2 /
C02-2' / Demolition / Excavation / Formworks / Concrete C8/10,
C12/15 / Placing Precasted tipe P2 / Mortar M100 / Waterproof -
Orisontal and Vertical / Drain / - Daily Activity Program / Daily
Site Journal / Support Documents Culverts IPS
08Th2619.0018.3014,00-15,008.00Clarification for IPS 08 - DN 66 /
Minutes of GI - DN 66 - for the following IPS / Input new dates
received from DRDP Timisoara - LOT 6 IPC 19 - Riverbed cleaning /
Site daily journal / Daily Activity Program / Select pictures from
site - Ernest-Dorian-Bob / Fr2719.0018.3014,00-15,008.00DN 66 - BD
culverts / Photo monthly Report - started / Daily Activity
ProgramSa28Su29Mo3019.0018.3014,00-15,008.00At Tg Jiu - DN 66 - IPS
08 issuesTOTAL23184.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul14823171Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:10/1/13
ore lucrate1841.82Verificare 00.00Rata /or10Curs 30 sep4.4560Val
(Lei)8,199.04Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:30-Sep-13Total zile de
contract:907Total zile scurse:237Total zile rmase:670184
Octombrie 2013Month/Mes:Octombrie / Octubre / OctoberName of
Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALOctombrie /
Octubre / October
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulTu119.0018.3014,00-15,008.00Preparation
Breakdown CULVERTS V2 / Culvers daily update / Daily site journal /
Daily activity programWe219.0018.3014,00-15,008.00Preparation
Breakdown CULVERTS V3 / At Tg Jiu with IPS
08Th319.0018.3014,00-15,008.00At Tg Jiu with IPS 08 / Daily site
journal / Daily activity programFr419.0018.3014,00-15,008.00Update
culverts summary / Photographic report / Daily site journal / Daily
activity programSa5Su6Mo719.0018.3014,00-15,008.00Monthly Report /
Culvers / IPS 10 / Daily site journal / Daily Activity
ProgramTu819.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site
Journal / Daily Activity JournalWe919.0018.3014,00-15,008.00Tg Jiu
- IPS 08 / Daily site Journal / Daily Activity
JournalTh1019.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site
Journal / Daily Activity JournalFr110.59.0013.004.00 IPS 08 / Daily
site Journal / Daily Activity
JournalSa12Su13Mo1419.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily
site Journal / Daily Activity
JournalTu1519.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site
Journal / Daily Activity JournalWe1619.0018.3014,00-15,008.00Tg Jiu
- IPS 08 / Daily site Journal / Daily Activity
JournalTh1719.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site
Journal / Daily Activity JournalFr1819.0018.3014,00-15,008.00Tg Jiu
- IPS 08 / Daily site Journal / Daily Activity
JournalSa190.511.0018.3014.00-15.004.00IPC - IPS 08 - Update
culverts summary / Photo monthly
reportSu20Mo2119.0018.3014,00-15,008.00IPC - IPS 08 - Update
culverts summaryTu2219.0018.3014,00-15,008.00Tg Jiu - IPC 03 /
Summary list for mr. Chesnoiu /Daily site Journal / Daily Activity
JournalWe2319.0018.3014,00-15,008.00Preparation IPS 10 - september
/ Daily site journal / Daily Activity
JournalTh2419.0018.3014,00-15,008.00LOT 6 - dragos enasescu visit -
VO11-VO12-VO09(Valea Mica) / Daily site Journal / Daily activity
Program / Daily measurements culverts /
Fr2519.0018.3014,00-15,008.00Ips 10 - Gi / Daily site Journal /
Daily activity Program / Daily measurements culverts /
Sa26Su27Mo2819.0018.3014,00-15,008.00Meeting Tg Jiu 5r3 - IPS nr.08
- respond to the queries on rejection letter of IPS 08 / / Daily
site Journal / Daily activity Program
/Tu2919.0018.3014,00-15,008.00Build IPS 10 - culverts - situation
of Missing Supporting Documents / / Daily site Journal / Daily
activity Program / We3019.0018.3014,00-15,008.00Ips 10 - culverts /
LOT 6 - Marius Pirnuta queries on LOT 6 VO 12 AND VO13 / Daily site
Journal / Daily activity Program / Daily measurements culverts /
Th3119.0018.3014,00-15,008.00Ips 10 - print / Answer to querries
regarding Materials on site IPS 08 5r3 / Daily site Journal / Daily
activity Program / Daily measurements culverts /
TOTAL23184.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul17123194Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:10/31/13
ore lucrate184Verificare 00.00Rata /or10Curs 30 sep4.4304Val
(Lei)8,151.94Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:2-Oct-13Total zile de
contract:907Total zile scurse:239Total zile rmase:668
Noiembrie 2013Month/Mes:Noiembrie / Noviembre / NovemberName of
Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALNoiembrie /
Noviembre / November
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulFr119.0018.3014,00-15,008.00Ips 10 -
print / Finish, sent to Engineer/ Daily site Journal / Daily
activity Program / Daily measurements - Excavations /
Sa2Su3Mo419.0018.3014,00-15,008.00Targu Jiu - at Engineer Office
answer querries for IPC 02 / Daily activity Program / Daily
measurements - Excavations, Culverts /
Tu519.0018.3014,00-15,008.00IPS 11 - GI / Breakdown for Slope Mesh
/ Daily site Journal / Daily Activity Journal / Monthly Report -
Photo ReportWe619.0018.3014,00-15,008.00Targu Jiu - at Engineer
Office answer querries for IPC 02 / Daily activity Program / Daily
measurements - Excavations, Culverts Monthly Report - Copies and
ScanTh719.0018.3014,00-15,008.00Targu Jiu - at Engineer Office
answer querries for IPC 02 / Daily activity Program / Daily
measurements - Excavations, Culverts / Monthly Report - Sent to
EngineerFr819.0018.3014,00-15,008.00Targu Jiu - at Engineer Office
- final preparations for IPC 02 / Daily activity Program / Daily
measurements - Excavations, Culverts
Sa919.0018.3014.00-15.008.00IPS 11 - GI / Daily Measurements -
CulvetsSu10Mo1119.0018.3014,00-15,008.00IPS 11 - GI / Daily
Measurements - Culverts / Daily site Journal / Daily Activity
JournalTu1219.0018.3014,00-15,008.00IPS 11 / Daily Measurements -
Excavations / Daily site Journal / Daily Activity
JournalWe1319.0018.3014,00-15,008.00IPS 11 / Daily Measurements -
Asphalt / Daily site Journal / Daily Activity
JournalTh1419.0018.3014,00-15,008.00IPS 11 / Daily Measurements -
Conterlevels / Daily site Journal / Daily Activity
JournalFr1519.0018.3014,00-15,008.00IPS 11 - Daily Measurements -
Material - Final preparation - Sent at Targu Jiu for handover and
explanations / Daily site Journal / Daily Activity
JournalSa1619.0018.3014.00-15.008.00IPS - Updating Materials List
for Precast Elements / Sand / Balast / Cement / IPS - Update of
Status of Culverts on Site - Justified and
BuiltSu17Mo1819.0018.3014,00-15,008.00IPS 12 - GI's / Daily
Measurements - Culverts / Daily site Journal / Daily Activity
JournalTu1919.0018.3014,00-15,008.00IPS 12 - Daily Measurements -
Slope Mesh / Preparing Breakdown for Slope Protection - Mesh /
Daily site Journal / Daily Activity
JournalWe2019.0018.3014,00-15,008.00IPS 12 - Daily Measurements -
Slope Mesh, Asphalt and Excavations / Preparing Breakdown for Slope
Protection - Mesh / Daily site Journal / Daily Activity
JournalTh2119.0018.3014,00-15,008.00IPS 12 - Daily Measurements -
Culverts / Final - Breakdown for Slope Protection - Mesh / Daily
site Journal / Daily Activity
JournalFr2219.0018.3014,00-15,008.00IPS 12 - Daily Measurement -
Materials - Print to be sent to Engineer - Way to Tg Jiu to
