Top Banner
2 Presents INNOVATIONS IN WATERPROOFING SYSTEMS An AIA Continuing Education Program Credit for this course is 1 AIA/CES Learning Unit for HSW credit. Course Title: INNOVATIONS IN WATERPROOFING SYSTEMS Course Number: POL07A
54

0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

Dec 14, 2015

Download

Documents

Derrick Muckle
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

2

Presents

INNOVATIONS IN WATERPROOFING

SYSTEMS

An AIA Continuing Education Program

Credit for this course is 1 AIA/CES Learning Unit for HSW credit.

Course Title: INNOVATIONS IN WATERPROOFING SYSTEMS

Course Number: POL07A

Page 2: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

3

An American Institute of Architects An American Institute of Architects (AIA) Continuing Education program(AIA) Continuing Education program

Approved Promotional Statement:InfoSpec is a registered provider with The American Institute Of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates Of Completion for non-AIA members available on request.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA or Ron Blank & Associates of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

4

An American Institute of Architects An American Institute of Architects (AIA) Continuing Education program(AIA) Continuing Education program

Course Format: This is a structured, face to face course.Course Credit: 1 Health Safety & Welfare (HSW) learning unit (LU)Completion Certificate: A copy is sent to you by email upon request. When you fill out the Form B please indicate if you need one. Also please make sure the information you provide is legible. Send email request to: [email protected]

Design professionals please make sure and indicate request of certificate of completion when filling out the Form B at course conclusion. All AIA and non- AIA members who request a certificate of completion will be sent a copy of your certificate to the email address you provided in the Form B. Please make sure that when print your information that it is legible. If we can not read your writing we can not process your credit.

Page 4: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

5

Course ObjectivesCourse Objectives

After completing this course the participants

will have a better understanding of the

following:• Waterproofing Solutions that Protect the

Owner’s Investment By…– Improving Indoor Air Quality – Protecting Your Concrete Floors And Walls– Preserving Structural Integrity

Page 5: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

6

“Do You Know Why Most Vapor Barriers

Fail?”

Page 6: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

7

"85% of Vapor Barriers Fail"

Vapor barriers are a well known problem area in the design and construction field.

The problem comes from damage during construction.

There is significant disagreement on what materials to use, where to place vapor barriers, and how to specify construction methods to avoid damage.

What do we mean ?

Page 7: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

8

Where does the Where does the "85 %”"85 %” failure rate come from? failure rate come from?

The specific quote is taken from a consultant's report to the city of Los Angeles Department of Building and Safety:

"…With respect to HDPE (vapor barriers), please be aware that under normal field applications it has been observed to experience a high failure rate reported to be as high as 85% in some cases."

The full report, along with a listing of nine large projects known to be leaking and a Los Angeles Times article, can be found at this weblink:

http://saveballona.org/techpages/boot.html

Page 8: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

9

Page 9: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

10

ASTM E 1643 - 98 SPECIFICATION:Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs

FROM THE EXCERPTS ABOVE, IT LOOKS LIKE:1. Everybody on the ASTM committee agrees that these vapor barrier materials are likely to fail.2. The committee does not agree on a solution.

Need More Proof ?

Page 10: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

11

The following slides include:

I. A definition of vapor barriers

II. A discussion of current vapor barrier standards

III. A series of construction photographs which demonstrate the potential for construction abuse and damage to vapor barriers

IV. Extracts from materials standards, construction specifications, and engineering bulletins:

ASTMPortland Cement Association (PCA)American Concrete Institute (ACI)

Page 11: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

12

Typical Commercial Grade Vapor Barrier

Source: Portland Cement Association (#12958)

Page 12: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

13

DEFINITION OF VAPOR BARRIERS

The industry uses various terms for vapor barriers:

•Vapor Retarders•Vapor Barriers•HDPE•Polyethylene Film•Reinforced polyethylene films•Membranes, etc.

Most of the industry considers the terms to be interchangeable.

This presentation will use the term "Vapor Barrier"

Page 13: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

14

Vapor Barriers are virtually impermeable polyethylene films which, according to ASTM E 1643

"...provide a method of limiting water vapor transmission upward through concrete slabs on grade…”

Page 14: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

15One Typical Vapor Barrier Configuration

Vapor Barrier Configuration

Adapted from PCA Concrete Floors on Ground Engineering

Bulletin 075, Fig. 3.2

Page 15: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

16

Historically, few construction projects used vapor barriers. However, use has increased in recent years because of concerns about:

Damage to flooring above the slab by moisture

Concerns about toxic mold

Intrusion of chemical vapors and other hazardous contaminants from underground

Page 16: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

17

PROPERTIES FOR COMMERCIAL GRADE VAPOR BARRIERS

PROPERTIES FOR COMMERCIAL GRADE VAPOR BARRIERS

PROPERTY TESTS AS LISTED IN ASTM E 154 AND ASTM E 1745

PROPERTY ASTM TEST # CLASS A CLASS B CLASS C

PERMEANCE TO WATER VAPOR E 96 B < 0.3 PERMS < 0.3 PERMS < 0.3 PERMS

TENSILE STRENGTH E 154 SECTION 9 > 45.0 LBF > 30.0 LBF > 13.6 LBF

PUNCTURE RESISTANCE TO 1" STEEL ROD E 154 SECTION 10 2200 GRAMS 1700 GRAMS 475 GRAMS

PUNCTURE RESISTANCE TO FALLING DART D 1709 B 2200 GRAMS 1700 GRAMS 475 GRAMS

TYPICAL BARRIER THICKNESS D 1000 0.015" 0.010" 0.006"

Note: Puncture resistance requirements are expressed in GRAMS, instead of pounds.(2200 grams = 4.85 pounds, 475 grams = 1.05 pounds)

Page 17: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

18

Notice how thin this vapor barrier isSource: Portland Cement Association (#V2/144_5)

Page 18: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

19

On most large projects, steel reinforcement (REBAR) is installed over the vapor barrier.

The purpose of rebar is to minimize future cracking of the concrete slab, and to reduce warping or

curling.

Source: www.constructionphotographs.com (#a00305)

Page 19: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

20Source: www.constructionphotographs.com (#204602)

Rebar installation includes cutting, which creates both sparks and sharp edges.

Page 20: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

21

Rebar must be fastened atintersections to keep it evenly spaced.

In this photo, the rebar is being welded together. If this jobhad used a vapor barrier, holes could have been burnt.

Source: www.constructionphotographs.com

Page 21: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

22

After rebar installation is complete, there are usually many areas where sharp

edges touch the vapor barrier.

Source: www.constructionphotographs.com (#a00306-section zoom)

Page 22: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

23

There is also a lot of foot traffic onjobsites, as well as equipment.

Source: Portland Cement Association (#82_5a)

Page 23: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

24

Sometimes larger equipment isdriven over the vapor barrier.

Source: www.constructionphotographs.com (#a00305-section zoom)

Page 24: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

25

For this placement, 15 workers are standing in the mix, each one

endangering the vapor barrier.

Source: Portland Cement Association (57_19)

Page 25: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

26

Vigorous tool use.Source: Portland Cement Association (Vol. 2 #34)

Page 26: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

27

Vibration of the concrete is a widely used method of

consolidation.

One manufacturer, Vibco, offers vibrators with head

diameters between1-3/8” and 3”.

HEAD DIAMETER 1-3/8" 3"VIBRATIONS PER MINUTE 18,000 16,000

IMPACT FORCE - POUNDS 450 LBS 3200 LBSIMPACT FORCE - GRAMS 204,116

GRAMS1,451,956GRAMS

Sources: Wycotool (Vibrator Drawing) Vibco (Vibrator Specifications)

Page 27: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

28

If you haven't seen enough unintentional construction damage, we should mention intentional vapor barrier damage:

ASTM E 1643 - 98, section 6.3:

"Avoid use of stakes driven through vapor retarder"

PCA Engineering Bulletin 075, page 15:

"The practice of intentionally punching holes through a vapor retarder to allow bleed-water to exit the slab bottom is unacceptable because it defeats the purpose of the membrane."

Page 28: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

29

Summary of the problem:

1. Increased concerns about vapor penetrating slabs

1. A. Moisture damages flooring2. B. Toxic mold from moisture vapor3. C. Chemical vapor intrusion4. D. Lawsuit potential

1. The industry standard is Vapor Barriers made of polyethylene:

1. A. Thin 2. B. Industry standard for puncture resistance: so low

that it is expressed in GRAMS

1. ASTM E 1643 states that polyethylene vapor barrier materials are highly vulnerable to construction damage.

2. The big problem is construction damage.

Page 29: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

30

Under-Slab Membrane

THE INDOOR AIR QUALITY PROBLEMTHE INDOOR AIR QUALITY PROBLEM

Page 30: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

31

The Next Generation of Under-sealing Waterproofing Membranes

Page 31: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

32

Below grade self-sealing membrane system with a level of protection never before available.