handover IPS 12 and explanations / Daily site Journal / Daily
Activity JournalSa2319.0018.3014.00-15.008.00IPC 03 - Preparation
along with Engineer QS, answering the queries / Preparing Copies
Ready for CNADNR approval - Deadline Monday 25th
nov.Su2419.0018.3014.00-15.008.00Way to Craiova - IPC 03 - Obtaing
signatures needed from Resident Engineer and from Project Manager -
Deadline Monday 25th nov.Mo2519.0018.3014,00-15,008.00IPS 11, 12,
IPC 03 - Way to Bucharest at CNADNR to handover the IPC 03 / Daily
site Journal / Daily Activity
JournalTu2619.0018.3014,00-15,008.00LOT 6 - Caransebes Bypass /
DRDP Timisoara clarifications for Valea Mica, planning VO 11, 12
and 13 / Daily site Journal / Daily Activity
JournalWe2719.0018.3014,00-15,008.00Planning IPS 13 / Measurents
Valea Mica, ballast and extraexcavations / Daily Site Journal /
Daily Activity ProgramTh2819.0018.3014,00-15,008.00Review of IPC 2
and 3 to detarmine difference in payments regarding on planning IPS
13 / Measurents Valea Mica, ballast and extraexcavations / Daily
Site Journal / Daily Activity
ProgramFr2919.0018.3014,00-15,008.00IPS 13 - GI / Daily Site
Journal / Daily Activity ProgramTOTAL25200.00Summary of Days Worked
To DateContractTOTALPreviousThis MonthCumul19425219Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:11/29/13
ore lucrate200Verificare 00.00Rata /or10Curs 29 nov4.4412Val
(Lei)8,882.40Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:30-Nov-13Total zile de
contract:907Total zile scurse:298Total zile rmase:609
Decembrie 2013Month/Mes:Decembrie / Diciembre / DecemberName of
Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALDecembrie /
Diciembre / December
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.00IPS 13 -
GI / Daily Site Journal / Daily Activity
ProgramTu319.0018.3014,00-15,008.00Monthly Report - November 2013 /
Daily Site Journal / Daily Activity
ProgramWe419.0018.3014,00-15,008.00Monthly Report - Photographic
Report - November 2013 / Daily Site Journal / Daily Activity
ProgramTh519.0018.3014,00-15,008.00At Caransebes at the Military
Unit - Meeting for Reception with Anedan and Military Unit
Representative Fr619.0018.3014,00-15,008.00Monthly Progress Report
- Anexe / Daily site Journal (signed by Resident Engineer) -
Prepare copies / Scan original / Sent / Daily Site Journal / Daily
Activity ProgramSa7Su8Mo919.0018.3014,00-15,008.00Answer querries
on IPC02 and IPC03 regarding Materials on Site on the side of the
Report prepared by the Consultant of Ministry of Transport / Daily
Site Journal / Daily Activity
ProgramTu1019.0018.3014,00-15,008.00Answer querries on IPC02 and
IPC03 regarding Materials on Site on the side of the Report
prepared by the Consultant of Ministry of Transport. / Daily Site
Journal / Daily Activity ProgramWe1119.0018.3014,00-15,008.00Answer
querries on IPC02 and IPC03 regarding Materials on Site on the side
of the Report prepared by the Consultant of Ministry of Transport.
/ Daily Site Journal / Daily Activity
ProgramTh1219.0018.3014,00-15,008.00IPS 13 - GI - Clearing
Utilities Documents / Daily Site Journal / Daily Activity
ProgramFr1319.0018.3014,00-15,008.00IPS 13 - Daily Measurements -
Various Tables - Mainly Culverts / Daily Site Journal / Daily
Activity ProgramSa14Su15Mo1619.0018.3014,00-15,008.00Table of
IPC'es details for LOT 6 - asked by DRDP Timisoara - New Engineer
Team Office/ Daily Site Journal / Daily Activity
ProgramTu1719.0018.3014,00-15,008.00Table of VO's details for LOT 6
- asked by DRDP Timisoara - New Engineer Team Office/ Daily Site
Journal / Daily Activity ProgramWe1819.0018.3014,00-15,008.00IPS 13
- Ballace of culverts between requests and payed / Clarification of
Remaining Supportig Documents / Daily Site Journal / Daily Activity
ProgramTh1919.0018.3014,00-15,008.00IPS 13 - Final checking / Daily
Site Journal / Daily Activity
ProgramFr2018.3017.3014,00-15,008.00Ballace of culverts between
requests and payed / Clarification of Remaining Supportig Documents
/ Daily Site Journal / Daily Activity
ProgramSa21Su22Mo2318.3017.3014,00-15,008.00Ordering Documents -
IPS'es / IPC'es first working year / Daily Activity Program / Daily
Site JournalTu2418.3017.3014,00-15,008.00Ordering Documents -
IPS'es / IPC'es first working year / Daily Activity Program / Daily
Site JournalWe25FELIZ NAVIDAD
!Th26Fr2718.3017.3014,00-15,008.00Ordering Documents - IPS'es /
IPC'es first working year / Daily Activity Program / Daily Site
JournalSa28Su29Mo3018.3017.3014,00-15,008.00Monthly Report -
December 2013 / Daily Site Journal / Daily Activity
ProgramTu3118.3017.3014,00-15,008.00Monthly Report - Photographic
Report - December 2013 / Daily Site Journal / Daily Activity
ProgramTOTAL20160.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul21920239Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve
Martin
Date:12/18/13
ore lucrate160Verificare 00.00Rata /or10Curs 18 dec4.4749Val
(Lei)7,159.84Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:31-Dec-13Total zile de
contract:907Total zile scurse:329Total zile rmase:578
Ianuarie 2014Month/Mes:Ianuarie / Enero / JanuaryName of
Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALIanuarie / Enero
/ January
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulFr319.0018.3014,00-15,008.00Monthly
Report - December 2013 - Written section / Daily Site Journal to be
singned by Engineer , Print, Scan, Copy, Tide it, Prepare the
Letter / Daily Site Journal / Daily Activity
ProgramSa4Su5Mo619.0018.3014,00-15,008.00Sent Monthy Report
December 2013 at Engineer / Daily Site Journal / Daily Activity
ProgramTu719.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily
Site Journal / Daily Activity Program/
We819.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site
Journal / Daily Activity Program/ Th919.0018.3014,00-15,008.00IPS
13 - December 2013 / Daily Site Journal / Daily Activity Program/
Fr1019.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site
Journal / Daily Activity Program/
Sa11Su12Mo1319.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily
Site Journal / Daily Activity Program/
Tu1419.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site
Journal / Daily Activity Program/ We1519.0018.3014,00-15,008.00IPS
13 - December 2013 / Daily Site Journal / Daily Activity Program/
Th1619.0018.3014,00-15,008.00LOT 6 - Overview Unapproved Variation
Orders / Daily Site Journal / Daily Activity Program/
Fr1719.0018.3014,00-15,008.00LOT 6 - Overview Unapproved Variation
Orders - Contact Diana Pogaci and/or Marius Pirnuta / Daily Site
Journal / Daily Activity Program/
Sa18Su19Mo2019.0018.3014,00-15,008.00LOT 6 - Overview Unapproved
Variation Orders / Daily Site Journal / Daily Activity Program/
Tu2119.0018.3014,00-15,008.00Way to Caransebes and then to
Timisoare to search for IPC 17 - LOT 6 Caransebes Bypass / Daily
Activity Program / Daily site
JournalWe2219.0018.3014,00-15,008.00Contact Diana Pogaci (CNADNR -
LOT 6 QS - replaces Marius Pirnuta) for VO11, VO12 and VO13 /
Contact Liliana Toma - Ramboll and Marius Pirnuta - ask for IPC17
Lot 6 / Prepare Front Tables for VO11-Vertical Signals in
accordance with Diana's Request / Daily Activity Program / Daily
Site JournalTh2319.0018.3014,00-15,008.00Prepare IPS 17 Lot 6 on M.