These Products Act As Barriers To:• Moisture/Water• Methane Gas• Radon Gas• Toxic Contaminants• Termites• Pesticides• Stress Cracks

Problems:Sick Office

Solutions:Happy Office

Page 32: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

33

THE UNDER-SLAB MEMBRANETHE UNDER-SLAB MEMBRANE ACTS AS AACTS AS ABARRIER TO WATER & MOISTUREBARRIER TO WATER & MOISTURE

Geo-textile FabricRubberized Asphalt Polyethylene

• Reduces the amount and severity of cracking

-more facts

Page 33: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

34

UNDERSLABWATERPROOFING APPLICATION

Page 34: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

35

UNDER SLAB APPLICATION

UNDER-SLAB MEMBRANE

• 20 Mil Vapor Barrier - 500% Extra Thickness for Protection• Stress Absorbing/Barrier Formulation• Geotextile Fabric for Mechanical Bond to Concrete

Page 35: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

36

Underslab Membrane at a grade beam

Page 36: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

37

Page 37: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

38

THE BLIND SIDE MEMBRANE ACTS AS ABARRIER TO WATER & MOISTURE

Geo-textile FabricRubberized AsphaltPolyethylene

Page 38: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

39

BLIND SIDE MEMBRANEWATERPROOFING SYSTEM

• Geotextile Fabric for Bond to Concrete• Stress Absorbing Barrier Formulation• High Density, High Strength

Polyethylene

NEGATIVE SIDE MEMBRANE FOUNDATION WALL APPLICATION

Page 39: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

40

Blindside Membrane with Shot-crete

Page 40: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

41

Blindside Membrane

Page 41: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

42

Blindside Membrane

Page 42: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

43

THE SPLIT SLAB MEMBRANETHE SPLIT SLAB MEMBRANE ACTS AS AACTS AS ABARRIER TO WATER & MOISTUREBARRIER TO WATER & MOISTURE

Rubberized Asphalt20 mil. Polyethylene

Page 43: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

44

BETWEEN SLAB WATERPROOFING APPLICATION

SPLIT SLAB MEMBRANE

• 20 Mil Backing - 500% ExtraThickness for Protection

Page 44: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

45

Balcony application of Split Slab Membrane

Page 45: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

46

Split Slab Membrane1,100 penetrations detailed with1- or 2-part liquid membrane

Page 46: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

47

THE PROTECTED WALL MEMBRANETHE PROTECTED WALL MEMBRANE ACTS AS AACTS AS ABARRIER TO WATER & MOISTUREBARRIER TO WATER & MOISTURE

Rubberized Asphalt20 mil. Polyethylene

Page 47: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

48

VERTICAL WALL WATERPROOFING APPLICATION

PROTECTED WALL MEMBRANE

• Built-in Protection(Drainage Composite Optional)

Page 48: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

49

Protected Wall Membrane

Page 49: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

50

Anti-fracture membranes protect ceramic tile by providing a stress absorbing layer between the substrate and the tile. If the concrete substrate underneath cracks, the stress of the crack is not transferred up to the brittle ceramic tile. The stress is absorbed by the rubbery nature of the rubberized asphalt.

ANTI-FRACTURE MEMBRANESANTI-FRACTURE MEMBRANES

Page 50: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

51

ANTI-FRACTURE MEMBRANE

CONCRETE

CRACK

CERAMIC TILE

LATEX MODIFIED THINSET

GUARDING TILE FROM STRESS FRACTURESGUARDING TILE FROM STRESS FRACTURES

COMPONENTSFabric-bond to ThinsetStress Absorbing Membrane

Page 51: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

52

FREEZE FREEZE // THAWTHAWCYCLESCYCLES

During cold weather, slabs

contract away from each other.

In hot weather, slabs expand towards each

other.

OVERLAY OVERLAY

OLD CONCRETESLAB

OLD CONCRETESLAB

PAVEMENT BASE PAVEMENT BASE

Page 52: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

53

Under-slab Membranes seal out:• Moisture• Termites• Methane Gas• Radioactive Radon Gas• Mold• Pesticides and Other Toxic Chemicals

Under-slab Membranes act as ANTI-FRACTURE

MEMBRANES FOR SLABS• Continues sealing even under new cracks or

moving joints• Reduces the amount and severity of cracking in

slabs above the membrane.• Provides waterproofing, not just a vapor protection.

IN SUMMARY:IN SUMMARY:

Page 53: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

54

Course QuestionsCourse Questions

This concludes the continuing education course. The next 15 minutes will be focused on discussing the course material.

Page 54: 0 PRESENTERS: Please read the speaker notes on this slide before every presentation of this course. It is important to adhere to the guidelines. This slide.

55

THIS CONCLUDES:THIS CONCLUDES:

INNOVATIONS IN WATERPROOFING

SYSTEMSAn AIA Continuing Education Program

Credit for this course is 1 AIA/CES Learning Unit for HSW credit.

Course Title: INNOVATIONS IN WATERPROOFING SYSTEMS Course Number: POL07A