Pirnuta format / Daily Activity Program / Daily Site
JournalFr2419.0018.3014,00-15,008.00Various Checks on Quantities
5R3 / Preparing Tables / Overview Supporting Documents / Daily
Activity Program / Daily Site Journal
Sa25Su26Mo2719.0018.3014,00-15,008.00Various Checks on Quantities
5R3 / VO 11 - Vertical Signal - Supporting Document, Quantities
DDE/ Daily Activity Program / Daily Site Journal
Tu2819.0018.3014,00-15,008.00VO 11 - Vertical Signal - Supporting
Document, Quantities DDE/ Letter LOT6 - IPC17-Retention Money /
Daily Activity Program / Daily Site Journal
We2919.0018.3014,00-15,008.00IPS 13 - January 2014 / Work Procedure
for IPS'es / Daily Activity Program / Site
JournalTh3019.0018.3014,00-15,008.00IPS 13 - January 2014 / Daily
Activity Program / Site JournalFr3119.0018.3014,00-15,008.00IPS 13
- January 2014 / Daily Activity Program / Site
JournalTOTAL21168.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul23921260Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:1/31/14
ore lucrate168Verificare 00.00Rata /or10Curs 18 dec4.4978Val
(Lei)7,556.30Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:31-Jan-14Total zile de
contract:907Total zile scurse:360Total zile rmase:547
Februarie 2014Month/Mes:Februarie / Fevrero / FebruaryName of
Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name:
Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract
Number: 3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALFebruarie /
Fevrero / February
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00In Tg
Jiu at Engineer Office / Photographic Report - January 2014 / Daily
Site Journal / Daily Activity
ProgramTu419.0018.3014,00-15,008.00Monthly Report - January 2014 -
Print, Scan / Daily Site Journal / Daily Activity
ProgramWe519.0018.3014,00-15,008.00IPS 13 - November, December,
January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity JournalTh619.0018.3014,00-15,008.00LOT 6 -
Caransebes Bypass - VO's Summary Sheet / 5R3 - IPS 13 / IPC Payment
Details / Daily Activity Program / Daily Site
JournalFr719.0018.3014,00-15,008.00IPS 13 - November, December,
January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity JournalSa8Su9Mo1019.0018.3014,00-15,008.00LOT6 -
Caransebes Bypass - Prepare and sent e-mail explanations regarding
IPC 17 to DRDP Timisoara / 5r3 - Mining Royalty Fee_Financial
Implications_Changes in Law / Daily Site Journal / Daily Activity
ProgramTu1119.0018.3014,00-15,008.00DRDP Timisoara - LOT 6 -
clarifications IPC 17 and VO's / Daily Site Journal / Daily
Activity ProgramWe1219.0018.3014,00-15,008.00DRDP Timisoara - LOT 6
- clarifications IPC 17, survey Valea Mic, quantities Valea Mic,
Editing Minute of Appendix of 20th dec 2013, Taking - Over Minute,
Variation Orders / Daily Site Journal / Daily Activity
ProgramTh1319.0018.3014,00-15,008.00DRDP Timisoara - LOT 6 -
clarifications IPC 17, survey Valea Mic, quantities Valea Mic,
Editing Minute of Appendix of 20th dec 2013, Taking - Over Minute,
Variation Orders / Daily Site Journal / Daily Activity
ProgramFr1419.0018.3014,00-15,008.00Preaparing Breakdown GI 06 /
Daily Activity Program / Daily site
JournalSa1519.0018.3014,00-15,008.00Preaparing IPC 13 - Supporting
DocumentsSu16Mo1719.0018.3014,00-15,008.00IPS 13 - Supporting
Document / Daily Measurements - CUlverts / Daily Activity Program /
Daily site JournalTu1819.0018.3014,00-15,008.00IPS 13 - Supporting
Document / Daily Measurements - Cantilevers / Daily Activity
Program / Daily site JournalWe1919.0018.3014,00-15,008.00IPS 13 -
Supporting Document / General Items_Print_Scan / Daily Activity
Program / Daily site JournalTh2019.0018.3014,00-15,008.00Handing
over the IPS 13 at Targu Jiu_Engineer Office / Daily Activity
Program / Daily Site JournalFr2119.0018.3014,00-15,008.00Daily
Measurements - Bridges / Daily Activity Program / Daily site
JournalSa22Su23Mo2419.0018.3014,00-15,008.00Preparing Breakdowns_
E14 - Umplutura cu Material Drenant / Preparing Breakdowns _ MS5 -
Parapet New Jersey pe zid de sprijin / Daily Activity Program /
Daily Site JournalTu2519.0018.3014,00-15,008.00Study for
preparation of Breakdowns_ B38 - Injectare fisuri cu rasini
epoxidice, E13 - 4 _ Excavarea in roci stancoase cu exploziv , B72
- Derocare stanca - fara explozibil / CO 07 - Console din beton
armat / Daily Activity Program / Daily Site
JournalWe2619.0018.3014,00-15,008.00Preparing Breakdowns_ E13 - 4 _
Excavarea in roci stancoase cu exploziv , B72 - Derocare stanca -
fara explozibil / Daily Activity Program / Daily Site
JournalTh2719.0018.3014,00-15,008.00Preparing Breakdowns CO 07 -
Console din beton armat / Daily Activity Program / Daily Site
JournalFr2819.0018.3014,00-15,008.00Preparing Photographic Report _
february 2014TOTAL21168.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul26021281Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:2/28/14
ore lucrate168Verificare 00.00Rata /or10Curs 18 dec4.4978Val
(Lei)7,556.30Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:31-Jan-14Total zile de
contract:907Total zile scurse:360Total zile rmase:547
Martie 2014Month/Mes:Martie / Marzo / MarchName of Company: S.C.
INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name: Crlig Constantin
- FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number:
3080-003/13-din 05.02.2013
MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALMartie / Marzo /
March
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00In Tg
Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for
Photographic Report - February 2014 / Daily Site Journal / Daily
Activity ProgramTu419.0018.3014,00-15,008.00Preparing Photo Report
/ Monthly Report - under construction / Daily Site Journal / Daily
Activity ProgramWe519.0018.3014,00-15,008.00Mesurement of real DDE
quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly
Report - under construction / Daily Site Journal / Daily Activity
ProgramTh619.0018.3014,00-15,008.00Mesurement of real DDE
quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly
Report - under construction / Daily Site Journal / Daily Activity
ProgramFr719.0018.3014,00-15,008.00Measurement LOT 6 - Vertical
Signal DDE, for VO signals and markings / Daily Site Journal /
Daily Activity ProgramSa8Su9Mo1019.0018.3014,00-15,008.00In Tg Jiu
at Engineer Office for IPC 05 - 5r3 / Taking Pictures for
Photographic Report - March 2014 / Daily Site Journal / Daily
Activity ProgramTu1119.0018.3014,00-15,008.00Breakdows 5r3 /
Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention
Money / Daily Site Journal / Daily Activity
ProgramWe1219.0018.3014,00-15,008.00Breakdows 5r3 / Clarifications
Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily
Site Journal / Daily Activity
ProgramTh1319.0018.3014,00-15,008.00Breakdows 5r3 / Daily Site
Journal / Daily Activity
ProgramFr1419.0018.3014,00-15,008.00Breakdows 5r3 / Daily Site
Journal / Daily Activity
ProgramSa15Su16Mo1719.0018.3014,00-15,008.005R3 - IPS14 / Daily
Site Journal / Daily Activity
ProgramTu1819.0018.3014,00-15,008.005R3 - IPS14 / LOT 6 - Prepare
Electronic Statement at Completion for Liliana Toma and Doru
Borlovan / Daily Site Journal / Daily Activity
ProgramWe1919.0018.3014,00-15,008.005R3 - IPS14 / Daily
Measurements - Culverts / 5r3 - Daily Site Journal / 5r3 - Daily
Activity ProgramTh2019.0018.3014,00-15,008.005R3 - IPS14 / Daily
Measurements - Materials / LOT 6 - Arrangements with Liliana Toma
regarding IPC17 for Andrew Inmann arrival on 25th March / 5r3 Daily
Site Journal / 5r3 Daily Activity Program / 5r3 - Taking pictures
for Monthly Report - March / Taking contact with Subcontractor's
staff for Daily Activity SheetsFr2119.0018.3014,00-15,008.005R3 -
IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site
Journal / 5r3 Daily Activity
ProgramSa22Su23Mo2419.0018.3014,00-15,008.005R3 - IPS14 / Daily
Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3
Daily Activity Program / LOT 6 - Get knowledge about SAT in
preparation for Tomorrow meeting with DRDP Timisoara Engineer
RepresentativesTu2519.0018.3014,00-15,008.005R3 - IPS14 / Daily
Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3
Daily Activity Program / LOT 6 - Meeting with DRDP Timisoara
Engineer Representatives - presenting the SAT for LOT 6 and
planning a schedule of workWe2619.0018.3014,00-15,008.005R3 - IPS14
/ Daily Measurements - Materials + Culverts / 5r3 Daily Site
Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in
relation with SAC (for DRDP
Timisoara)Th2719.0018.3014,00-15,008.005R3 - IPS14 / Daily
Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3
Daily Activity Program / Went to site for pictures in preparation
of Photo Report - March 2014Fr2819.0018.3014,00-15,008.005R3 -
IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site
Journal / 5r3 Daily Activity Program / Preparating of Photo Report
- March 2014. Went on site with technical office to analize consola
in specific areas.Sa2919.0018.3014,00-15,008.005R3 - Daily Site
Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in
relation with SAC (for DRDP Timisoara) , VO 11 and VO 12 Vertical
Signal and Horizontal MarkingsSu30Mo3119.0018.3014,00-15,008.005R3
- IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily
Site Journal / 5r3 Daily Activity Program / Preparating of Photo
Report - March 2014.Preparing the Monthly Report _ March
2014TOTAL22176.00Summary of Days Worked To
Date20-Feb-14ContractTOTALPreviousThis MonthCumul28122303Employee's
SignatureGeneral ManagerProject Manager2856Crlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve
Martin20-Mar-1417-Apr-14Date:3/31/14
ore lucrate176Verificare 00.00Rata /or10Curs 18 dec4.4553Val
(Lei)7,841.33Data ncepere contract:5-Feb-13Data finalizare
contract:1-Aug-15Azi suntem n data de:1-Apr-14Total zile de
contract:907Total zile scurse:420Total zile rmase:487
Aprilie 2014Month/Mes:Aprilie / Abril / AprilName of Company:
S.C. INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Aprilie
/ Abril / AprilPn la main:20-Jun-14DayDateDays WorkedHourWork
DescriptionOBS.Azi suntem n data
de:30-Apr-14ArrDepBreakCumulTu119.0018.3014,00-15,008.005R3 - IPS14
/ Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3
Daily Site Journal / 5r3 Daily Activity Program / Preparating of
Photo Report - March 2014.Preparing the Monthly Report _ March
2014Total zile rmase:51We219.0018.3014,00-15,008.00Went ot Tg Jiu
at Hyder, engineer office to close the Daily Site Journal for March
2014 / 5r3 Daily Activity Program / Taking Pictures for Photo
Report - April 2014. / Preparing the Monthly Report _ March
2014Th319.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements -
Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal /
5r3 Daily Activity Program / Preparing the Monthly Report _ March
2014Fr419.0018.3014,00-15,008.00LOT 6 - Discutions on IPC at
Completion / 5R3 - IPS14 / Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Preparing the Monthly Report _ March 2014 - scan, copies,
bounding - ready to be sent to Engineer up to 7th of March
according with the contract.Sa5Su6Mo719.0018.3014,00-15,008.00LOT 6
- Ask clarifications about the time of completing a determination /
LOT 6 - Answer to Dragos Enasescu's e-mail regarding A027B
justifications / 5R3 - Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Send Monthly Report _ March 2014.
Tu819.0018.3014,00-15,008.00LOT 6 - Finalyse and send explanations
for A027b/ 5R3 - Preparing daily site journal - blank, for
subcontractors / Daily measurements - Slope protection / Daily
measurements - culverts / Daily Activity Program / Daily Site
Journal We919.0018.3014,00-15,008.00LOT 6 - Finalyse and send
explanations for A027b/ 5R3 - Preparing daily site journal - blank,
for subcontractors / Daily measurements - Slope protection /
Translating Index for Informe tecnico/ Daily measurements -
culverts / Daily Activity Program / Daily Site Journal
Th1019.0018.3014,00-15,008.005R3 - Daily measurements - Bridge
125+320 / Daily measurement - Culverts / Translating Informe
tecnico/ Daily Activity Program / Daily Site Journal
Fr1119.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
Sa1219.0013.004.005R3 - Daily measurements - Slope protection,
Contilevels , Bridge 125+320, Culverts / Translating Informe
tecnico/ Daily Activity Program / Daily Site Journal
Su13Mo1419.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
Tu1519.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
We1619.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April
2014Th1719.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April
2014Fr1819.0018.3014,00-15,008.005R3 - Daily measurements - Update
IPS 14 - under construction / Daily Activity Program / Daily Site
Journal / Working on Photo Report for April
2014Sa19Su20EASTERMo21Second Day of
EASTERTu2219.0018.3014,00-15,008.005R3 - Daily measurements -
Update IPS 14 - under construction / Daily Activity Program / Daily
Site Journal / Working on Photo Report for April
2014We2319.0018.3014,00-15,008.00Targu Jiu at Engineer office to
sign the Daily Site Journal / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity
Program / Daily site JournalTh2419.0018.3014,00-15,008.00LOT 6 -
Caransebes - Preparing answer to SoC in cooperation with Oscar and
T.E.A. / 5R3 - Daily Activity Program / Daily site
JournalFr2519.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing
answer to SoC in cooperation with Oscar and T.E.A. / 5R3 -
Preparing support documents for Materials in the issue of maintaing
them in the IPC 05 since the FEDR Dep in Transport Ministry is
looking to cut them / 5R3 - Daily Activity Program / Daily site
JournalSa2619.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing
answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily
Activity Program / Daily site
JournalSu27Mo2819.0018.3014,00-15,008.005R3 - Preparing support
documents for Materials in the issue of maintaing them in the IPC
05 since the FEDR Dep in Transport Ministry is looking to cut them
/ LOT 6 - Caransebes - Preparing answer to SoC in cooperation with
Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site
JournalTu2919.0018.3014,00-15,008.005R3 - Preparing support
documents for Materials in the issue of maintaing them in the IPC
05 since the FEDR Dep in Transport Ministry is looking to cut them
/ LOT 6 - Caransebes - Preparing answer to SoC in cooperation with
Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site
JournalWe3019.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing
answer to SoC in cooperation with Oscar and T.E.A. / 5R3 -
Preparing support documents for Materials in the issue of maintaing
them in the IPC 05 since the FEDR Dep in Transport Ministry is
looking to cut them / 5R3 - Daily Activity Program / Daily site
JournalTOTAL23180.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul30323326Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:4/30/14
ore lucrate184Verificare 0-4.00Rata /or10Curs 18 dec4.4600Val
(Lei)8,206.40
Mai 2014Month/Mes:Mai / May / MaioName of Company: S.C. INTEGRAL
DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's
Name: Crlig Constantin - FlorinData finalizare
contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data
de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile
de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE
ASISTENCIA MENSUALTotal zile rmase:481Mai / May / Maio
DayDateDays WorkedHourWork DescriptionOBS.Pn la
main:20-Jun-14ArrDepBreakCumulAzi suntem n data
de:30-May-14Th119.0018.3014,00-15,008.005R3 - Preparing photograph
for Photo Monthly Report - April 2014 / Preparing Monthly Report -
April 2014 / 5R3 - Daily Site Journal / Daily Activity
ProgramFr219.0018.3014,00-15,008.005R3 - Preparing Monthly Report -
April 2014 - Scan / 2 Copies / Bounding - as final preparation to
be ready for sent / LOT 6 - Review answer prepared by TEA for DRDP
Timisoara and prepare papers to be sent to DRDP accordingly. / 5R3
- Daily Site Journal / Daily Activity ProgramTotal zile
rmase:21Sa3Su4Mo519.0018.3014,00-15,008.005R3 - Daily measurements
- Slope protection, Contilevels , Bridges / Working on Photo Report
for April 2014 / 5R3 - Daily Site Journal / Daily Activity
ProgramTu619.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / Daily Activity Program / Daily
Site Journal / Working on Photo Report for April 2014 / LOT 6 -
speak with Marius Pirnuta about VO11/12/13 - sent by e-mail
previously named document for review in preparation for the next
week meeting / 5R3 - Daily Site Journal / Daily Activity
ProgramWe719.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / 5r3 - Daily Site Journal /
Daily Activity Program / Prepare answer for AM
POSTTh819.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / 5r3 - Daily Site Journal /
Daily Activity Program / LOT 6 - Final preparation support
documents for TEA in order to send an answer to DRDP TIMISOARA -
BoQFr919.0018.3014,00-15,008.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / 5r3 - Daily Site Journal /
Daily Activity Program / LOT 6 - Final preparation support
documents for TEA in order to send an answer to DRDP TIMISOARA -
Variation OrdersSa10111.0016.005.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / 5r3 - Daily Site Journal /
Daily Activity Program Su11Mo1219.0018.3014,00-15,008.005R3 - Daily
measurements - Slope protection, Contilevels , Bridges / 5r3 -
Daily Site Journal / Daily Activity Program / LOT 6 - Final
preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for
tomorrow meeting with DRDP Timisoara and with
CNADNRTu1319.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and
with CNADNR representative Marius Pirnuta / / 5r3 - Daily Site
Journal / Daily Activity ProgramWe1419.0018.3014,00-15,008.00LOT 6
- Meeting at Caransebes (with Oscar) for clarifications regarding
SaC and PM's with DRDP TIMISOARA - representatives, Dragos Enasescu
and Doru Borlovan and with CNADNR representative Marius Pirnuta .
Also at the meeting attended David Saiz, Marian Copilu and Liliana
Dimitriu / / 5r3 - Daily Site Journal / Daily Activity
ProgramTh1519.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and
with CNADNR representative Marius Pirnuta . Also at the meeting
attended Liliana Dimitriu / / 5r3 - Daily Site Journal / Daily
Activity ProgramFr1619.0018.3014,00-15,008.00LOT 6 - Preparation of
Minute of the discutions held durring the week / Ask lette VO9 to
Liliana Toma / Send the Minute to all participants at the meeting /
Make a plan of solving the issues on SaC and PM along with Oscar /
/ 5R3 - Update the quantities - collect the datas from production
department / Daily Site Journal / Daily Activity
ProgramSa17112.0016.004.005R3 - Daily measurements - Slope
protection, Contilevels , Bridges / 5r3 - Daily Site Journal /
Daily Activity Program Su18Mo1919.0018.3014,00-15,008.005R3 - Daily
measurements - Slope protection, Contilevels , Bridges / 5r3 -
Daily Site Journal / Daily Activity Program / LOT 6 - Final
preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for
tomorrow meeting with DRDP Timisoara and with
CNADNRTu2019.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. /
5r3 - Daily Site Journal / Daily Activity
ProgramWe2119.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. /
5r3 - Daily Site Journal / Daily Activity
ProgramTh2219.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. /
5r3 - Daily Site Journal / Daily Activity
ProgramFr2319.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes
(with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. /
5r3 - Daily Site Journal / Daily Activity
ProgramSa2419.0018.3014,00-15,008.005R3 - Daily measurements -
Slope protection, Contilevels , Bridges / Preparing the IPS no. 14
/ 5r3 - Daily Site Journal / Daily Activity Program
Su25Mo2619.0018.3014,00-15,008.005R3 - Daily measurements -
Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program Tu2719.0018.3014,00-15,008.00LOT 6
- with DRDP TIMISOARA - representative, Dragos Enasescu
preparations of Variatios regarding SaC / 5r3 - Daily Site Journal
/ Daily Activity ProgramWe2819.0018.3014,00-15,008.00LOT 6 - with
DRDP TIMISOARA - representative, Dragos Enasescu preparations of
Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramTh2919.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA -
representative, Dragos Enasescu preparations of Variatios regarding
SaC also way to Casansebes, in the firs part of the day - to check
on site the step dichs, the ditches and the quantities on
roundabouts / 5r3 - Daily Site Journal / Daily Activity
ProgramFr3019.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA -
representative, Dragos Enasescu preparations of Variatios regarding
SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramSa31TOTAL25193.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul32625351Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:5/30/14
ore lucrate193.Verificare 00.00Rata /or10Curs4.3963Val
(Lei)8,484.86
Iunie 2014Month/Mes:Iunie / June / JunioName of Company: S.C.
INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Iunie /
June / Junio
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.005R3 -
Daily measurements - Slope protection, Contilevels , Bridges /
Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal /
Daily Activity ProgramPn la
main:26-Jun-14Tu319.0018.3014,00-15,008.005R3 - Daily measurements,
Keeping accounts of the work in relation with production to build
the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site
Journal / Daily Activity ProgramAzi suntem n data
de:1-Jul-14We419.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA
- representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramTotal zile rmase:-5Th519.0018.3014,00-15,008.00LOT 6 - with
DRDP TIMISOARA - representative, Dragos Enasescu preparations of
Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramFr619.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA -
representative, Dragos Enasescu preparations of Variatios regarding
SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramSa7Su8Mo919.0018.3014,00-15,008.005R3 - Daily measurements,
Keeping accounts of the work in relation with production to build
the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site
Journal / Daily Activity ProgramTu1019.0018.3014,00-15,008.00LOT 6
- with DRDP TIMISOARA - representative, Dragos Enasescu
preparations of Variatios regarding SaC / 5r3 - Daily Site Journal
/ Daily Activity ProgramWe1119.0018.3014,00-15,008.00LOT 6 - with
DRDP TIMISOARA - representative, Dragos Enasescu preparations of
Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramTh1219.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA -
representative, Dragos Enasescu preparations of Variatios regarding
SaC / 5r3 - Daily Site Journal / Daily Activity
ProgramFr1319.0018.3014,00-15,008.005R3 - Daily measurements,
Keeping accounts of the work in relation with production to build
the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site
Journal / Daily Activity ProgramSa14111.0016.005.005R3 - Daily
measurements - Slope protection, Contilevels , Bridges / 5r3 -
Daily Site Journal / Daily Activity Program
carlosSu15Mo1619.0018.3014,00-15,008.005R3 - Daily measurements -
Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program Tu1719.0018.3014,00-15,008.005R3 -
Daily measurements, Receiving Minutes from Quality Department
(Proces verbal - Podete / Console) and keeping accounts of the work
in relation with production to build the IPS 14 / Preparing Monthly
Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity
ProgramWe1819.0018.3014,00-15,008.005R3 - Daily measurements,
Keeping accounts of the work in relation with production to build
the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site
Journal / Daily Activity ProgramTh1919.0018.3014,00-15,008.00LOT 6
- with DRDP TIMISOARA - representative, Dragos Enasescu
preparations of Variatios regarding SaC / 5r3 - Daily Site Journal
/ Daily Activity ProgramFr2019.0018.3014,00-15,008.00LOT 6 - VO 14
- PM 10 / 5r3 - Daily Site Journal / Daily Activity
ProgramSa21Su22Mo2319.0018.3014,00-15,008.00LOT 6 - VO 14 - PM 10 /
5r3 - Daily Site Journal / Daily Activity
ProgramTu2419.0018.3014,00-15,008.00LOT 6 - VO 14 - PM 09 and
Overpassed quantities summary sheets / 5r3 - Daily Site Journal /
Daily Activity ProgramWe2519.0018.3014,00-15,008.00LOT 6 - went to
Caransebes for signature on Variation Orders VO13 meeting DRDP
representatives, Dragos Enasescu and Doru borlovan / 5r3 - Daily
Site Journal / Daily Activity
ProgramTh2619.0018.3014,00-15,008.00LOT 6 - preparation of summary
for VO13 / 5r3 - Daily Site Journal / Daily Activity
ProgramFr2719.0018.3014,00-15,008.00LOT 6 - preparation of summary
for VO13 / 5r3 - Daily Site Journal / Daily Activity
ProgramSa28Su29Mo3019.0018.3014,00-15,008.00LOT 6 - preparation of
summary for VO13 / 5r3 - Daily Site Journal / Daily Activity
ProgramTOTAL22173.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul35122373Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:6/30/14
ore lucrate173Verificare 00.00Rata /or10Curs4.3963Val
(Lei)7,605.60
Iulie 2014Month/Mes:Iulie / July / JulioName of Company: S.C.
INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Iulie /
July / Julio
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulTu119.0018.3014,00-15,008.00LOT 6 -
preparation of 2 copies for VO13 - overpass quantities / 5r3 -
Daily Site Journal / Daily Activity ProgramPn la
main:20-Jun-14We219.0018.3014,00-15,008.00LOT 6 - preparation of 2
copies for VO13 - PM's / 5r3 - Daily Site Journal / Daily Activity
ProgramAzi suntem n data
de:30-Jun-14Th319.0018.3014,00-15,008.00LOT 6 - VO 13 - scanning
and packaging to be sent to Buchares / 5r3 - Daily Site Journal /
Daily Activity ProgramTotal zile
rmase:-10Fr419.0018.3014,00-15,008.005r3 - Preparing Monthly Report
- June 2014 / 5r3 - Daily Site Journal / Daily Activity Programa
venit pe 26 iunie 2014Sa5Su6Mo719.0018.3014,00-15,008.005r3 -
Materials on Site / Daily Measurements - slope protection / 5r3 -
Daily Site Journal / Daily Activity
ProgramTu819.0018.3014,00-15,008.005r3 - Materials on Site / Daily
Measurements - culverts / 5r3 - Daily Site Journal / Daily Activity
ProgramWe919.0018.3014,00-15,008.005r3 - Materials on Site / Daily
Measurements - culverts, earthworks / 5r3 - Daily Site Journal /
Daily Activity ProgramTh1019.0018.3014,00-15,008.005r3 - Went on Tg
Jiu at Engineer Office with Antonio - disscution over IPS / Daily
Site Journal / Daily Activity Program
Fr1119.0018.3014,00-15,008.005r3 - Materials on Site / Daily
Measurements - general items / 5r3 - Daily Site Journal / Daily
Activity ProgramSa12Su13Mo1419.0018.3014,00-15,008.00Preparing
summary tabels for IPS 14 in order to send the IPS to Engineer /
5r3 - Daily Site Journal / Daily Activity
ProgramTu1519.0018.3014,00-15,008.00Preparing summary tabels for
IPS 14 in order to send the IPS to Engineer / Sent the IPS to
Engineer - the letter and a summary / 5r3 - Daily Site Journal /
Daily Activity ProgramWe1619.0018.3014,00-15,008.00Receiving
documents from the Quality Department (culverts) - Download,
classify them, put them in forlders, put them in summary sheets /
5r3 - Daily Site Journal / Daily Activity
ProgramTh1719.0018.3014,00-15,008.00Receiving documents from the
Quality Department (culverts, contilevels, slope protection) -
Download, classify them, put them in forlders, put them in summary
sheets / 5r3 - Daily Site Journal / Daily Activity
ProgramFr1819.0018.3014,00-15,008.00Receiving documents from the
Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put
them in summary sheets / 5r3 - Daily Site Journal / Daily Activity
ProgramSa1919.0018.3014,00-15,008.00Receiving documents from the
Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put
them in summary sheets / 5r3 - Daily Site Journal / Daily Activity
ProgramSu20Mo2119.0018.3014,00-15,008.00Went to Tg Jiu with
supporting documents for IPS 14 - Receiving documents from the
Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put
them in summary sheets / 5r3 - Daily Site Journal / Daily Activity
ProgramTu2219.0018.3014,00-15,008.005r3 - Materials on Site -
Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity
ProgramWe2319.0018.3014,00-15,008.005r3 - Materials on Site -
Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity
ProgramTh2419.0018.3014,00-15,008.00At Engineers office in Tg. Jiu
- Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity
ProgramFr2519.0018.3014,00-15,008.00At Engineers office in Tg. Jiu
- Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity
ProgramSa26Su27Mo2819.0018.3014,00-15,008.00LOT 6 - Clarifing
tabels for Liliana Toma in order to close the VO13 / 5R3 - Summary
of Materials on Site - Preparing the final attachments for IPS 14 /
5r3 - Daily Site Journal / Daily Activity
ProgramTu2919.0018.3014,00-15,008.00At Engineers office in Tg. Jiu
- Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity
ProgramWe3019.0018.3014,00-15,008.00At Engineers office in Tg. Jiu
- Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity
ProgramTh3119.0018.3014,00-15,008.00At Engineers office in Tg. Jiu
- Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity
ProgramTOTAL24192.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul37324397Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:7/29/14
ore lucrate192Verificare 00.00Rata /or10Curs4.3873Val
(Lei)8,423.62
August 2014Month/Mes:August / August / AgostoName of Company:
S.C. INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481August /
August / Agosto
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulFr119.0018.3014,00-15,008.005r3 -
Daily Measurements / Daily Site Journal / Daily Activity ProgramAm
primit masina pe:26-Jun-14Sa2115.0017.004.005r3 - Preparing the
Monthly Report - July 2014Azi suntem n data de:6-Aug-14Su3Total
zile de cand am masina:41Mo419.0018.3014,00-15,008.005r3 - At
Engineer Office in Tg Jiu for IPS 14 / Preparing the Monthly Report
- July 2014 / Daily Site Journal / Daily Activity
ProgramTu519.0018.3014,00-15,008.00LOT 5 - summary table for VO13
asked by Liliana Toma / Preparing the Monthly Report for July 2014
/ 5r3 - Daily Site Journal / Daily Activity
ProgramWe619.0018.3014,00-15,008.005r3 - Preparing the Photo Report
for July 2014 to be sent / 5r3 - Daily Site Journal / Daily
Activity ProgramTh719.0018.3014,00-15,008.00IPS 14 - daily
measurements, Receiving documents from the Quality Department -
calculations, processing in order to be sent and attached to IPC 06
- Daily Site Journal - Daily Activity
ProgramFr819.0018.3014,00-15,008.00IPS 14 - Went to Tg Jiu at
engineer office to hand over the documents - calculations in order
to be sent and attached to IPC 06 - Daily Site Journal - Daily
Activity ProgramSa9Su10Mo1119.0018.3014,00-15,008.00IPC 06 - Went
to Tg Jiu at engineer office to prepare along with Hyder QS the
ongoing IPC 06 - Daily Site Journal - Daily Activity
ProgramTu1219.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 06 -
Receiving documents from the Quality Department - calculations,
processing in order to be sent and attached to IPC 06 - Daily Site
Journal - Daily Activity ProgramWe1319.0018.3014,00-15,008.00Went
to Tg Jiu with supporting documents for IPS 14 - Receiving
documents from the Quality Department (culverts, contilevels, slope
protection, earthworks ) - Download, classify them, put them in
forlders, put them in summary sheets / 5r3 - Daily Site Journal /
Daily Activity ProgramTh1419.0018.3014,00-15,008.00IPC 06 - Went to
Tg Jiu at engineer office to prepare along with Hyder QS the
ongoing IPC 06 - Daily Site Journal - Daily Activity
ProgramFr1519.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 06 -
Daily Site Journal - Daily Activity
ProgramSa16Su17Mo1819.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu
at engineer office to prepare along with Hyder QS the ongoing IPC
06 - Daily Site Journal - Daily Activity
ProgramTu1919.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 06 -
Daily Site Journal - Daily Activity
ProgramWe2019.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 06 -
Daily Site Journal - Daily Activity
ProgramTh2119.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 06 -
Daily Site Journal - Daily Activity Program
Fr2219.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer
office to prepare along with Hyder QS the ongoing IPC 06 - Scanning
- Copies for CNADNR final preparation before sending - Daily Site
Journal - Daily Activity Program
Sa23Su24Mo2519.0018.3014,00-15,008.00IPS 15 - Under Construction -
Summaries of Unpaied items - planning works for the ongoing IPS -
Daily Site Journal - Daily Activity Program
Tu2619.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily
Site Journal - Daily Activity Program
We2719.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily
Site Journal - Daily Activity Program
Th2819.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily
Site Journal - Daily Activity Program
Fr2919.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily
Site Journal - Daily Activity Program Sa30111.0019.008.005r3 -
Stating Prepartion of the Monthly Report - August 2014 / IPS 15 -
Under Construction - Summary Sheet for IPS 15 items - General Items
- Daily Site Journal - Daily Activiy
ProgramSu31TOTAL23180.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul39723420Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:8/29/14
ore lucrate184Verificare 0-4.00Rata /or10Curs4.4008Val
(Lei)8,097.47
Septembrie 2014Month/Mes:Septembrie / September / SeptiembreName
of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile
rmase:305Septembrie / September / Septiembre
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulMo119.0018.3014,00-15,008.005r3 -
Preparing IPS 15 / Preparing the Monthly Report - August 2014 /
Daily Site Journal / Daily Activity ProgramA venit masina
pe:26-Jun-14Tu219.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at
Tg Jiu meeting with road engineer to clarify the supporting
documents/ Preparing the Monthly Report - August 2014 / Daily Site
Journal / Daily Activity ProgramAzi suntem n data
de:27-Sep-14We319.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at
Tg Jiu meeting with road engineer to clarify the supporting
documents/ Preparing the Monthly Report - August 2014 / Daily Site
Journal / Daily Activity ProgramTotal zile de cand am
masina:93Th419.0018.3014,00-15,008.005r3 - Preparing IPS 15 /
Preparing the Monthly Report - August 2014, scan, copies,
forwarding letter / Daily Site Journal / Daily Activity
ProgramFr519.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at Tg
Jiu meeting with QS in order to hand over and to present the
content of IPS / Preparing the Monthly Report - August 2014 / Daily
Site Journal / Daily Activity
ProgramSa619.0018.3014,00-15,008.00Daily Measurents - Cantilevels,
Culverts, Earthworks / Daily Site Journal / Daily Activity
ProgramSu7Mo8Tu9We10VACANTATh11Fr12Sa13Su14Mo1519.0018.3014,00-15,008.005r3
- Collecting informations about the status of supporting documents
/ Preparation of a List of Priorities in order to Support building
of the IPC / Daily Site Journal / Daily Activity
ProgramTu1619.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at
engineer office to prepare along with Hyder QS the ongoing IPC 07 /
Daily Site Journal - Daily Activity
ProgramWe1719.0018.3014,00-15,008.00IPC 07 - Working along with
engineer office to prepare along with Hyder QS the ongoing IPC 07 /
Daily Site Journal - Daily Activity
ProgramTh1819.0018.3014,00-15,008.00IPC 07 - Working along with
engineer office to prepare along with Hyder QS the ongoing IPC 07 /
Daily Site Journal - Daily Activity
ProgramFr1919.0018.3014,00-15,008.00IPC 07 - Working along with
engineer office to prepare along with Hyder QS the ongoing IPC 07 /
Daily Site Journal - Daily Activity
ProgramSa2019.0018.3014,00-15,008.00IPC 07 - Working along with
engineer office to prepare along with Hyder QS the ongoing IPC 07 /
Daily Site Journal - Daily Activity
ProgramSu21Mo2219.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at
engineer office for final preparations, scan, copies of the IPC in
order to e sent to Employer / Daily Site Journal - Daily Activity
ProgramTu2319.0018.3014,00-15,008.00IPS 16 - Starting prepation of
IPS 16, list with unpayed items, remaining cantileles, papers to
justify, earthworks and culverts / Daily Site Journal - Daily
Activity ProgramWe2419.0018.3014,00-15,008.00IPS 16 - Prepation of
IPS 16, list with unpayed items, remaining cantileles, papers to
justify, earthworks and culverts / Daily Site Journal - Daily
Activity ProgramTh2519.0018.3014,00-15,008.00IPS 16 - Prepation of
IPS 16, list with unpayed items, remaining cantileles, papers to
justify, earthworks and culverts / Daily Site Journal - Daily
Activity ProgramFr2619.0018.3014,00-15,008.00IPS 16 - Prepation of
IPS 16, list with unpayed items, remaining cantileles, papers to
justify, earthworks and culverts / Daily Site Journal - Daily
Activity ProgramSa27111.0019.0014,00-15,008.00IPS 16 - Prepation of
IPS 16, list with unpayed items, remaining cantileles, papers to
justify, earthworks and culverts / Daily Site Journal - Daily
Activity ProgramSu28Mo2919.0018.3014,00-15,008.00IPC 07 - Went to
Tg Jiu at engineer office for final preparations, scan, copies of
the IPC in order to e sent to Employer / Daily Site Journal - Daily
Activity ProgramTu3019.0018.3014,00-15,008.00IPS 16 - Starting
prepation of IPS 16, list with unpayed items, remaining cantileles,
papers to justify, earthworks and culverts / Daily Site Journal -
Daily Activity ProgramTOTAL20160.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul42020440Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:9/29/14
ore lucrate160Verificare 00.00Rata /or10Curs4.4152Val
(Lei)7,064.32
Octombrie 2014Month/Mes:Octombrie / October / OctubreName of
Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile
rmase:305Octombrie / October / Octubre
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulWe119.0018.3014,00-15,008.005r3 -
Preparing IPS 16 - at Tg Jiu meeting with road engineer to clarify
the supporting documents/ Preparing the Monthly Report - September
2014 / Daily Site Journal / Daily Activity ProgramA venit masina
pe:26-Jun-14Th219.0018.3014,00-15,008.005r3 - Preparing IPS 16 /
Preparing the Monthly Report - September 2014, scan, copies,
forwarding letter / Daily Site Journal / Daily Activity ProgramAzi
suntem n data de:29-Oct-14Fr319.0018.3014,00-15,008.005r3 -
Preparing IPS 16 / Preparing the Monthly Report - September 2014,
scan, copies, forwarding letter / Daily Site Journal / Daily
Activity ProgramTotal zile de cand am
masina:125Sa4Su5Mo619.0018.3014,00-15,008.005r3 - Preparing IPS 16
- Daily Measurements - culvers / Daily Site Journal / Daily
Activity ProgramTu719.0018.3014,00-15,008.005r3 - Preparing IPS 16
- Daily Measurements - contilevels / Daily Site Journal / Daily
Activity ProgramWe819.0018.3014,00-15,008.005r3 - Preparing IPS 16
- Daily Measurements - earthworks / Daily Site Journal / Daily
Activity ProgramTh919.0018.3014,00-15,008.005r3 - Preparing IPS 16
- Daily Measurements - slope protection / Daily Site Journal /
Daily Activity ProgramFr1019.0018.3014,00-15,008.005r3 - Collecting
informations about the status of supporting documents / Preparation
of a List of Priorities in order to Support building of the IPC /
Daily Site Journal / Daily Activity
ProgramSa1119.0018.3014,00-15,008.005r3 - Collecting informations
about the status of supporting documents / Preparation of a List of
Priorities in order to Support building of the IPC / Daily Site
Journal / Daily Activity
ProgramSu12Mo1319.0018.3014,00-15,008.005r3 - Collecting
informations about the status of supporting documents / Preparation
of a List of Priorities in order to Support building of the IPC /
Daily Site Journal / Daily Activity
ProgramTu1419.0018.3014,00-15,008.00Preparing Table - cost for
General Items - Variation Order 01.v1 / Daily Site Journal - Daily
Activity ProgramWe1519.0018.3014,00-15,008.00Preparing Table - cost
for General Items - Variation Order 01.v2 / Daily Site Journal -
Daily Activity ProgramTh1619.0018.3014,00-15,008.00IPS 16 - Daily
Measurement / Daily Site Journal - Daily Activity
ProgramFr1719.0018.3014,00-15,008.00IPS 16 - Daily Measurement /
Daily Site Journal - Daily Activity
ProgramSa18Su19Mo2019.0018.3014,00-15,008.00IPS 16 - Daily
Measurements/ Preparing Table - quantitier for H4B - Variation
Order 02.v1 / Daily Site Journal - Daily Activity
ProgramTu2119.0018.3014,00-15,008.00IPS 16 - Daily Measurements/
Preparing Table - quantitier for H4B - Variation Order 02.v2 /
Daily Site Journal - Daily Activity
ProgramWe2219.0018.3014,00-15,008.00IPS 16 - Daily Measurement /
Daily Site Journal - Daily Activity
ProgramTh2319.0018.3014,00-15,008.00IPS 16 - Daily Measurement /
Daily Site Journal - Daily Activity
ProgramFr2419.0018.3014,00-15,008.00IPS 16 - Prepation of IPS 16,
list with unpayed items, remaining cantileles, papers to justify,
earthworks and culverts / Daily Site Journal - Daily Activity
ProgramSa25Su26Mo2719.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu
at QS office to talk about the status of and to clarify issues, if
any / Daily Site Journal - Daily Activity
ProgramTu2819.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS
office talk about the status of and to clarify issues, if any also,
discutions with road engineer on issues of unreleased papers for
contilevels and eartworks / Daily Site Journal - Daily Activity
ProgramWe2919.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS
office talk about the status of and to clarify issues, if any also,
discutions with road engineer on issues of unreleased papers for
contilevels and eartworks / Daily Site Journal - Daily Activity
ProgramTh3019.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS
office talk about the status of and to clarify issues, if any also,
discutions with road engineer on issues of unreleased papers for
contilevels and eartworks / Daily Site Journal - Daily Activity
ProgramFr3119.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS
office talk about the status of and to clarify issues, if any also,
discutions with road engineer on issues of unreleased papers for
contilevels and eartworks / Daily Site Journal - Daily Activity
ProgramTOTAL24192.00Summary of Days Worked To
DateContractTOTALPreviousThis MonthCumul44024464Employee's
SignatureGeneral ManagerProject ManagerCrlig
Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin
Date:10/29/14
ore lucrate192Verificare 00.00Rata /or10Curs4.4152Val
(Lei)8,477.18
Noiembrie 2014Month/Mes:Noiembrie / November / NoviembreName of
Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere
contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin -
FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR
(5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din
05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY
TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile
rmase:305Noiembrie / November / Noviembre
DayDateDays WorkedHourWork
DescriptionOBS.ArrDepBreakCumulSa119.0018.3014,00-15,008.005r3 -
Preparing IPC 08 at Petrosani with Hyder's QS
Su2Mo319.0018.3014,00-15,008.005r3 - IPC 08 - At Tg Jiu - final
preparations for sending the IPC to Employer / Daily site Jurnal /
Daily Activity Program / Summary of payments -
EARTHWORKS-EXCAVATIONS - in preparation for IPS 17A venit masina
pe:26-Jun-14Tu419.0018.3014,00-15,008.005r3 - Went on Site -
Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal
/ Daily Activity Program / Summary of payments -
PAVEMENT-BALLAST-CRUSHED STONE-AB2-MILLING- in preparation for IPS
17Azi suntem n data de:7-Nov-14We519.0018.3014,00-15,008.005r3 -
Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow /
Daily site Jurnal / Daily Activity Program / Summary of payments -
CONSOLIDATIONS-SLOPE PROTECTION - BARRIERS - TORRENT BARRIER start
CANTILEVERS - in preparation for IPS 17Total zile de cand am
masina:134Th619.0018.3014,00-15,008.005r3 - Went on Site - Meeting
with mr. Chesnoiu - talking problems regarding cantilevel papers /
Bringing Papers / VO-3 preparation of quantities tables / Daily
site Jurnal / Daily Activity Program /
Fr719.0018.3014,00-15,008.005r3 - Went on Site - Measuring concrete
guard rails demolition and retaing wall demolitions on culverts /
Final review and preparation of the VO3 quantities table - Slope
Protection / Record papers of cantilevels / Daily site Jurnal /
Daily Activity Program / Sa819.0018.3014,00-15,008.005r3 - Office
paper work - Records of Cantilevers / Daily site Jurnal / Daily
Activity Program / Su95r3 - Photo Monthly Report / Daily site
Jurnal / Daily Activity Program / Mo1019.0018.3014,00-15,008.005r3
- Went on Site - Measuring concrete guard rails demolition and
retaing wall demolitions on culverts / Record of prepared papers
for cantilevels / Daily site Jurnal / Daily Activity Program /
Tu1119.0018.3014,00-15,008.005r3 - Went of Site to Arrange a
Meeting Between Topo Dep and Mr. Chesnoiu to clarify the issue of
milling for certification / Discutition over the Barriers for
Torrents in order to clarify the papers for payment (it results
that the papers are not clear for this type of works ) / also
discutions to clarify RNC 38 and 32 - discutions are on deadlock,
since the solution for RNC 32 is a new solution and it has no
approval, no notification prepared by Contractor => dificulty in
chargeing/cobrar the works / Record papers of cantilevels / Daily
site Jurnal / Daily Activity Program /
We1219.0018.3014,00-15,008.005r3 - Went on Tg. Jiu at Engineer
Office to meet mr. Chesnoiu to clarrify the problems with the
Cantilevers / Picking up papers for Certification / Record papers
of cantilevels / Daily site Jurnal / Daily Activity Program /
Th1319.0018.3014,00-15,008.00Went on site to measure the
Cantilevers 118+376 and 118+485 for clarifications regarding the
IPS / Record of demolition of concrete guard rails and existing
retaining walls on Culverts / Daily Site Journal / Daily Activity
Program.Fr1419.0018.3014,00-15,008.00Record of Milling /
Reevaluatioan of total quantities on slope protection an
preparation of the financial impact on this issue / Daily Site
Journal / Daily Activity Program /
Sa1519.0018.3014,00-15,008.00Montly Report - oct 2014
Su16Mo1719.0018.3014,00-15,008.005r3 - Monthly Report - oct 2014 /
Record of received papers / Preparing summary on New Jersey (as
material on site) issue / Preparing an Economical Impact Table with
Issues On IPC 09 / Daily site Jurnal / Daily Activity Program /
Tu1819.0018.3014,00-15,008.005r3 - Record of received papers -
printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the
Certification / Daily Site Journal / Daily Activity Program /
We1919.0018.3014,00-15,008.005r3 - Record of received papers -
printing / Tracking the way papers are prepared for the
Certification / Daily Site Journal / Daily Activity Program /
Th2019.0018.3014,00-15,008.005r3 - Record of received papers -
printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the
Certification / Daily Site Journal / Daily Activity Program /
Fr2119.0018.3014,00-15,008.005r3 - Record of received papers -
printing and went on Tg Jiu tu Engineer's QS Office to present them
and register them / Went on Road Engineer office to receive
supporting documents and also to clarify the issue with the tables
for the variations on milling and on AB2 that is going to replace
the BAD / Tracking the way papers are prepared for the
Certification / Daily Site Journal / Daily Activity Program /
Sa2219.0018.3014,00-15,008.005r3 - Record of supporting documents
in order to be prepared whan the quality documents are about to
have the final signatures / Also - record of cantilevels for
comparation beetwen the figures from production and the certified
figures / Daily Site Journal / Daily Activity Program /
Su23Mo2419.0018.3014,00-15,008.005r3 - Record of supporting
documents in order to be prepared whan the quality documents are
about to have the final signatures / Also - record of cantilevels
for comparation beetwen the figures from production and the
certified figures / Daily Site Journal / Daily Activity Program /
Tu2519.0018.3014,00-15,008.00IPC 09 - preparation on Tg Jiu (last
day / postoned for tommorow) We2619.0018.3014,00-15,008.00Final
preparations on supporting documents along with Quality Department
and Topo department / IPC 09